Tender notice from Bulgaria, published on 06 Mar 2018.
Executive Summary
The ?????? ????????? has issued a Tender notice for the procurement of a Contract notice: Refuse-collection vehicles in the Bulgaria. This Tender notice was published on 06 Mar 2018 and is scheduled to close on 10 Apr 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 21242671, while the tender notice number is 097976-2018 and Register on the platform.
Object of the contract Refuse-collection vehicles Description: Contract notice: Refuse-collection vehicles Authority Type: Regional or local authority Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 34144511, 34142000, 34144511, 34142000, 34144510, 34142100, 34928480 CPV Description: Refuse-collection vehicles. Crane and dumper trucks. Vehicles for refuse. Elevator-platforms trucks. Waste and rubbish containers and bins. Delivery of Used specialized equipment and new underground containers for the needs of Sandanski four lots Delivery of specialized equipment second hand and new underground containers for the needs of Sandanski in four distinct Technical Requirements: Total weight - up to 18 tons, engine power - min. 145 kW, fuel - diesel, emission of exhaust gas - min. Euro 3, date of first registration - after 1 January 2005, load capacity - from 6 to 12 tonnes, lifting of the lug - by hydraulic means, differential lock - yes, overall sizeand: medium-mounted chassis mounted - up to 18 tons, axle number - 2, height - max. 4, 0 m, cabin: cabin layout - on the chassis, seat - adjustable, vibration dampening suspension, control - electro-hydraulic, control signaling, working lights - min 2 forward, : warranty - minimum 6 months, service - up to 48 hours Completely equipped and charged with all necessary fluids on all systems Crane truck with crane Year of first registration - after 1 January 2003; mileage - maximum 300, 000 km; wheel formula - 4x2, two axle; steerable front axle; total mass - no more than 20 t; engine type - diesel; engine power - minimum 145 kW. Ecological Norm - Minimum Evo 3; gearbox - manual or automatic; braking system - pneumatic with ABS and ASR. Cabin - high cabin with flat floor; number of seats 1 1 or 1 2, ergonomic driver's seat, steering wheel - left, air conditioning, radio, cab roof, tachograph, power windows and mirrors, central locking, adjustable steering wheel, on-board computer with display on the dashboard the driver, the tricklighting and signaling for safe operation, two lamps for a specialized vehicle, 1 projector number mounted in the back of the booth for illuminating the operating platform of the superstructure, 1 number of floodlights mounted on the cab ceiling to illuminate the load compartment the night-time truck, rear panel lights, reflective stickers and strips, triangulark, first aid kit, fire extinguisher, reflective vests; tool box and equipment with a minimum volume of 0.1 m, 2 pcs. (1 m height), vinyl cover to protect against waste spraying made of PVC-coated polyester textile (bluearable tarpaulin with a weight of 900 g / m2 Hydraulic crane superstructure for stationary underground containers with a volume of 3 m, Hydraulic crane with a breaking arm, mounted directly on the truck, behind the cab, with a control panel for the superstructure. There is no requirement. The assignor removes from participation in a procurement procedure a participant when: 1. has been convicted by having entered into force atthe court, unless rehabilitated, for crimes under Art. 108a, Art. 159a-159d, Art. 172, Art. 192a, Art. 194-217, Art. 219-252, Art. 253-260, Art. 301-307, Art. 321, 321a and Art. 352-353e of NK; has been convicted by a judgment which has entered into force unless rehabilitated for crimes analogous to those referred to in paragraph 1 in another Member State or the third country; there are duties for taxes and obligations insurance installments per cm-Art. 162, para. 2, item 1 of the TIPC and the interest thereon to the state or to the municipality where the contracting authority and the participant are located or analogous obligations established by an act of competent authority according to the legislation of the state where the participant is established, deferral, deferral or collateralisation of obligations or obligation under an act which has not entered into force; there is noin the Art. 44, para. 5 of the Public Procurement Act; has been found to: (a) Provide a document of untrue content relating to the lack of grounds for removal or enforcement of the selection criteria; (b) has not provided the required information relating to the verification of the absence of grounds for removal or the fulfillment of the selection criteria; is found by a punitive order or a court that has entered into forcebut a decision that, in the course of performance of a public procurement contract, violated Art. 118, Art. 128, Art. 245 and Art. 301-305 from CT or anal. an obligation established by an act of a competent authority under the law of the country where the participant is established; 7. there is a conflict of interest that can not be eliminated. No participant, for whom the circumstances under item 3, item 2, when: 1. it is necessary to protect particularly important state or public interests; the amount of unpaid taxes or social security contributions payable is not more than 1% of the amount of the annual total turnover for the last completed financial year. The Contracting Authority shall remove from participation a participant for whom there are grounds under Art. 55, para. 1, item 1-p. 5 of the Public Procurement Act. Can not join a person who is a regin preferential tax jurisdictions and related persons, including through citizenship. a company in which a company incorporated in such a jurisdiction participates. The measures taken for reliability under Art. 56 of the PPA are described in EEDOP. Documents certifying the absence of grounds for removal are listed in the documentation for participation. When submitting the offer, the participant declares a missing(EEDOP) with the provision of the relevant information required by the Contracting Authority, the financial resources under this contract will be provided by accrued calculations under Art. 20 of Ordinance No 7 of 19 December 2013 on the procedure and method for calculating and determining the amount of collateraland deductions required for the disposal of waste (State Gazette No 111 of 27 December 2013, amended and supplemented No 7 of 20 January 2017). At the moment of the announcement of the present procedure, there is no financing for the implementation of the objects, which are the subject of the public procurement. The Contracting Authority shall provide in the draft contract a clause on deferred execution under Art. 114 of the Public Procurement Act. In this case each of thethe parties may request the termination of the contract without notice after the expiration of three months from the conclusion of the contract The guarantee for performance of the contract is 3% of the value of the contract without VAT The guarantee may take the form of:, transferred to the bank account of the Contracting Authority: IBAN: BG22SOMB91303360554000 BIC - SOMBBGSF, Bank: Municipal Bank.the contractor shall choose to submit a performance guarantee in the form of insurance covering the performance by covering the contractor's liability, the insurance shall meet the following requirements: the insurance sum on the insurance should be equal to 3% (three percent) of the value of the contract without VAT - the insurance must be concluded for the particular doggo- the insurance premium must be payable once with a term of validity of at least 30 days after the term of performance of the contract, or - an unconditional and irrevocable bank guarantee, issued in favor of the contracting authority, with a term not less than 30 days after the expiration of the term of the contract. or - insurance covering performance by covering the responsethe contractor Internet address (URL): www.sandanskibg.com Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Refuse-collection vehicles was 10 Apr 2018. Bidding is closed.
This tender has been issued by ?????? ????????? in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 34144511 - Refuse-collection vehicles, 34142000 - Crane and dumper trucks, 34144510 - Vehicles for refuse, 34142100 - Elevator-platforms trucks, 34928480 - Waste and rubbish containers and bins.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 21242671. The purchaser document reference is 097976-2018.