Object of the contractRepair and maintenance services of boilers
Description: Contract notice: Repair and maintenance services of boilers
Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 50531100, 45259300, 50531100, 45259300, 42514000
CPV Description: Repair and maintenance services of boilers.
Heating-plant repair and maintenance work.
Machinery and apparatus for filtering or purifying gases.
Modernization of the pressure part and auxiliary systems of the OFz450A boiler and repair of the OFz450A boiler bag filter with replacement of filter bags at Żerań CHP
Reference Number: 19DOZZ902
The subject of the order is madee by the Contractor for the benefit of the Employer of modernizing the pressure part and auxiliary systems of the OFz450A boiler and repair of the OFz450A boiler filter bag with the replacement of filter bags at the Żerań CHP Plant together with the supply of necessary materials, spare parts, apparatus and equipment, structural elements and installations as well as preparation of preparatory documentation and abovekonawcza.
Main Site: Elektrociepłownia Żerań, ul. Modlińska 15, 03-216 Warsaw
The subject of the contract is the Contractor's modernization of the pressure part and auxiliary systems of the OFz450A boiler at the Żerań CHP Plant together with the supply of necessary materials, spare parts, apparatus and devices, structural elements and installations, and preparation forpreparatory documentation, technical executive and as-built documentation.
A detailed description of the subject of part 1 of the contract is included in the model contract 19DOZZ902-1 constituting Annex 4 to the Instructions for Contractors. economic activity, if separate provisions inrequire an entry in the register or records to confirm that there are no grounds for exclusion under Article 24 paragraph 5 point 1 of the Act.
1. Contractors are excluded from the proceedings who:
- have not demonstrated compliance with the conditions for participation in the procedure, or have not demonstrated the absence of grounds for exclusion,
- the Contractor being a natural person who has been validly convicted of an offense:
a) referred to in art. 165a, art.181 188, art. 189a, art. 218 221, art. 228 230a, art. 250a, art. 258 or art. 270 309 of the Act of 6.6.1997 Penal Code (Journal of Laws item 553, as amended) or Art. 46 or art. 48 of the Act of 25.6.2010 on sport (Journal of Laws of 2016, item 176),
b) of a terrorist nature, referred to in Art. 115 - 20 of the Act of 6.6.1997 Penal Code,
c) tax,
if the current memberthe management or supervisory body, a company partner in a public or partnership company, or a general partner in a limited partnership or limited joint-stock partnership or a commercial proxy, a convicted person has been validly convicted of an offense referred to in art. 24 paragraph 1 point 13 (excluding the conviction of that person for an offense listed in Article 24 (1) (13) (d) of the Act, Article 133 (4) of the Act),
- for whomfinal judgment of the court or final administrative decision on arrears with payment of taxes, fees or contributions for social or health insurance, unless the Contractor has made payments of taxes, fees or contributions for social or health insurance together with interest or fines or has concluded a binding agreement on repayment of these debts, which - as a result intendedhis act or gross negligence mislead the Employer in providing information that he is not subject to exclusion, meets the conditions for participation in the proceedings or objective and non-discriminatory criteria, hereinafter referred to as "selection criteria", or who has concealed this information or is unable to provide the required documents,
- who as a result of recklessness or negligence presented othersformations misleading the Employer, which may have a significant impact on the decisions taken by the Employer in the procurement procedure,
- which unlawfully influenced or attempted to influence the Employer's activities or obtain confidential information that may give him an advantage in the procurement procedure,
- which took part in the preparation of the contract award procedure orwhose employee, as well as a person performing work on the basis of a mandate contract, work contract, agency contract or other contract for the provision of services, took part in the preparation of such proceedings, unless the distortion of competition caused by this can be eliminated in any other way than by excluding the Contractor from participation in proceedings, which - with other Contractors, entered into an agreement aimed at betsthe price of competition between Contractors in the contract award procedure, which the Awarding Entity is able to demonstrate by means of appropriate evidence,
- being a collective entity against which the court has ruled out a prohibition to apply for public contracts,
- against which a preventive measure has been imposed for public procurement,
- Contractors who belong to the same gcapital group submitted separate offers, offers, unless they show that the existing relationships between them do not lead to distortion of competition in the procurement procedure,
- in relation to which liquidation was opened or whose bankruptcy was announced, except for the Contractor who, after the declaration of bankruptcy layout approved by a final court decision.
contractors who:
Are in an economic situation, i.e. have an annual average income of at least PLN 20, 000, 000.00 (say: twenty million Polish zlotys) for the last 3 financial years, and if the period of activity is shorter then such average annual revenue for this period, the condition applies to 1 part of the order
Average annual revenue Contractororders on the basis of the "Profit and loss account" part of the financial statement (item "Net revenues from the sale of products, goods and materials" or "Net revenues from sales and compared with them") or in the case of Contractors not obliged to draw up the above-mentioned documents, other documents determining turnover and liabilities. The average annual revenue is the sum of revenues from the last 3 years of turnoverdivided by 3, and if the period of business activity is shorter, the average annual income is the sum of revenues from this period divided by the number of years corresponding to this period. If the revenue is given in foreign currencies, then the Employer will convert them according to the average exchange rate of the National Bank of Poland, Table A, published as at the day of sending the contract notice for publication in Dzienniktowards the Official Journal of the European Union. In the absence of publication of the exchange rate of this currency by the National Bank of Poland on the day referred to above, the Employer will use the average exchange rate of this currency last announced by the National Bank of Poland before the abovementioned day.
In the case of Contractors jointly applying for the contract to check compliance above. condition, the amount of revenues of Performerscow submitting joint bids are added together.
Purchaser based on art. 24aa section 1 of the Public Procurement Law may first evaluate the offers, and then examine whether the Contractor whose offer has been assessed as the most advantageous, is not subject to exclusion and meets the conditions for participation in the proceedings. .2019 on the premises of EC Żerań in Warsaw at ul. Modlińska 15. Meeting at 10:00 at the porter's lodge. Participation in the local vision is not mandatory. The Contractor by 09/12/2019 until 12:00 will send the Employer to the e-mail address
[email protected] or
[email protected] a list of people who will take part in the local vision with names, surnames and numbersID cards or passports (for foreign citizens). For organizational reasons, the Employer asks each Contractor to post up to 3 persons.
The offer under pain of nullity should be made in electronic form and submitted via the tender platform at https://termika.eb2b.com.pl/. The offer with all attachments is submitted in electronic formthree qualified electronic signature or a certified copy of the original by submitting a qualified electronic signature by the Contractor. All documents drawn up in a foreign language must be submitted together with their translations into Polish.
The offer and attachments must be signed (with an electronic signature) by the person (s) authorized to representawcy. The authorization (power of attorney) to sign the offer should be attached to the offer, unless it is clear from other documents attached by the Contractor. ") together with all its attachments
In order to pre-confirm that the Contractor is not subject to exclusion and meets the conditions for participation in the procedure, the Contractor attaches to the offer a current statement as at the date of submission of offers in the form of a uniform document available in editable form and the file 19DOZZ902-espd-request.xml posted on website of the Employer.
Contractor who refers to other resourcesentities, in order to demonstrate the absence of grounds for exclusion and compliance with them, to the extent that reference is made to their resources, conditions for participation in the proceedings, submits in the original in electronic form also uniform documents regarding these entities, signed by the entity whose documents apply.
In the event of joint application by the Contractors, uniform dthe document shall be submitted in an original electronic form by each of the Contractors jointly applying for the contract. These documents confirm the fulfillment of the conditions for participation in the procedure and the lack of grounds for exclusion to the extent that each of the Contractors demonstrates compliance with the conditions for participation in the procedure and the lack of grounds for exclusion. The Employer in accordance with art. 29 paragraph 3a of the PPL Act requires employmentby the Contractor based on the employment contract of persons performing Executive supervision over the implementation of the subject of the contract, the Contractor shall submit a declaration contained in Annex 1 to the instructions for Contractors.
Internet address (URL): www.termika.pgnig.pl