Contract notice: Railway construction works Tender - 16047660
Tender notice from Bulgaria, published on 29 Aug 2017.
Executive Summary
The ДП „НАЦИОНАЛНА КОМПАНИЯ ЖЕЛЕЗОПЪТНА ИНФРРАСТРУКТУРА“ has issued a Tender notice for the procurement of a Contract notice: Railway construction works in the Bulgaria. This Tender notice was published on 29 Aug 2017 and is scheduled to close on 29 Sep 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 16047660, while the tender notice number is 337432-2017 and Register on the platform.
Object of the contract Railway construction works Description: Contract notice: Railway construction works Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45234100, 45234100, 45234115, 45234116, 45234130, 45234160, 45234100, 45234115, 45234116, 45234130, 45234160 CPV Description: Railway construction works. Railway signalling works. Track construction works. Ballast construction works. Catenary's construction works. Мех. подн. на жп път с мат. тип 49 втора употреба(на Въз-я) в м/угарието Драгичево-Перник разпре. от км. 24 165 (КС № 3 в г. Драгичево) до км. 26 703, 50(край перон сп. Метал) с дълж. 2538, 5 м. по 5 жп линия. Поръчката включително изпълнението на дейностите, щеis carried out in 2 stages: Main Site: Dragichevo - Pernik intergranular distribution line from km. 24 165 (railway station № 3 at Dragichevo station) to km. 26 703, 50 (near the platform of the Metall stop) with a length of 2 538, 5 m on the 5th railway line The order includes the following activities: Stage I - elaboration of the detailed design Stage II - execution of the construction works The following activities are required: 1. Installation of new iron pType 49 kg / m with materials of the type ST-4 reinforced concrete sleepers, with the use of the PAK-68I grid on the grid 1720 / km, at the Poduyane station. The indicative quantities of rail replacement materials per unit (25 m) are: - Rubber pad - on each sleeper set 8 642 pcs; - - Spring ring A24 - on all sleepersItem 17 284; Dismantling of an existing rail track of 49 kg / m on a wooden sleeping grid with a density of 1760 / km and a fence of the brand K and transport to Dragichevo railway station 3. Complete excavation of the ballast prism (only in the area of the platform of the magazine Metal from km 26 500 to km.26 703, 5) with transport up to 5 km, profiling and sealing of the ground base to reaching the design parameters 4.on a ground basis in the area of the platform and laying a sand pillow 5. Laying of a new railway track with processed units for bare track 1760 6. Mechanized grinding of ballast prism with an elevator train, including a locomotive / with an elevator train of the Employer 2312 m 7. Cutting and eradicating shrubs and trees up to 10 cm thick will take place to the left of km 24, 200 to km 25 290, km 25 370 to km 26 115 and km 26 180 to km 26 530 - total 2185 m and to the right of km 24 165 to km 24 420, km 24 940 to km 25 290, km 25 370 to km 25 440, from km 25 640 to km 26 115, from km 26 180 to km 26 500 - total 1470 m In a strip with a width of 2, 5 m from the end of the ditch or heel of the embankment or a total of 10 000 m2. Cleaning ditches mechanically, specifically for cleaning the right one kilometerthe drainage ditch of km. 24 420 to km. 25 020 = 200 m and the left drainage ditch from km 24 220 to km 24 420 = 200 m, from km 24 560 to km 24 850 = 290 m and from km 25 740 to km 25 860 = 120 m and load of transport. . Unload ballast with hopper compositions according to the appropriate level and to reach the required parameters of the ballast prism. Levels of the track from km.-24 165 (railway station № 3 at Dragichevo station) to km. 26, 703.50 (end of a metal stop) with a length of 2, 538.5 m 11. Making a busy road from km. 24 165 (railway station № 3 at Dragichevo station) to km. 26, 703.50 (end of a metal stop) with a length of 2, 538.5 m 12. Spreading of railway sections from a landing at landing sites in Poduyane and Sofia Railway Station - 130 - Part of the Contact Network The envisaged types of works are: - Dismantlingslanted pillars with No 1; 2; 11; 14; 45 and 44. - 6 pcs - Demolition of dismantled railway posts. - 6 pcs - Piloting of a pole line - 2, 5 km - Making a foundation of type Ф "С" for BMK 3, 7 / 11 - 6 pcs - Straightening of a pole BMK 3, 7 / 11 with a value of a ladder - 6 pcs - Protective fence for excavation- 6 pcs - Signs "High Voltage Dangerous for Life Do not Get In" Numbering and Dating Pillars - 79 pcs UchThe member must be registered in the Central Professional Register of the Builder with the Chamber of Builders in Bulgaria for the execution of constructions of Group II - constructions from the transport infrastructure, according to Art. 5, para 1, item 2 of the Regulations for the procedure for registration and keeping of the Central Professional Register of Constructors (PIRVPPRS), first category of constructions, according to Art. 5, para. 6, sub-paragraph 2.1 of the PIRIC, and heardforeign nationals - in a similar register under the law of the Member State where they are established - If the participant is a grouping which is not a legal entity, compliance with the selection criterion shall be demonstrated by each of the persons included in it who will carry out the relevant activity according to the distribution of the participation of the persons in the implementation of the activities foreseen in the document / contractWhen the participant provides for the participation of subcontractors, the compliance with the selection criterion is also proved by them, according to the type and the share of the order they will perform and for them there are no grounds for removal from the procedure. submission of the tender compliance with the fitness criterion is specified in section A: Eligibility of Part IV: EETO Selection CriteriaP. The following document is submitted to prove the compliance with the criterion: Certificate of entry in the Central Professional Register of the Builder to the Bulgarian Construction Chamber for execution of Group II constructions: construction of the transport infrastructure, according to Art. 5, para. 1, item 2 of the Rules for the procedure for entry and maintenance of the Central Professional Register of Builders (PIRVPSPC), First category construction, according to art. 5, para. 6, sub-paragraph 2.1 of the IPPCPRP. For foreign persons, which fall within the scope of Art. 25a of the Chamber of Builders Act (CCS) shall be submitted the document under Art. 25a, para. The document shall be submitted by the participant designated as contractor in the case of Art. 67, para. 6 of the PPL - Continued from field III.1.3.) Expected minimum level (s): 2.9. Answer: For work. on part CT not less than 1 expert Image. and Prof.Qualif .: ACS at least "Bachelor", Prof. "Electrician" Prof. "Telecoms. Technique "or" Communicate and Provide Techniques and Systems "or equivalent. Have a certificate. For the acquired IIIqualif. Worker group. in electrical systems / voltage networks Up to 1 000 V, Art. 15, para. 1 of the "Safety and Health Regulations" in electric appliances and district heatingpower plants and equivalent networks or equivalent. experience: min. 3 years experience as building handler. of signaling or telecommunication systems for railway infrastructure. or metro 2.10. Answer: to control compliance with the law. and safe. of labor - not less than 1 expert Image. and Professional Qualifications: ACS at least "Bachelor", Professional Qualification "Electrical Engineer", "Eng.", as well as persons with an average image with a 4 year course attraining and acquired professional qualification. In the fields of "Electricity" and "Technique". Completed training on control over compliance with the law. and safe. of work, in accordance with the Law on Labor and Social Security. Experience: Min. 3 years of experience in this position / position 2.11. Dr. experts not less than: 2.11.1. Total handler 1; 2.11.2.Tech. handler for work. by the track 2; 2.11.3. Signals 2; 2.11.4. Locksmith / Arrows, ATwelds 2; 2.11.5. Tech. handler for work. through the mains 1 pcs; 2.11.6. Electro. 1 PC.; 2.11.7. Tech. handler for work. Signaling and telecommunication services 1 - For items 2.11.1, 2.11.2., 2.11.3. 2.11.4., 2.11.5., 2.11.7., Shall hold valid certificates for a successfully passed examination under Article 5, paragraph 1 of Ordinance No 56 / 14.02.2003 on the requirements, conditions and order of training of the candidatesfor the acquisition or recognition of the capacity for rail transport posts and the procedure for conducting the examinations of persons responsible for transport safety. The participant must have achieved a minimum total turnover, calculated on a yearly basis. The participant should have professional liability insurance for design and construction under Articles 171 and 171aOf the Territorial Units Act - if the participant is an association which is not a legal entity, the compliance with the selection criterion under item 1 shall be evidenced by the participating association and by item 2. Of each of the persons included therein who will perform the respective activity according to the distribution of the participation of the persons in the implementation of the activities provided in the document / agreement for the creation of the grouping. Where the participant provides for the participation ofsubcontractors, the compliance with the selection criterion is also proved by them, according to the type and the share of the order they will perform, and for them there are no grounds for removal from the procedure. When submitting the tender, the participant declares the information regarding the compliance with the criteria for Selection of Economic and Financial Condition in Section B of Part IV: Selection Criteria of EEDOP, item 1a)-and p.5) Under the terms of Art. 67, para. 5 and para. 6 of the Public Procurement Act, the criteria shall be evidenced by the following documents: - According to item 1. - with 1 or more of the following documents: bank statements, annual financial reports or their components, when required, publication - declaration of total turnover Under item 2 - evidence of the existence of professional liability insurance for design and constructionContinued from field III.1.3.) Required minimum level (s): The total technical equipment under item 2.11.1. And Technician for the works on the track under item 2.11.2. Have a valid Certificate of acquired Qualification Group III for work in electrical systems / networks with voltage up to 1 000 V, according to Art. 15, para. 2 of the "Safety and Health Regulations" At work. In electric power plants and district heatingrally and electric networks "or equivalent, for the" technical supervisor ". the manager for the works under Art. 2.11.7. shall have a Certificate for acquired Qualification Group III for work in electrical systems / networks with voltage up to 1 000 V, according to Art. 15, para. 1 of the "Safety and Health Regulations" when working in electrical systems of electric and district heating and electricity networks "or equivalent.Electrical engineer under item 2.11.12 should have: Education and professional qualification: ACS at least "bachelor", professional qualification "Electrical engineer". Professional experience: Experts proposed for this position should have at least 3 years experience in building a new contact network or rehabilitating an existing contact network. Certificates for acquired V qualification group for work in eleCreep systems / networks with a voltage above 1 000 V, according to Art. 15, para. 2 of the "Safety and Health Regulations" When working in electricity and district heating plants and electricity networks "or equivalent.- For items 2.11.1 to 2.11.13, they shall have a minimum of 1 year of experience on railway-related sites Infrared or subway.- For foreign persons, equivalent image-qualification degrees and specialties are accepted andProfessional Qualification. according to. the legislation of the state. the Member State in which they are established. In the open procedure, a participant meeting the conditions of Art. 10, para. 1 of the Public Procurement Act. The contracting authority does not have the right to create a legal entity where the participant selected as a contractor is a grouping of natural and / or legal persons. Where the participant is a grouping which is not a legal person, shall receive a copy of a document showing the legal basis for the formation of the consortium, with a term not shorter than the time limit for the execution of this contract. The document must contain: 1. the rights and obligations of the participants in the grouping; 2. the distribution of liability between the members of the grouping; The activities that each member of the group will perform-Shall remove from the procedure a participant for whom the grounds under Art. 54, para. 1, item 1-7 of the Public Procurement Act, Art. 55, para. 1, item 1, item 4 and item 5 of the Public Procurement Act and Art. 107 of the Public Procurement Act, as well as the circumstances under Art. 3, item 8 and Art. 4 of the Economic and Financial Relations Act with companies registered in jurisdictions with preferential tax regime, the persons controlled by them and their actual owners.a member of the grouping that is not a legal entity and the subcontractors must meet the relevant selection criteria and for them there are no grounds for removal from the procedure. 67, para. 1 of the PPA when submitting the tender, the participant declares a lack of grounds for removal from the procedure and compliance with the selection criteria by presenting the EEDOP.an entity which is not a legal person, a separate EEDOP shall be submitted for each member of the consortium when submitting the bid. When the participant has indicated that he will use subcontractors and third parties when submitting the bid, each of them will be presented with a separate EEDOP. The documents proving the information specified in EEDOP may be required additionally under the conditionsOf Art. 67, para. 5 of the Public Procurement Act. According to Art. 67, para. 6 of the Public Procurement Act before the conclusion of a public procurement contract, the tenderer appointed as a contractor shall present up-to-date documents certifying the lack of grounds for removal from the procedure. Documents are submitted by any member of the grouping that is not a legal entity as well as by subcontractors and third parties, if any. The authorities in Republic ofto Bulgaria, from which the participants can obtain information about: - the obligations related to taxes and insurances; - National Revenue Agency, electronic address: www.nap.bg - environmental protection - Ministry of environment and water, electronic address: www.moew.government.bg - employment protection - Employment Agency, email: https: //www.az.government.bg- working conditionse in the country - Executive Agency General Labor Inspectorate, e-mail: www.gli.government.bg At the conclusion of the contract, the participant, for a contractor, provides a guarantee for the performance of the contract at the rate of 5% of the contract value excluding VAT. The guarantee for securing the performance of the contract, respectively. The guarantee for advance payment. payment are presented in one of the followingA) unconditional, irrevocable bank guarantee, in the original, or b) amount paid to a current account of NRIC, IBAN: BG62 STSA 9300 0024 4217 31, BIC: STSABGSF at DSK Bank EAD, certified with payment Or C) insurance that provides for the performance of the contract or the advance funds provided by the contractor's cover in the original.Security. Completed. The contract is provided in the form of a bank. Warranty or insurance, their term of validity should be the term of the contract plus 1 month. Terms and conditions for detention and release. Of the performance guarantee are laid down in the contract for the Order. The guarantee, which provides advance payment. The funds granted shall be valid until their recoveryAnd is released. Up to 3 days after return or absorption Internet address (URL): www.rail-infra.bg Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Railway construction works was 29 Sep 2017. Bidding is closed.
This tender has been issued by ДП „НАЦИОНАЛНА КОМПАНИЯ ЖЕЛЕЗОПЪТНА ИНФРРАСТРУКТУРА“ in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45234100 - Railway construction works, 45234115 - Railway signalling works, 45234116 - Track construction works, 45234130 - Ballast construction works, 45234160 - Catenary's construction works.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 16047660. The purchaser document reference is 337432-2017.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.