Object of the contractRepair and maintenance services of boilers
Description: Contract notice: Repair and maintenance services of boilers
Authority Type: Utilities entity
Contact Nature: Services
Procedure: Negotiated procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 50531100, 50531100, 50531100
CPV Description: Repair and maintenance of boilers.
II. Rebuilding of Kazan (high pressure 100bar hotplate piping system).
Reference Number: ME ZRt 21/2017
II.Construction of the boiler (high pressure 100bar hot-pipe piping system) (1)
Main Site: Matrai Erőmű ZRt. 11.
II. Rebuilding Kazan (high pressure 100bar hot tub piping system) (1 piece)
The Matrai Power Plant ZRt. II. horsetail 320 t / h steam generator, which is fired by a steel structure, with a kieselguhr, watercress, natural circulatory system, with drummer, irradiated firebox, fresh-water and refreshed heaters, eco-type tap water preheater, regenerative heating system with dewatering fire-extinguishers.
Boiler max. steam supply of 320 t / h
Fresh water uezemiPressure 133 bar.
Safety valve valve:
- dumbbell 162 bar,
- fresh steam tank 142 bar.
Leverage pressure 165 bar.
Probanyomas 206 bar.
Fresh water heaters 540 C.
Water vapor heat meter 540 C.
Tapviz uezemi thermocouple with preheaters 240 C.
Heat transfer and water / steam vapor on hot silk swabs
Characteristics of material: St35.8, 16Mo3, 13CrMo44, 10CrMo9-10.
Sign
25-60 mm
Typical pipe wall thickness range: 4-7 mm
The replenishment tube is designed to be repaired and repaired on the boiler's tap water heater, boiler, recirculation and re-drainage piping systems. The replenishment of the boiler is to ensure that the boiler is equipped with a water heater in the range of 6 to 7.
From the heat load, the strong cutoff power and the thermal faucet, the bodies of the elves are worn out and deformed. The project is designed to replace the seruents, to repair the hairs, to exchange the seruents, to arrange other work related to these activities as well. the restoration of the pipe tile, the burning of the welding rods, the repair of bands and steel structures, hot plate and insulation restoration.d: In the justifications, there is no possibility of reconsideration, disclaimer and reasonableness of any economic operator to whom the Kbt. (1) (2) of Section 62 of the Code of Conduct. (X.30.) On the basis of Article 1 (1) of the Decree on the resignationwhen submitting this, you must confirm in advance that ESPD does not belong to the Kb. The exclusion of the grounds for exclusion set out in Article 62 (1) (2). (X.30.) On the basis of Section 3 para. (1) of the Decree of the Respondent to the Respondent submits to the Respondent, - and the sub-schedulein accordance with - 2. In the event of a complaint to the complainant, all applicants must submit a form submission to the complainant in the case of a complaint to the complainant in accordance with - 2.
In the case of the subproblems that are not eligible to be returned to the Respondent, (4) of Section 67 of the Constitution. The statement is stillit must be granted if the provider did not mention the name of the subprojects known in the list. "
321/2015. (X.30.) On the basis of Article 15 para. (1) of the Decree on the rescheduling of a suitably justified sub-enterprise or body, only the ESPD shall be tried by the Kbt. 62. - The exclusion of the grounds for exclusionnn non-pool statement should be made for the given policy.
Economic operators should also be obliged to include in the form, Which body is eligible for the chapter certificates According to Section 69 para. (11), the complainant considers the grounds for exclusion as well as the special features-For database databases, these databases must be accessible to the hosts in the appropriate format of the form.
Kbt.69. (4) of the Act on the Provisional Institutions of Self-Government of Hungary: • The number of persons applying for resettlement in Hungary and, where applicable, the eligible economic operator (s) shall be 321/2015. (X.30.) Government DecreeSection 8 of the Tender Ordinance. The exclusion criteria contained in Article 62 para. (1) and (2) do not exist.
In the case of a non-Hungarian resident, the date is 321/2015. (X.30.) Korm. Decree and declarations in accordance with - 10.
- The supervisor shall raise the attention of 321/2015. (X.30.) On the application of - 11 - 16.
Ajanlatkforce applies the following submutates of the Koezbeszerzesi Hatosag:
- Koezbeszerzesi Hatosag Utmutatoja KE 2016. evi 31, 16.3.2016
Preliminary verifier mod:
- The resigning candidate is the Kormany 321/2015. (X. 30.) of the Government of the Republic of Hungary, in accordance with Article 1 (1) of the Decree of the European Parliament and of the Council of the European Union on the issuance of the relevant information- In case of a test case, all of the candidates for the trial will be notified of the form.
In the case of ESPD, a candidate for IV is a candidate for resignation. section. The IV. you must declare all the information that is s(4) - Paragraphs (4) - (8) of the Kbt., may be used to refer to the reseller as a matter of course:
Verify the modalities of the time you spend on:
In accordance with the provisions of Section 69.- (4) - (6) of the Kbt.all the time, he did, with all his intentions. Before issuing the roll-up document, a sufficient time-limit for fire will be provided by this person (s) to submit the documents justifying that the time-consumer is in compliance with the applicable requirements.
P1: Responding to Government Decree 321/2015 (X.30.) Article 19 (1) (c)point P2 must be enclosed in the last week of the previous quarter, or if it is no longer a letter to the letter, its statement is from the point of view of the arbitrator. Section 65 (1) a) and 321/2015. (X.30.) Korm. Pursuant to Article 19 (1) (b) of the Hungarian Civil Code, the pre-emptiveto make sure that they are available on the website of the ceginformation service, and that they will not be able to do so. the Kbt. In case of a non-Hungarian case, the applicant shall submit a request for a relevant verbal or informal translation into Hungarian.
If the person who has filed a complaint in accordance with P2he does not have the full length of time because he began the artificial life after the start of the period, the amount of the allowance was 321/2015. (X.30.) Korm., In accordance with the provisions of Section 19 (2) of the Hungarian Civil Code, you can justify the purchase of a subordinated sales tax of at least HUF 100 000 000 (one hundred million forint)• Installers who are not in Hungarian Forint will open for the rescheduled application for the first time in the official MNB official exchange rate for the last day of the period.
1.The reseller's application form is available at the Kbt. - 66. - 2.a) The times must be submitted electronically, the system can be made availableIn this case, the interested economic operator must submit a request to the
[email protected], which must give the name, address, name and address of the interested economic operator. If this is the case, the Provider will provide the crossword system on the system.
2.b) Provider of the Koezbeszeszi documents as a prospective or a named Sub-Asset according to point I.3-(Section 57 para. (2)). Hianypotlas and contact person is looking for the Kb. According to Section 71, by not granting a promoter to a new hianypotlast if he enters the economic operator not previously registered with the Hianypotlas at the time of the resigned application, it would be unnecessary to consider another Hianypotlas. Respectful section of the resultsplanned date of the pilot: 21.11.2017
Scheduled time of the contact person to be scheduled on: 21.11.2017.
Responses to the deadline for applications: 3.11.2017. Time: 9:00 hrs Place: electool.com;
Scheduled date of the date of the broadcasting session: 20.12.2017
Scheduled date of the author: 30.12.2017
5. It is a sign of resignationit is necessary to know whether there is any change in the record entry before the cogbirosag. If so, then 321/2015. (X. 30.) Korm. Decree of the Ministry of Education and Science of the Republic of Hungary, the date of the application must be attached to the cegbirosag entered into the registration note and the certificate from which the cegbirosag altal is justified. The time is given for the lowest arbitral award.
7. THEz is a fan of the information that, due to the lack of ownership or resources, or because of the changes in the electricity market, the service of a respectable cloud service may be unsuitable.
8. In case of candidates who are interested in the case, please enclose to the Reszvetelre Candidates sentenced to death. Article 35with a content statement.
9. The application will call attention to the Kb. Observe the rules of sections 35- to 36.
10. The Provider will test the winner on the contractor or winner, or if he or she has not verified the opportunity to match the time with the best-performing organization (eyeball) if the time is upalasarol expressed in the oesszegezes of the salt mill.
11. The timekeeper in the Pensuine, technical, and economical facilities provides a stark picture of the list of qualified travelers. Tender Officer in this Procurement Review Procedure for the Kbt. 75. - (2) (e) of the Act on the Beneficiary.
13.The respected applicant must declare the re-if you have a minimum two times a claim, you may be liable to 100, 000, 000 HUF or a professional liability insurance contractor or you will be in the case of your winner. ESPD, other declarations and declarations shall be submitted in accordance with ---77 (2). The accreditation accredited in Targyi koezbeszerzesi, Urban Zsuzsanna (register 00246).
16. With regard to the proper rules of labor law applicable to the breaches of labor services, the provisions of Article 7 (1) of Decree 307/2015 (X.27.) Of the Government of the Republic of Hungary, with the exception of the provisions of the law,
Internet address (URL): http://www.mert.hu
Directive: Classical Directive (2014/25/EU)