Contract notice: Railway construction works Tender - 14662870
Tender notice from Bulgaria, published on 07 Jul 2017.
Executive Summary
The ДП „НАЦИОНАЛНА КОМПАНИЯ ЖЕЛЕЗОПЪТНА ИНФРАСТРУКТУРА“ has issued a Tender notice for the procurement of a Contract notice: Railway construction works in the Bulgaria. This Tender notice was published on 07 Jul 2017 and is scheduled to close on 05 Oct 2017, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 14662870, while the tender notice number is 260109-2017 and Register on the platform.
Object of the contract Railway construction works Description: Contract notice: Railway construction works Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45234100, 45234100, 45221242, 71312000, 71320000, 45234100, 45221242, 71312000, 71320000 CPV Description: Railway Modernization of the railway section Elin Pelin - Kostenets, by lot Lot 1: Modernization of the railway section from km 22 554 to km Railway engineering works - Railway tunnel construction work - Structural engineering consultancy services - Engineering design services. 42 200. NUTS Code: BG412 Main Site: The railway line Sofia-Plovdiv, in the railway section Elin PelliKostenets, the railway section from km 22 554 to km 42 200. The beginning of the railway section (according to the technical design) is a new km 22 554 on Route I and a new km 22 552 on Route II. The end of the section is a new km 42, 200 on Route I and a new km 42, 203 on Route II respectively. The project includes a new Elin Pelin station, a Pobit Kamak stop, a separate Vakarel post and the connection between the Vakarel Division and Vak StationIsrel. The implementation of the contract for the modernization of the dual rail section from km 22 554 to km 42 200 includes the following activities: 1. Designing: - Preparation of Work Drawings and Details for All Parts of the Technical Project; - Preparation of a Technical and Operational Draft for Signaling and Telecommunications. Construction involving the following main activities: - Railway: - Providing design- a track speed of 160 km / h for passenger trains and 120 km / h for freight trains, - a load gauge GC, in the intergovernment and in the stations for the main and front-end tracks, - rail type 60E1, Earth lane, in accordance with the design speed requirements, according to the technical requirements of Regulation No 55 for the design and construction of railway lines, railway stations, railwaysOverpasses and other elements of the railway infrastructure - New structures of the contact network, including the Vakarel section, external power systems and equipment and outdoor lighting of the station areas - Activities and interactions in the field of installation, testing and commissioning Of the MCC at Elin Pelin and Vakarel stations and self-locking in adjacent intergovernmentalIntercity Kazichene Station - Elin Pelin Station and Vakarel Railway Station Ihtiman - - Construction of: 2 doublet (2x2 for single railway line) tunnels with an approximate total length of 15 342, 50 m and evacuation platforms. According to the technical design, tunnel construction is planned to be done by tunneling method - 1 road overpass and 1 road subway; Bridges and canopies; - 11 pcs.- drainage systems with an approximate length of 700 m, - drainage facilities (drainage channels, protective channels, drainage systems), - displacement / reconstruction of 26 pcs. Railway crossings with other infrastructure; - pipeline network for signaling and telecommunication systems in stations and interchanges; laying of a new optical cable and displacement of an existing- Optical cable installation - - Construction of video surveillance systems and passenger information systems - - Fence from the two sides of the railway section to prevent the passage through the railroad, in the stations and in the inter-line. Carrying out author's supervision during the construction of the signaling and telecommunication project in the scope and within the meaning of Art. 162, para. 2 of the Act on their Structure(ART). 4. Putting into operation - preparation and submission of the project documentation and receipt of the Permit for Use under the TDA - the Contracting Authority organizes an organized inspection, under the conditions set out in the documentation for participation For lots 1, 2 and 3: The participant Must be entered in the Central Professional Builders Register of the Building ChamberIn Bulgaria, for implementation of Group II constructions: constructions from the transport infrastructure, according to art. 5, para. 1, item 2 of the Rules for the procedure for entering and keeping the Central Professional Register of Constructors (PIRVPPR), first category of construction, according to Art. 5, para. 6, sub-paragraph 2.1 of the PIFC and the non-residents - in a similar register under the legislation of the Member State in which they areIf the participant is a grouping that is not a legal entity, compliance with the selection criterion shall be evidenced by each of the persons included in it who will perform the respective activity according to the distribution of the participation of the persons in the implementation of the activities provided in the document / The contract for the formation of the grouping. Where the participant provides for subcontracting, complianceThe selection criterion is also proved by them, according to the type and the share of the order they will perform and for them there are no grounds for removal from the procedure. When submitting the tender, compliance with the eligibility criterion is indicated in section A: Eligibility of Part IV: Selection Criteria by EEDOP. To demonstrate compliance with the criterion, the following document is presented: Certificate of entry inThe Central Professional Register of the Builder to the Chamber of Builders in Bulgaria for the execution of Group II constructions: construction of the transport infrastructure, according to Art. 5, para. 1, item 2 of the Rules for the procedure for entering and keeping the Central Professional Register of Constructors (PIRVPPR), first category of construction, according to Art. 5, para. 6, sub-paragraph 2.1 of the IPPCPRP. For foreign persons whoFall within the scope of Art. 25a of the Law on the Chamber of Builders (CCB) shall be submitted the document under Art. 25a, para. The document shall be submitted by the participant designated as contractor in the case of Art. 67, para. 6 of the Public Procurement Act For Sections 1, 2 and 3: The Participant must have Professional Responsibility Insurance for Design and Construction under Articles 171 and 171a of the Construction Act• If the participant is a grouping that is not a legal person, compliance with the selection criterion shall be proved by each of the persons included in it, who will carry out the respective activity according to the distribution of the participation of the persons in the implementation of the activities, Provided in the document / agreement establishing the grouping. Where a participant provides for subcontracting, Compliance with the selection criterion is also proven by them, according to the type and the share of the order they will perform, and for them there are no grounds for removal from the procedure. Where a participant provides for the participation of third parties, they must meet the relevant criteria of the selection criterion for the proof of which the participant refers to their capacity and for which there is no axisIn the submission of the tender, the compliance with the criterion of Economic and Financial Condition is set out in Section B: Economic and Financial Condition of Part IV: Selection Criteria by EEDOP. Proof of the economic and financial status of the participants is presented The following documents, in relation to the requirements: - Proof of availability of securityProfession Responsibility, Design and Construction, or equivalent - Documents are submitted under the terms of Article 67, Paragraphs 5 and 6 of the Public Procurement Act For OP1, OP2 and OP3: Participants may participate in the procedure, Which meets the requirements of Article 10 (1) of the PPA and the requirements of the contracting authority The contracting authority does not have a requirement for the establishment of a legal entity under Article 10, paragraph 2 of the PPA.K, for whom the grounds under Art. 54, para. 1, items 1-7 of the Public Procurement Act, Art. 55, para. 1, items 1, 4 and 5 of the Public Procurement Act and Art. 107 of the Public Procurement Act, as well as art. Under Art. 3, item 8 and Art. 4 of ZIFODRIDPDRKLTDS (declared in EEDOP). Any member of the consortium which is not a legal entity, subcontractors and third parties must comply with the relevant selection criteria and there are no grounds for removal. Participate, for whomThere are grounds under Art. 54, para. 1, items 1-7 of the Public Procurement Act and Art. 55, para. 1, items 1, 4 and 5 of the Public Procurement Act, has the right to present evidence under Art. 56 of the Public Procurement Act. Cong. Art. 67, para. 1 of the Public Procurement Act upon submission of the tender. Declares the lack of grounds for removal and compliance with the selection criteria by presenting the EEDOP. When fate. Is a union that is not a JU, for each member of the unification is presentAnd separate EEDOP. A separate EEDOP is also presented for subcontractors and third parties. Documents proving the information specified in EEDOP are presented under the conditions of Art. 67, para. 5 and para. 6 of the PPA. Doc. Shall be submitted by each member of the consortium which is not a legal entity, subcontractors and third parties. Participants can get information about tax and insurance obligationsWww.nap.bg/ with environmental protection MOEW, www.moew.government.bg/ with employment protection EA, https://www.az.government.bg/ with working conditions in the country EA "GIT", www.gli.government.bg/ On signing of the contract, a party, designated as a contractor, submits a guarantee for securing the execution of the contract in the amount of 5% of the contract price without VAT.Up payment of up to 10% of the contract price, exclusive of VAT, against a down payment guarantee covering 100% of the amount of the advance payment and with a term of validity until its final reimbursement. The guarantees guaranteeing the performance of the contract and the advance funds are presented in 1 of the forms under Art. 111, para. 5 of the Public Procurement Act. Other guarantees related to performance of the contract: 1.Guarantee for securing the obligations within the Term for the notification of defects amounting to 5% of the contract price excluding VAT, validity 12 months. Where unforeseen costs are incurred, the amount shall be 5% of the amount of the contract price and the unforeseen costs incurred without VAT. The warranty is provided in the form of a valid unconditional and irrevocable bank guarantee in the original. In tDue to the Delayed Reporting Term, the period of validity is extended. 2. Valid insurance covering the works performed for the agreed warranty period and, if applicable, the equipment supplied. The amount of the insurance cover is 3.5% of the contract price excluding VAT. When unforeseen costs are incurred, the value is 3.5% of the contract price and the non-anticipatedCosts without VAT. The terms and conditions for the submission, retention, utilization and release of the guarantees are regulated in the contract for awarding the public procurement. 114 of the Public Procurement Act, the deadlines for performance of the contracts awarded by the contract start to run after the financing by the contracting authority, for which the contracting authority informs the contractor in writing. INIn the event that the funding is secured before the date of signing the contract, the deadlines begin to run from the date of signature. If at the date of signing of a protocol for opening a construction site and for determining a construction line and a level according to Ordinance No 3 no funding is provided by the assignor, the deadlines shall start to run from the date of receipt of the written statementFrom the contractor. Upon expiration of 3 months from the date of signing the contract, the parties have the rights under Art. 114 of the Public Procurement Act. The parties can negotiate before proceeding to terminate the contract Internet address (URL): www.rail-infra.bg Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Railway construction works was 05 Oct 2017. Bidding is closed.
This tender has been issued by ДП „НАЦИОНАЛНА КОМПАНИЯ ЖЕЛЕЗОПЪТНА ИНФРАСТРУКТУРА“ in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45234100 - Railway construction works, 45221242 - Railway tunnel construction work, 71312000 - Structural engineering consultancy services, 71320000 - Engineering design services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 14662870. The purchaser document reference is 260109-2017.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.