PÉCS MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA has floated a tender for Contract notice: Refurbishment of run-down buildings. The project location is Hungary and the tender is closing on 25 Sep 2018. The tender notice number is 361106-2018, while the TOT Ref Number is 25977665. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Refurbishment of run-down buildings

Deadline : 25 Sep 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 25977665

Document Ref. No. : 361106-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : PÉCS MEGYEI JOGÚ VÁROS ÖNKORMÁNYZATA
Office Name: Pécs Megyei Jogú Város Önkormányzata
Address: Széchenyi tér 1.
Town: Pécs
Postal Code: 7621
Contact Point: Dr. Eötvös Gábor

Phone: +36 72514802
Fax: +36 72514810
Hungary
Email :kozbeszerzes@pvfzrt.hu
URL :http://www.gov.pecs.hu

Tender Details

Object of the contract
Refurbishment of run-down buildings

Description: Contract notice: Refurbishment of run-down buildings

Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45262690, 45262690, 39100000, 39171000, 42416000, 45111100, 45261210, 45261400, 45262300, 45262500, 45262700, 45310000, 45312100, 45312310, 45330000, 45331210, 45410000, 45421100, 45430000, 45442100, 71320000, 71356400, 79932000, 45262690, 39100000, 39171000, 42416000, 45111100, 45261210, 45261400, 45262300, 45262500, 45262700, 45310000, 45312100, 45312310, 45330000, 45331210, 45410000, 45421100, 45430000, 45442100, 71320000, 71356400, 79932000
CPV Description: Refurbishment of run-down buildings.

Furniture.

Display cases.

Lifts, skip hoists, hoists, escalators and moving walkways.

Demolition work.

Roof-covering work.

Sheeting work.

Concrete work.

Masonry and bricklaying work.

Building alteration work.

Electrical installation work.

Fire-alarm system installation work.

Lightning-protection works.

Plumbing and sanitary works.

Ventilation installation work.

Plastering work.

Installation of doors and windows and related components.

Floor and wall covering work.

Painting work.

Engineering design services.

Technical planning services.

Interior design services.

Pecs, Regeszeti Muzeum fejlesztese

Reference Number : EKR000108412018

Pecs varosanak a TOP-6.1.4-15 szamu „Tarsadalmi es koernyezeti szempontbol fenntarthato turizmusfejlesztes" cimű palyazati feIt is possible to explore the most spectacular spot on the famous Reges Museum, which is a monumental building. This is the best way to develop the major cultural and landscape sites on the stretch of support.

Main Site: 7621 P-cs, Kaptalan u. 5. The evaluation of the project will include a full-scale reconstruction of the monumental monument,

Main activities:

- interior design of the building

- interior and exterior renovation

- archery roof

- renovation of the roof

- interior yard cover

- full evacuation of the whole building

- full renovation of the building

- free of flats



- interior design and design

- garden furniture

- fresco restauralas

- stone wall restoration

Helyisegli(basement floor):

Basement: 276.73 m.

Basement: 746.31 m.

Floor: 590.14 m.

Useful basement floor: 1 613.16 m.

Architectural renovation: BA-04D / E0 / 530-41 / 2015

Main quantities:

Roof structure steel reinforcement: 9, 5 t

Other steel structures and concrete: 23 t

Fireproof veneer: 485 m

Carrier wall: 100 m

Valfall wall: 490 m

Athidal beepites: 24 pcs

Feather: 200 m

Fueggoenyfal: 15 m

Surface preparation: 980 m

Surface finishing: 3 140 m

Ventilation plaster: 560 m

Honeycomb plastering: 1 010 m

Internal plaster on a tough surface: 800 m

Gypsum plasterboard floor: 553 m

Roofing: 980 m

Wall covering mazas with ceramic honey: 208 m

Wall covering for masonry or marble: 115 m

Masonry or marble flooring: 471 m

Glazing with padlocks: 62 m

Industrial p: 40 m

Sloping slope: 494 m

Sliding wall: 105 m

Sliding window: 450 m

Sloping slope: 37 pieces

Sliding door frame: 61 Sliding door and aluminum slats: 21 pieces Jarhato sliding door: 30 m

Wall and wall tiles: 165 m

Inner paint: 4400 m

Inner paint: 1 100 m

Surface waterproofing: 552 m

Surface waterproofing: 560 m

Surface waterproofing: 420 m

High temperature heat insulation882 m

Flat roof insulation: 565 m

Surface finish: 121 m

Lift (13.65 m lifting height): 1 piece

Ivestheres: 540 m

Exit: 830 m

Placement of sanitary units: 28 pieces

Electric hot water tank: 8 pieces

: 1 db

VTS ventilation system: 3 pieces

Heating and padlofitting pipes: 6 400 m

Insulated strong wires: 9 600 m

Lampak inset: 860 pieces

Led strip placement: 200 m

Villamvedelemi vthese are: 400 m

Kertepites: 300 m

Structures for the construction of a CATV, CATV, surveillance, property, vultures, voice and visual systems.

Further tasks: - the authoring test is heavily influenced by a pilot - a temporary secretary for the provision of electrical equipment and electrical appliances for emergency use;- the discharge of all epithet and assembly work, - the execution of a new bidding process, - the management of a management, technical or other task, - the receipt of a written agreement, a document, a law, a certificate of approval, - any doc. which is the safest thing to do with the grower, the safest artificialto-use and / or utilization of the materials, structures and equipment of the assembled materials, structures and equipments, and to provide for the approval of the application and the approval plan, the issuance of a permit for the use, AK, - collecting bomber products and epithetics waste and collecting themlszallitasa, respectively. - the craftsmanship and reusing of the goods in accordance with the legal regulations; - the restoration of seruents, the restoration of the arms, the fulfillment of the validity and the validity of the probationary measurements in the coffers, the coarsening epithets, - the release of authentic energy certificates and thethe AK; - the pool will use it as a resource; -Nyertes AT is responsible for all docks. the author of the license and the licensee of the licensee and the debtor of the license, which is a concessionaire for the use of the Letesitmeny product, the concession of the depository and the safe articulation of the Letesitmeny item, 321/2015. (X.30.) Korm. Pursuant to - 46 (3) - (6)(KT):

It is not possible to use a time-consuming (AT), lower-case, and not a sub-standard verb to be a commercial operator (GSZ) against whom the Kb is . Section 62 para. (1) - (2) of any of the CoCs. The Dealer (AK) excludes the AT, sub- verifying that the GSZ, who is responsible-KO has come up with this kind of thing.

Verified mod:

AT, (X.30.) KR - 4 (1) - (2) of the KRC, provisionally certify the submission of the one-piece European Case Documentation Document (ESPD). 62, and that it is also in compliance with the Kb. Section 65 is based on the suitability criteria specified for AK.

AT is tested by-in the case of a subcontractor or a taxpayer who is eligible to submit an ESPD, to submit a statement of the KO's claim in Section 61 of the Kbt. In ESPD, GSZ is trying to declare that, in relation to it, the Kbt. Section 62 of the Civil Code does not apply and is required to provide the CoR with other information related to the commencement of the reopening.Article 2 (5) of the KR provides the CA with the preliminary suityour verbal statement accepts the explicit statement of the GSZ. According to Section 69 para. (11) of the Declaration made in the ESPD, in accordance with the provisions of Section 69 para. (4), the GSZ has to provide these data bases in the appropriate sections of the form - such databases are possible with the verification of KO's validation AK that's his shitand should also be supported by the fact that Section III. es IV. The body is entitled to certify the chapters of the certificate. On the basis of Section 69 para. (4), the GSZ invoked the verdicts for the purposes of the KR 8, 10, 12-14. (1) to (2) and Section 6 of the Kbt. Section (4) of Section 67.

In the above mentioned form, the Kbt. Section 64 (1) - (2), (4) and aKR 4.-5. --eighth -; 10th - 12.-14. - - 16 and the provisions of Article 12 (2) of the EDF apply.

AK prior to the KOk ex-Checker accepts the statement contained in the ESPD. [KR 4-5. -] The submission of Documents and Gazettes may be based on Article 1 (7) and Section 7 of the CR. tev. vegzesere valo alkalmassag:

The guarantor of the epitomous industry is represented by Etv.-• In the case of a non-Mo resident GSZ, be registered in the European Parliament and Council Directive 2014/24 / EU XI. as well as complete any of the other test procedures contained in the aforementioned breastfeeding, as well as any other test order included in the aforementioned breastfeeding, or in the country of residence in the country of residence, with a right or with an organizational or chambers of membership in the country of residence. in the case of Non-Hungarian Taxpayersthe country in which you reside, or you are licensed under a sovereign country, with a right or with an organizational or chambers of membership.

Verification mode: in ESPD, "α" (alpha) section with a suction loop.

Exact Verification: In the case of the GSZ settled in Mo, the role of the inspector in the register AK controls the construction of epitheticsand according to the details of the names of the relevant professional chamber in the country, in the case of the non-Mo settled GSZ in accordance with the provisions of European Parliament and Council Directive 2014/24 / EU XI. (extract) or any other certificate or declaration that has been filed in the patient's records. [321/2015. (X.30.) Section 26 (2) para. 322/2015. (X. 30.) Paragraph 8 (2) of the Criminal Code.] The Issuer is not responsible for the economic and penitentiary situation. According to Section 57 (1), KD will make a purchase with the present buyer. AK can be submitted by KD on the ekr.gov.hu electronic interface.

2) Subject: according to the KD Section Kbt. (1) - (5) and (7).

3) Location: AK It holds. Titles: 7621 Pecs, Kaptalan u. 5. Time: 2018/08/28, 10:00 o'clock. Results. 4) Appointment of the times: It is crossed over to the EDR system until the deadline expires.

5) The date must be read in PDF format using Acrobat Reader. The information provided in electronic form can be read in the password, but must not be modified.t in the excel (.xls) format.

6) If a better AT is available in a timely manner, then the arroll must be attached to the KD.

7) AT in the form of an electronic form in the EDF ) Reading b) according to -6.6 - (2), c) Kbt.62 - (1) k) kb) and kc), d) valt. Bey. arrow; e) ESPD; f) Kbt. -------------------------------------------------------------------------------67----------------------------all the ATs must be available from time to time: - Approx. (6) - 65 (65) -- (1), (3) and (4), 65 (7), 134 (5) (7) a declaration of non-content declaration is also a probationary) -documentation of evidence to the suitably justified organization Disclosure of Section 65 (7) from the Liability Officer in Section 322/2015 (X.30) Corm.rend. Article 26, - Declaration of authenticity, -how. (10) Attach the application to the CA and to any other organizations that may be legally certified by a subsidiary, a subsidiary, a duly authorized representative of a subsidiary of a subsidiary, in the case of a proxy holder. In the case of a filing in writing, zerosan masolata. In the case of electronic mail, the unencrypted copy of the documents attached to it is also included.

11) Formal test of the Kbt. - 12 (2) of the EC Treaty and Article 10 of the EDF Regulation.

12) It is unreasonable if AT does not expose the aforementioned co-ordinator to the time limit.

13) AK accepts the translator in the case of the translators. 14) The appropriate statementand M.1 / - M.2 / points.) - 17) Winner with AT test - the most relevant for the time of the contract rally, to be responsible for ensuring the integrity of the insurance contractor or an existing liability insurance contractorto be extended to a minimum of 500, 000, 000 HUF / year and a minimum of 100, 000, 000, .HUF / per annum. Design insurer: min. 5, 000, 000, - HUF / year and min. 1 000 000, - HUF / arm

18) The GSZ is the Kb. In Section 44 of its application, the accredited placement of the document contained in the U.S. secret is applied to this function in the EDF. Yes. Section 75 (2) (e) applies.22) In the present framework of the AC m(23) The task of the winner AT is to subordinate the contractor to the author's argument. (23) The subject of the winner AT is to subordinate the contractor to the contractor's arguments. Provision: Indicative export and retention plan, indicativeorganizational plan.

26) AK does not test the information provided in this document for a period of time.

27) Law: Kbt; 424/2017 (XII.19.) KR. A IV.2.6. see the section on the Kbt. Article 81 (11) shall be drafted. Informalodas on the Kbt. (28) FAKSZ: Dr. Turi Akos 00416

29) In view of the character constraint, the total content of the felhivas in the K.D.and the creditor attached to the EDF must be interpreted in detail.
Internet address (URL): http://www.gov.pecs.hu

Documents

 Tender Notice