Contract notice: Railway signalling works Tender - 18765067
Tender notice from Bulgaria, published on 01 Dec 2017.
Executive Summary
The ДП „НАЦИОНАЛНА КОМПАНИЯ ЖЕЛЕЗОПЪТНА ИНФРАСТРУКТУРА“ has issued a Tender notice for the procurement of a Contract notice: Railway signalling works in the Bulgaria. This Tender notice was published on 01 Dec 2017 and is scheduled to close on 01 Mar 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 18765067, while the tender notice number is 478748-2017 and Register on the platform.
Object of the contract Railway signalling works Description: Contract notice: Railway signalling works Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45234115, 45234115, 71311230, 45234115, 71311230 CPV Description: Railway signaling works - Railway engineering services - Design and construction of signaling and telecommunication systems on the Plovdiv-Burgas railway line under the project "Rehabilitation of the railway line Plovdiv - Bourgas", Phase 2. The railway section Plovdiv - Stara Zagora - Bourgas is the main railroad from the railway network of the Republic of Bulgaria with a length of 293 km. The results you needTo be achieved by the execution of the contract are: Modernized signaling systems in the railway stations and the interconnection in the section, including routing-computer centralizations, new external signaling devices and cables, dispatching centralization and ETCS; Modernized telecommunications systems in the stations and inter- based on fiber optic cables including transmission networks, stationary and dashboardsdigital devices, PBXs and a GSM-R network; Built-in passenger information systems; Buildings for control of rolling stock; Execute documentation; Achievement of the requirements for interoperability with the trans-European rail system of the QMS subsystem in the section Main Site: The railway line from Plovdiv to Bourgas Stage I: Preparation and transmission of Techniqueproject in its full volume according to the normative regulation; Coordination of a technical project and preparation of documents for the issuance of a building permit and of the documentation for the conformity assessment of the project with the requirements of the NoBo technical specifications for interoperability; Preparation of a detailed design. Stage II: Construction (Construction), including: Supply of equipment for: - systems-for signaling (SS) in the city of Plovdiv-Bourgas for 18 stations including temporary control boards, equipment for routing computer centralization (MCC), including 4 special vehicles equipped with measuring and testing equipment, cables and external elements of MCCs, power supply and switchboard heating appliances, neighboring station blocking equipment, video surveillance system10 train stations, as well as materials for correction of railway tracks in 5 stations - Traffic Management System (SDTMD), including 1 special car, equipped with measuring and testing equipment and CCTV for 18 more stations - a new ETCS train protection system located in Manole-Bourgas, 271 km long, including 2 special vehicles equippedwith measuring and testing equipment, - tracking system parameters of the rolling stock at 4 points, - telecommunication apparatus (TA) in the city of Burgas, Burgas, with a length of 293 km: optical cables and the corresponding transmission equipment and data network, dispatch links and station concentrators, telephone exchanges and subscribers, passenger information devices, GSM-R train communication system and a-management of the telecommunication network (TM), including 4 special vehicles equipped with measuring and test equipment. Installation of the delivered equipment for: - CC in the city of Plovdiv-Burgas, including temporary control panels, MCC equipment, cables and external MCCs, power supply equipment, arc heating apparatus, interlocking facilities for neighboring stations, - video surveillance system, tunnel track correction, dismantling of existing signaling equipment, - SDTV and CCTV systems, - ETCS train protection system, - rolling stock tracking system, - dismantling of the existing ALS-TA system in Plovdiv Bourgas: optical cables and the corresponding transmission equipment and data network, dispatching links and railway stationtractors, telephone exchanges and subscribers, passenger information devices and TM management center; - GSM-R train communication; network and bringing the existing system (hardware and software) into with required. of Regulation 919 / 2016.Applications for repairs of premises and construction: -rehabilitation of technical facilities in the city of Plovdiv-Burgas- signaling premises in 15 stations, for telecommunication in 31 stations, dispatcher premises and duty officers at 19 stations - construction of a technician. "container type" premises for signaling in 4 stations and for telecommunication in 7 stations - construction of a tubular network in 18 stations.Testing and putting into operation of: - CC in the city of Plovdiv-Burgas, including temporary control boards, MCC equipment, MCCs and external MCC features, anchoring apparatus, apparatus for heating of switches, interlocking of neighboring stations, CCTV system - SDTV and CCTV systems - new ETCS train protection system - rolling stock tracking system - TT in Plovdiv Bourgas - optical cables and related transmission equipment data network, dispatch links and stationary hubs, teltelephone exchanges and subscribers, passenger information devices, GSM-R train communication system and TM management center. Preparation of an executive dock; Completion of the Authorized Surveillance. Stage III: Obtaining permission to use the site, according to the ZUT, Preparing the plan and proving the test tests. certificate of opera. Compatibility. The participant must have a registration in the Centerthe professional register of the Bulgarian Construction Chamber, for the construction of second group constructions - constructions from the transport infrastructure, according to Art. 5, para. 1, item 2 and para. 6 - first category construction of Regulations for the procedure for entry and maintenance of the Central Professional Register of Builders, issued by the President of the Chamber of Builders in Bulgaria, and for foreign persons is accepted-registration in analogous registers under the law of the Member State in which they are established.If the participant is a consortium which is not a legal entity, compliance with the selection criterion shall be evidenced by each of the persons included therein who will carry out the relevant activity according to the distribution of the the participation of persons in the performance of the activities provided for in the contract / document hbut the creation of the merger. Where the participant provides for subcontracting, the compliance with the selection criterion is also proved by them, according to the type and the share of the order they will perform. When submitting the offer, compliance with the eligibility criterion is indicated in section A: Part IV: Selection Criteria by EEDOP.For proof of compliance with the Criterion, the following document is presented:verification for registration in the Central Professional Register of the Builder to the Bulgarian Construction Chamber for the execution of Group II constructions: construction of the transport infrastructure, according to Art. 5, para. 1, item 2 of the Regulation for the procedure for entry and maintenance of the Central Professional Register of Constructors (PIRVPPR), first category of construction, according to Art. 5, para. 6, sub-paragraph 2.1 of the IPPCPRP. For a strangerthe individuals who fall within the scope of Art. 25a of the Chamber of Builders Act (CCS) shall be submitted the document under Art. 25a, para. 2, item 1 of the CPS. The document is presented in the case of Art. 67, para. 6 of the Public Procurement Act - Not Required - Continued from Field III.1.3 "List and Short Description of the Selection Criteria": For the "Designed in accordance with the TSI"system (CAC), the design of which is implemented in by Directive 2008/57 / EC of the European Parliament and of the Council of 17.06. 2008 ref. opera. (EU) 2015/14, Commission Regulation (EC) 2016/919 of 27.05.2016 on the implementation of the common organization of the markets in rail and inland waterway in the Community, Decision 2012/88 / EC, as amended by Decisions 212/696 / technician. specific for opera.svm. of the subsystems of the CIS of the railway system in the EU or under Ordinance No. 57 of 09.06.2004. of Min.Transport for Opera. of nation. rail system within the EU. The participant shall have staff and management with a specific professional competence for the performance of the contract.4.The participant shall apply a quality management system.When submitting the tender, the compliance with the selection criteria for technical and professional capabilities shall be indicatedand in Section C Technical and Professional Abilities and Section D Quality Standards and Environmental Management Standards for Part IV: Selection Criteria by EEDOP. Documents shall be submitted by the participant designated as contractor or upon request in the course of the procedure in the cases of Art.67, para.5 and para.6 of the Public Procurement Act. Where the participant is an association which is not a legal person, the compliance with-the selection criteria in respect of Technical and Professional Abilities are proved: under item 1, item 2 and item 3 - by the participating grouping under item 4 - for each member of the group that will perform the respective activity according to the distribution of the participation of the persons in carrying out the activities provided for in the agreement establishing the grouping. When the participant provides for the participation of subcontractors, they must meet the relevant selection criteria according to the type and the share of the contract they will perform and for which there are no grounds for removal. When the participant provides for the participation of third parties, they must meet the relevant selection criteria for the proof to which the participant refers to their capacity and for whom there are no grounds for removal. Documents-for Proof: Under item 1-List of construction with subject and volume identical or similar to the subject and the volume of the public procurement completed for the last five years from the date of submission of the bid, accompanied by a certificate (equivalent document) contain the value, date of completion, location, type and volume, and whether it is executed in accordance withWith reference to item 2 - List of services with subject and volume identical or similar to the subject and the volume of the public procurement, executed for the last three years from the date of submitting the tender, indicating the values, dates and recipients together with proof of the service rendered. Under item 3 - List of the personnel who will execute the order and the members of the management, cothey will be responsible for the implementation, which specifies the professional competence of the persons. Under 4-Certificates issued by independent persons accredited under the European Standard Series by EA BAS or another national accreditation body that is a party to the Multilateral Agreement on Mutual Recognition of the European Organization for Accreditation for the respective area or to be responsible-the recognition requirements under Art. 5a, para. 2 of the National Accreditation of Conformity Assessment Bodies. The Contracting Authority shall accept equivalent certificates issued by bodies established in other Member States as well as other evidence of equivalent quality assurance measures. The Contracting Authority shall remove from the procedure the participant for whom the grounds under Art..54, para 1, items 1-7 of the Public Procurement Act, as well as participants for whom the circumstances under Art. 55, para 1, item 1, item 4 and item 5 of the Public Procurement Act occur before or during the procedure. The assignor removes from the procedure the participant when it is a grouping of natural and / or legal persons and as a member of the united. There is one of the grounds for elimination under Art. 54, para 1, items 1-7 of the Public Procurement Act and there are circumstances under art. 55, para 1, 1, item 4 and item 5 of the Public Procurement Act. The investor requires replacement of a subcontractor proposed by the participant and / or third persons for which one of the grounds for elimination under Article 54, para 1, items 1-7 of PPL and there are circumstances under Art.55, para 1, item 1, item 4 and item 5 of the Public Procurement Act .. When submitting the tender, the participant declares the lack of grounds for removal under Art., pp. 1-7 of the PPL and the lack of circumstancesunder art. 55, para 1, item 1, item 4 and item 5 of the Public Procurement Act, by presenting a single European Public Procurement Document (EEDOP) according to a standard template. When the participant is a joint body of natural persons and / or legal entities, a separate EEDOP shall be submitted for each member of the consortium when submitting the bid. Where the participant has indicated that it will use subcontractors and / or third parties, when submitting the bid for participationis for each of them a separate EEDOP is presented. A participant for whom there are grounds under Art. 54, para 1, p.1-7 of the PPL and circumstances under Article 55, paragraph 1, point 1, .4 and p.5 of the Public Procurement Act shall have the right to provide evidence that it has taken measures to ensure its reliability. When submitting the tender, the participant declares that it is not related to any other participant (s) . 101, para. 11 of the Public Procurement Actin accordance with - 2, item 45 of the PP of the Public Procurement Act (declared in EEDOP). The assignor removes a participant for whom the scope exists. under Article 3, item 8 of the ZIFODRUPPKLKTTDS, except for the cases of the exceptions under Article 4 of the ЗИФОДЮПДРКЛТДДС (declared in EEDOP). The Contracting Authority does not have a requirement for the establishment of a law. person where the participant selected as contractor is a union of a natural person and / or a legal person. When the participant is a union that does notshall be a copy of a document showing the legal basis for the formation of the consortium with a term not shorter than the term for execution of this contract. The document shall also contain: 1. the rights and obligations of the members of the grouping; the division of responsibility between the members of the grouping; the activities that each member will performThis document should unconditionally certify the determination of the partner representing the consortium for the purposes of the public procurement and the fact that the persons in the grouping are jointly and severally liable jointly and severally for their participation and performance order. The authorities in the Republic of Bulgaria, from which the participants can get information about: tax and social security obligations - National Revenue Agency, e-mail: www.nap.bg, environmental protection - Ministry of Environment and Waters, e-mail: www.moew.government.bg; Employment - Employment Agency, e-mail address: https://www.az.government.bg; working conditions in the country - Executive Agency General Labor Inspectorate, elecwww.gli.government.bg The Contracting Authority organizes an organized inspection under the conditions set out in the documentation for participation. Pursuant to Art. 114 of the Public Procurement Act, the time limits for performance of the contracts awarded by the contract start to run after securing the financing, for which the contracting authority notifies the contractor. After the expiration of the term of 3 months after the conclusion of the contract the parties have the rights under Art.-of the PPL Internet address (URL): www.rail-infra.bg Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Railway signalling works was 01 Mar 2018. Bidding is closed.
This tender has been issued by ДП „НАЦИОНАЛНА КОМПАНИЯ ЖЕЛЕЗОПЪТНА ИНФРАСТРУКТУРА“ in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45234115 - Railway signalling works, 71311230 - Railway engineering services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 18765067. The purchaser document reference is 478748-2017.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.