Contract notice: Railway construction works Tender - 26862210
Tender notice from Hungary, published on 18 Sep 2018.
Executive Summary
The NIF NEMZETI INFRASTRUKTÚRA FEJLESZT? ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Railway construction works in the Hungary. This Tender notice was published on 18 Sep 2018 and is scheduled to close on 05 Nov 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 26862210, while the tender notice number is 404531-2018 and Register on the platform.
Object of the contract Railway construction works Description: Contract notice: Railway construction works Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45234100, 45231400, 45234112, 45234115, 45234116, 45234160, 45234180, 45317000, 71240000, 71334000, 45234100, 45231400, 45234112, 45234115, 45234116, 45234160, 45234180, 45317000, 71240000, 71334000 CPV Description: Railway construction works. Construction work for electricity power lines. Railway depot construction work. Railway signalling works. Track construction works. Catenary's construction works. Construction work for railways workshop. Other electrical installation work. Architectural, engineering and planning services. Mechanical and electrical engineering services. Szeged-HMVH tram-train - kiegeszitHe is an epitome of work Reference Number: EKR000512952018 In the controversial authoritarian framework of the Szeged Hodmezőv-s-rhely's tram-train, completing the design and construction tasks of the supplementary works Main Site: Szeged-Rendező palyaudvar Tasks of the winner: Szeged jarművek v-ge 2 876 m2 subterranean jungle carpentry hall epitese. The field(1) A large belmagassagu, full length crane, two repair halls, one full-length longitudinal reinforced concrete shaft with a length of 80 vm long (lifting axle), and a total length of twenty- (80 mm), with a longitudinal joint (X.track). 1 piece of roof pole. 2) Large belmagassagu lathe hall, with the construction of the hall, half of the maintenance hall on the side of the side with a level of service. 3) The maintenance hall is connected to the main wall of the building, foeld level design and service (carpentry workshops, tarolok) hacking of hollow blades to the yard or yard b(waterfall: 832 m, trough: 635 m, sewage pipeline: 223 m, gas pipeline: 332 m). The installation was carried out by the design (45 luminaires and 23 fountains), ponds (installation of water supply systems: 1, signaling and alarm equipment installation: 1, installation of water supply and fire-fighting equipment: 1, itane), overhead lines, 1 mechanical allomatic security equipment, and the extraction (374 m). The vermiculus is extracted with a slurry of 1 562 vm in length, with auxiliary materials. The installation of jukeboxes (tools, jarming lift) is also a part of the task. - Goerditable group lifting equipment with 200kN loadbarsassal: 12 db - Futodaru, ultrasonic test tube, tester, non-movable mounting kit 1-1 Mechanical shaft cover: 2 pieces - Kezi tools, goggles - Instruments - Office equipment: 8 pieces - Nagyteherbirasu worktable: 16 db - Knife for iron sheet metal work: 22 db The winning bidder is responsible for the execution plans and the content of the content specified in the queueIn the case of the sample and the approval of the validation plan, and the work that will be completed within the framework of the framework agreement, the implementation of the tests and the tests, tests, and the implementation of the tests and the successful completion of these tests will be completed. Probauezem or trial duration is limited to 180 days. The tasks are included in the documents of the trialThe timekeeper reminds the caller's attention that, in the context of the present case-law, the design task is a plan-design task task for the execution plan., and can not take the opportunityssag is a true economic operator, The exclusionary reasons under - 62 (1) and (2) are under the control of one of them. According to - 67 (1), the economic operator shall promptly test the non-payment of exclusionary grounds and, in full compliance with the applicable requirements, the declaration contained in the single European bidding document. 6According to Section 7 (3), if the relevant requirements are met by the capacity of the timely mass organization, the organization shall have the opportunity to submit a copy of the available capacity of the organization. (1) of paragraph 1 of Article 67 and, at the time when the creditor submits, the body shall be excluded from the standpoint of the suitability criteriayou must confirm the suitability of the relevant equipment according to the same mod. According to - 67 (4), the date of the declarant's declaration that he does not apply for the contract of execution of the contract shall be admissible. Section 62 (1) and (2) of the Exclusion Causes. The statement must also be made if the date is not in the form-the name of the known subprojects is known. Article 67 (4) of the decree shall also be added to the timeframe if the contractor does not wish to enter into an agreement with the contractor in full compliance with the provisions of Article 321/2015. (X.30.) Gov. r. Section 8 and Section 10 of the Decree shall certify that it does not belong to the Kb. Section 62 (1) and (2)the scope of the exclusionary reasons set out in his zoos. For the purposes of Article 65 (1) (c) of the Act, the prospectus is to register the economic operator in the register or in the register of individuals, and the economic operator of the epithetics industry shall include the form(hereinafter referred to as "Etv.") for the construction industry. For the purposes of Article 65 (1) (c) of the Act, it is necessary to include all the design tasks on the part of the economic operators in the name of the relevant professional chamber in accordance with the design services of the relevant busi nessthey must have the status of a member of the planning service in the country in which they are resident, with active status chambers of tags. (1) (a) of Section 26 of the Decree (X.30.) Of the Hungarian Civil Code (hereinafter referred to as "the Hungarian Government"), and the information provided by the company is based on the data of the registrations of the private companies, as well as the information on the names of the companies involved in the construction of the epitheting industry. Planning Officer Affiliated to Investment Premise according to the requirements of the relevant national professionalThe economic operator is an active member of the bidding service provider in the country of his / her residency, as an active member of the statutory chamber of the resident of the Member State of residence, in the case of the Koezbeszerzesi six-point indictorthe electronic register of the indicated data is based on the basis. According to Article 67 (1), the Provider shall seek out the timers so that the economic operator shall be promptly informed of the professional activity of the affiliate. in compliance with the full declaration of the European Convention on the Acquisition of Proofs (P1). The taxpayer must enclose to the 321/2015. (X.30.) Korm. Decree of the Ministry of Agriculture and Rural Development of the Republic of Hungary on the basis of the total deadline for the submission of the summons, (rail infrastructure infrastructure and / or railway infrastructure atepitese and / or railway cand / or the design of a railway or an urban railroad railway or railroad railway) or a railway undertaking or a railroad railway or a railroad station, . A P1) in the case of an appropriate test case using the 321/2015. (X.30.) Govet Article 19 (3); (6) to (7) and (10) of the Regulation. The appropriate justification for the appropriate test method for P1 is given in the application of the declaration contained in the Single European Document. 67. In the case of the above-mentioned explanatory notes, the application of the above-mentioned explanatory notes is excluded. In accordance with Section 69 para. (4)About us 67 (2) and 321/2015. (X.30.) Korm. Of the Government of the Republic of Hungary take into consideration the timescales that the economic operator is the one in the European co-authoring document IV. the appropriate pre-approval of the appropriate test methods described above will be accepted by the• Approved certificate of attorney. Section 65 (6) - (8) and (11) of the Act of Accession. The minimum qualification (s): 2 P1) It is unsuitable for the time-consuming person to complete the full time before the deadline in the case of a substantial amount of turnover, the net amount of HUF 2 500 000 000 was not deducted; as well as in the dog(railway infrastructure infrastructure and / or railway infrastructure atepitese and / or railway ephemeral and / or railway infrastructure atepitese and / or rail cargo extension and / or design of these) a subordinated traffic congested on a certain arbevetele did not fail The net asset value of HUF 1, 250, 000, 000 is increased.During this time, real estate and other real estate properties in the railroads of the railroads are worth mentioning. In the case of P1), the test workers can meet on a regular basis. The timekeeper is looking for the timekeepers so that the present negotiating procedure is based on the basis of the EDF Regulation and the Ministry of Foreign Affairs has implemented the pre-(Electronic Koezbeszerzesi Rendszer), where electronic communications and the use of the EDF are not subject to the legal requirements of Article 3 (1) of the EDF Regulation. The summaries of the timescales are: 15 000 000 HUF, which can be fulfilled by the Kbt. Article 54 (2)according to. If a time-consuming agent is required to complete the Time Depositary by paying a deposit, he / she will be paid the same amount of money to be executed with the time-consuming MKB Bank 10300002-20609931-49020322. In this case, the simple taxpayer will be able to attach the taxable amount to the taxpayer. The author's request is that the present user is III.1.3) M2)(MV-E), and (B) a specialist is "MV-E", or "MV-E" or "MV-E" C) Specialist "MV-EG" or "MV-EV" D) Specialist "E" 4. The time is the professional time, which is the documenta-in addition to the researched content elements, from the tapered test all 5. Tenderer excludes the Kb. Article 35 para. (8) of the basic design documents. 6. III.1.2): P1, III.1.3): M1, M2, M3). 7. In the event of a delay, Tender for the Kbt. Section 71 is based on hianypoit is possible to ensure that if the promoter enters into the list of the non-registered economic operators in the future, and if this is the case with the host, the new hianypotlas will be subject to a new one. The winner is a timely tester at the time of the contract(HUF 200 million / year and HUF 100 million / person) and the design officer (40 million HUF / year and 20 million HUF / person) are tested according to the terms of the contract documents. It applies to Section 66 (2) of the Kbt. ando attached. 10th Section 66 (6) of the Kbt. (Supplement) (11). Section 134 (5) of the Kbt-ando attached. 12th Criterion criterion: the best arithmetic aspects that appear on gold are listed in clause II.2.5. For each aspect of the time constraints, the adhato score also has 0 points, the upper limit is 100. The standard methods are: 1. aspect of evaluation (one-time net worth-ar): translated golden content, 2-4. Your point of view: straight art. 13. In the case of point IV.2.6., 60 days are issued for 2 months. 14. Responsible accreditation in the field of co-procurement: Sarosi Tamas, registration number: 00278. 15. Tender for the Kbt. Article 75 (6) of the Law stipulates with a view to the fact that in the present case-law procedure-apply the Kbt. Article 75 (2) (e) of the Constitution. If it is not accepted in the case of a claimant or the acceptance of the claim in a smaller oasis, the deadline for the expiration of the due date will be affected by the knowledge of the timeframe, the claimant will not accept the request or the requestl consider the lower acceptance in the oessage to be considered as a test for which the bogus is considered in the Kbt. (6) of Article 53 (6) of the Law on Legal Proceedings (hereinafter referred to as "the law"). Internet address (URL): http://nif.hu/
The bid deadline for Contract notice: Railway construction works was 05 Nov 2018. Bidding is closed.
This tender has been issued by NIF NEMZETI INFRASTRUKTÚRA FEJLESZT? ZÁRTKÖR?EN M?KÖD? RÉSZVÉNYTÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45234100 - Railway construction works, 45231400 - Construction work for electricity power lines, 45234112 - Railway depot construction work, 45234115 - Railway signalling works, 45234116 - Track construction works, 45234160 - Catenary's construction works, 45234180 - Construction work for railways workshop, 45317000 - Other electrical installation work, 71240000 - Architectural, engineering and planning services, 71334000 - Mechanical and electrical engineering services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 26862210. The purchaser document reference is 404531-2018.