Contract notice: Railway depot construction work Tender - 34431648
Tender notice from Hungary, published on 05 Jul 2019.
Executive Summary
The IPOLY ERD? ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Railway depot construction work in the Hungary. This Tender notice was published on 05 Jul 2019 and is scheduled to close on 05 Aug 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 34431648, while the tender notice number is 311781-2019 and Register on the platform.
Object of the contract Railway depot construction work Description: Contract notice: Railway depot construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45234112, 45262690, 45262700, 45300000, 45315100, 45350000, 45234112, 45262690, 45262700, 45300000, 45315100, 45350000 CPV Description: Mechanical installation. Ipoly Erdő-Szokolya- Paphegy locomotive line Reference number: EKR000798132019 to Szokolya - Paphegy Mozdonyszin to work as a superintendent Main Site: Szokolya 018/1 hrsz.n in the 1970s he was baptized. Dimension of 25, 40 x 19, 90 m with patched patio area of 505, 46 m, 6, 48 m with parkasmagasma, useful floor space: 461, 18 m. The epuel is 12, 00 x 18, 00 m., 80 x 19.00 m with floor plan (471.2 m interior space), and 3.0 m with 18.00 m of flooring with ratchet head. The roof structure for the 3.0 m-kinetic skyscraper tamaszodo DV-1-HT trapezoid plate. The flare-like guiding structures on the pillars are very eloquent. Reinforcement of the steel structure with sponge-welded, welded acoustic valves. Further steelwork work is the cantilever extension of the attic, the furnace of the furnace, the design of the new gates, the buoyancy of the shackle, the battery-powered vent, and the guiding guides.neither. The flat roof insulation with bitumen cover covering the epileum is to be prepared in the waterproofing of 467 m. Facade walls are 10 cm thick. fem boritasu thermal insulation panels, as well as tegla walls with facade thermal insulation and cowl walls. The windows and umbrella walls are insulated, the gates are insulated, but they are sideways, engineered artificial.i warm up and build up a keruel in the washroom. The ivovis conduits and wastewater are pushed back to the hall before the hall. The epuel will be heated by a fata-headed hammock with a spiral-lined galvanized duct cross. THEfuestelvezetest is an insulated, insulated, stainless steel fence holder. I think the technical description of the case is good and the reasons for the excuse are confirmed, as well as in the case.zerzesi technical camp has defined modiol 321/2015. (X. 30.) Government Decree 46 (3). Reflecting on the rumors The attention of the respondents to the fact that the types included in the design documentation are exclusive to the rooms to be fitted, the specification of the technical level, the signaling. The named products are of the same quality and tasteIt can be replaced with standard technical parameters, but can be replaced by mas type manufacturers, you can take advantage of it, you can accept the equivalence of the products with them. Description of the terms and roevid description: It is not possible to have a timekeeper, subordinate, and not be able to retrieve the appropriate real master. Yes. Article 62 (1) to (2) (i) of the grounds for exclusion A 321/2015. (X.30.) Kr. (Hereinafter referred to as "Kr.") Section 1 (1) is based on the Kbt. II. In the present case according to the prior art, at the time of publication of the newsletter, the unified european coexistence document issued by the co-operative documents must be proved in advance by the introduction that there are no grounds for exclusion. Article 69 (4) - (6)err on the biralat line. The Kbt. Article 69 (4) - (6), the introduction of the authenticity of the truths is inspired by the "Kr." According to -- 8-14 and -16, the power of the embarrassment of the excitement is not covered. -15 is based on the sub-sub-person or organization that retains the appropriate certificate, only the unified european coezeboard documento I want to put in the foreground out of the wrong reasons. I am subordinate to those who do not take the correct Kbt in their proofs. A declaration pursuant to Section 67 (4) shall be made. (X.30.), Article 1 (7) of the Government Decree and Article Kb. Section 69 para. (11a). Article 64, and Kbt. Article 74 (1)desere. Reflection of attention draws attention to 321/2015. (X. 30.) Government Decree 1-16. --aira. Provider's Choice Chief Pre-requisites: A "Kr." Section 1 (1) is based on the timekeeper's schedule of Kbt. II. In the present case initiated by the press, at the time of the introduction of the timetable, the unified european coexistence document has to be shown in advance that it meets the Kbt. Section 65 Fundjan is the lower suited to suit the needs. The Kbt. Article 65 (1) (c) and Article 322/2015. (X. 30.) K.r. Section 21 (1) Based on the prediction force for the economic operators engaged in the construction industry, the Etv. In the case of non-Hungarian economic operators established on the Hungarian market, theregistered in the country of residence or registered in the country of domicile with a license, legal successor or organizational, chamber tagagent. The registered roles - if Kbt. In the registers pursuant to -- 69 (11), the free verification of the relevant data and information is not mod - the registered extracts, the register keepsIn the case of a non-Hungarian affiliated person in the case of a member of the registered office or documented in the registered office, the documentary evidence of the verbal document or the documentary evidence of the presence of a registered person in the registered office shall be 2014/24 / EU. a certificate (extract) or other certificate or statement from the registrants listed in the The minimum qualifying requirement (s): SZ.1. It is inappropriate for the timekeeper if the operators of the building industry, based on the schedule of construction work, are in the position of Etv. do not appear in the notices of the construction industry, according to the notices, or. non-Mo-based financial actors are not registered in the country of establishment or arethey do not have a license or legal or organizational tagag in their country of establishment. 1. AT, suitably authentic organization and, if applicable, subordinate to it: - an alairok alairasi cimpeldany, or the alairi sample in accordance with -9 (1) of the vice-versa, dated May 2006, in the case of a Kuelfoeld assistant, entumot (if such a document is in the country of origin, a certified certificate or a certified cegalairas declaration (cimpeldany with the notarial alairas creditor), or an alaire sample countersigned by the district or chamber legal adviser), ) in the case of the person eligible for the note, the newsletterasara - (the proxy and the proxy are also included) irasos meghat Agentast 2. The Kbt. Section 71 (6) does not apply. The appropriate terms and conditions and the proofs required by Section III.1.3) M.1-2. The herringscore given in line: 0-10 points; In case of 1st relativism, KH 21.12 2016 utmutate () 1. m. The gold-plated method of line A (bb); at the best price: 36 months, 0 points for 0 days AT. K roegziti that in the case of the Kbt. Article 77 (1). basically the most favorable forces (36 months) to replace Keruel, as much asIn the case of the second relational aspect, KH 21.12 2016 utmutat () 1. m. The gold-plated method of line A (bb); at the most favorable time: 60 days, in the case of 36-month-olds, 0 points AT. K roegziti that in the case of the Kbt. Article 77 (1). basically the most favorable forces (60 days)) keruel insertion, if the content of the most favorable news item is more favorable with these forces. The 3rd bullet point: the KH 21.12 2016 utmutat () 1. m. Revised gold bullion under point ba ba.5. In the event of a pending cegbirosagi change of entry, the cegbirosag, which has been inserted into the cegbirosag, and the cegbirosag submerged itgazolast attaches (in case of negligence statement about it) 6. Foreword is the timeliness of the event (TED) on the 5th (oetoedik) working day 10:00 am from the beginning of the local non-consultative site, the inquiries to find out more about the place (contact person in the field: Ruff Janos tel .: 20 4, 687, 058th) 7th Attached to the schedulethe Hungarian translation of the non-Hungarian document should be 8. In the case of Koezoes, you need to attach the koezoes journalist's newsletter to your interviewers. The schedule should include: - Kbt. Article 66 (6) (a) and (b) is also a negative statement - the Kbt. Article 66 (2) express, original declaration (EDF form) - Kbt. Article 66 (5)) based on the read-only (ECR form) - update data management statement according to the backside statement pattern. We assure you Kbt. Article 134 (4), paragraph 4, provides for the provision of a certificate to the subscriber Kbt. Section 134 (5) of the Act shall be the basis for the declaration. The winner of the event is the tactical date of the authorlies (allrisk) [epitesian] responsible (50, 000, 000 millio HUF / ev and HUF 10, 000, 000 mil / lever oestzeg) to extend or expand the existing. ATK must attach a statement to this report regarding their status. Attach a professional report and artefact co-foundations to the AT's schedule. Continued at point VI.4.3) Internet address (URL): http://www.ipolyerdo.hu
The bid deadline for Contract notice: Railway depot construction work was 05 Aug 2019. Bidding is closed.
This tender has been issued by IPOLY ERD? ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45234112 - Railway depot construction work, 45262690 - Refurbishment of run-down buildings, 45262700 - Building alteration work, 45300000 - Building installation work, 45315100 - Electrical engineering installation works, 45350000 - Mechanical installations.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 34431648. The purchaser document reference is 311781-2019.