Contract notice: Railway construction works Tender - 25386368
Tender notice from Bulgaria, published on 28 Jul 2018.
Executive Summary
The ?? „?????????? ???????? „??????????? ??????????????“ has issued a Tender notice for the procurement of a Contract notice: Railway construction works in the Bulgaria. This Tender notice was published on 28 Jul 2018 and is scheduled to close on 03 Sep 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 25386368, while the tender notice number is 328496-2018 and Register on the platform.
Object of the contract Railway construction works Description: Contract notice: Railway construction works Authority Type: Body governed by public law Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45234100, 45234100, 45234115, 45234116, 45234130, 45234160, 45234100, 45234115, 45234116, 45234130, 45234160 CPV Description: Railway construction works - Railway signaling works - Track construction works - Ballast construction works - Catenary's construction works - Mechanized renewal of the railway from km. 18, 742 to km. 23 503 in the Vladaya - Dragichevo Intermediary with Materials of the 2nd Type 49 Use of the Contracting Authority The order, including the implementation of the activities, will be executed in 2 stages: Main Site: Vladaya --Dragichevo from km. 18, 742 to km. 23 503 The order includes the following activities: Stage I - preparation of a detailed design Stage II - execution of the construction works Implementation of the following activities: - Construction works on the lower and upper construction in the section - Cutting of bushes, branches and single trees in the easement of the railway track for opening of the gauge and visibility - 22 850 m, - Linear excavations-in soil soils for laying of ECT 200 x 50 with a load of transport - mechanized - 400 m, - Mechanized dismantling and loading from the interconnection of an existing 49 km / m from the railway. 18 742 (Node 1 at Vladaya Station) to km. 23 503 (№ 2 at Dragichevo railway station) - 4 761 m, - Transportation of an old type 49 railway track of wooden sleepers from the site to a Pernik station with a work train to20 km full / empty - 1 283, 82 tons, - Unloading and complete dismantling and stacking of an old railway type 49 - 4 761 m, - Transport of a new railroad with type 49 rails - second hand, new wooden sleepers and elastic fastener SKL-12 from the site in Pernik station to the site up to 20 km - full / empty - 215.72 tons, - laying of a new railway track - 4 761 m, - strengthening the jelly. road - after- 4 761 m, - Mechanized sifting of the ballast prism without extraction of seams with spreading and aligning within the confines of the easement - 3 211 m, - Mechanized sifting of the ballast prism with removal of seams and displacement within the confines - 1 550 m, - Making of the 1st level mechanized - 4 761 m, - Making the 2nd level mechanized - 4 761 m, - Making the 3 levels- mechanized - 4761 m - construction works on existing facilities; Materials for part of the railroad: - Rails type 49 - quality as fit - second use - obligation of the contracting authority, - - Ready-made second-hand railways item 49 of reinforced concrete sleepers St-6 with unscreened elastic fastener SKL-14, 1720 pcs / km without holes in the rail ends - 159 pcs. - obligation of the contracting authority. New wooden sleepers norm(1 720 pcs / km) - 5 632 sets - 6000 m rail - 6000 m rail - Rubber pad for wooden beams - 1 408 pcs Elastic fastener SKL-12 (CE-1) tr. - 2 816 pcs Bolt for double jung ties 24 x 560 mm tensile strength 5, 6 - 46 pcs Delivery and installation of insulated adhesive tape - 10 pcs Part of contact net. Dismantling: - Dismantling of the Pillar - 52 items, - Dismantlinganchor anchor - 8, - Dismantle of the middle anchor - 2, - Dismounting the disconnector - 1, - - Dismantling the disconnector motor power supply - 1 pc. ., - Dismantling of one-way consoles - 52, - Dismantling of harnesses and groundings for JB pillar - 52, - - Dismounting of electrical connections KP disconnector - 2 pcs, - Dismantling of QC - 3 pcs., - Demolition of pillar posts - 52 pcs MoConstruction of new pillars - 52, - Making of foundation F type "C" for BMK 3, 7 / 11 - 52, - Straightening of a pillar BMK 3, 7 / 11 - 52 pcs., - Construction of anchor anchor type KIA - 5, - Delivery and installation of a single column tensioner - 8 pieces, - Protective fences for excavation - 57, - Drainage - 2 m, - Removal on excavation ground - 5 m, - Mining and painting of j. pillare - 1 pc., - Rehabilitation of pillars foundations - 1 pc., - Signs "High voltage! Life-threatening! Do not go "- numbering and dating of pillars - 99, - - Installation of existing one-way consoles - 52, - - Installation of existing harnesses and groundings of JB pylons - 52, - - Disconnector installation supply of material) - 1 pc., - Installation of a motor power supply to a disconnector-(without material supply) - 1, - - Installation of electrical connections Disconnector KP (without delivery of the material) - 2, - - Regulation of air gaps with sectioning - 2, - - Regulation of air gaps without sectioning - 4, - Installation of an average anchorage - 2, - Transfer of QC - 3, - QC regulation - 3 - The participant must be registered in the Central Professional Register of Builders of the Chamber-of the builders in Bulgaria for execution of constructions from the second group - constructions from the transport infrastructure, according to art. 5, para. 1, item 2 of the Rules for Order for Entry and Maintenance of the Central Professional Register of Constructors (PIRVPPR), first category of constructions, according to Art. 5, para. 6, item 2.1 of the RVTPPRP, and foreign persons - in a similar register under the legislation of the Member Statewhere the participant is a consortium which is not a legal entity, compliance with the selection criterion shall be evidenced by each of the persons included therein who will carry out the respective activity according to the distribution of the participation of the persons in the implementation of the activities, provided in the consortium agreement document / agreement When the participant provides for subcontracting, -subcontractors must meet the relevant selection criteria according to the type and proportion of the order they will perform and for them there are no grounds for disqualification. When submitting the tender, compliance with the eligibility criterion is indicated in Part IV: "Criteria Selection ", section A:" Fitness "by eEEDOP. The following document shall be presented to demonstrate compliance with the criterion:certificate for entry in the Central Professional Register of the Builder to the Chamber of Builders in Bulgaria, for execution of Group II constructions: construction of the transport infrastructure, according to Art. 5, para. 1, item 2 of the Rules for Order for Entry and Maintenance of the Central Professional Register of Constructors (PIRVPPR), first category of constructions, according to Art. 5, para. 6, sub-paragraph 2.1 of the IPPCPRP. Aboutforeign persons falling within the scope of Art. 25a of the Chamber of Builders Act (CCS) shall be submitted the document under Art. 25a, para. 2, item 1 of the CPS. The document shall be submitted by the participant designated as contractor, in the case of Art. 67, para. 6 of the PPL - Continued from field III.1.3.) Expected minimum level (s): 2.5. and the equipment needed to perform. of the order, as follows: balancing machine - 1; balancing machine - 1; traversing machine - 1; hopper wagons - 10; diesel locomotive - 2; machines for mech. dismantling and laying of a railway - 1 pc. kit. Wagons for the transport of rail track material - 10 pcs. Chain Bulldozer - 1 pc. Grayder - 1 pc. Self-propelled excavators combined (rail)for excavation works - 2 pcs. Note: for heading "Machine tools for tailoring. laying of an iron road - 1 pc. kit ", the kit must contain a relevant mechanic (which, in the framework of a" window ", can perform dismantling and laying of a railway, simultaneously with the provided working front). 2.6.Validated certificate for the implemented quality management system according to the standard BDS EN ISO 9001: 2008 /-ISO 9001: 2015 or equivalent, with scope of certification, incl. the subject of the contract (project and construction of railway infrastructure objects / elements). The Assignor accepts other evidence. for equiv. quality assurance measures under Art. 64, para. 7 of the Public Procurement Act. 2.7. Valid certificate for an integrated environmental protection system according to BDS EN ISO14001: 2004 / ISO14001: 2015 or equivalent, with-scope of certification, incl. the subject of the contract (design and construction of sites / elements of railway infrastructure). The Assignor accepts other evidence. for equiv. measures for protection of the environment under the conditions of Art. 64, para. 7 of the Public Procurement Act. The participant must have achieved a minimum total turnover, calculated on a yearly basis. The participant should have a professional liability insurancefor the design and construction, according to Article 171 and Article 171a of the Territorial Planning Act If the participant is an association which is not a legal person, the compliance with the selection criterion under item 1 shall be proved by the participating association, 2 of each of the persons included therein, which will carry out the respective activity according to the distribution of the participation of the persons in the implementation of the activities envisaged in documentWhen a participant provides for subcontracting, subcontractors must meet the relevant selection criteria according to the type and proportion of the contract they will perform and for them there are no grounds for removal from the procedure. the participant provides for the participation of third parties, third parties must meet the relevant criteria for-selection for the proof of which the participant refers to their capacity and for them there are no grounds for removal from the procedure When submitting the tender the compliance with the criterion Economic and financial condition is indicated in Part IV: "Selection criteria", section B: "Economic and Financial Situation" by eEEDOP. Under the terms of Art. 67, para. 5 and para. 6 of the PPA, the criteria are provedwith the following documents: Under p.1. - one or more of the following documents: bank statements; annual financial statements or parts thereof when required to be published; statement - declaration of total turnover; - evidence of the existence of professional liability insurance for design and construction. In the open procedure, a participantand the conditions of Art. 10, para. 1 of the Public Procurement Act. The Assignor does not have the right to create a legal entity when the participant selected as a contractor is a union of natural and / or legal entities. Where the participant is a consortium which is not a legal person, a copy of a document must be provided showing the legal basis for the formation of the grouping with a time limit not shorter than the time limitthis public procurement contract. The document must contain: 1. the rights and obligations of the members of the grouping; the distribution of responsibility among the members of the grouping; the activities that each member of the group will perform. The assignor removes from the procedure the participant for whom the grounds under Art. 54, para. 1, item 1-7 of the Public Procurement Act, Art. 55, para. 1, item 1, item 4 and so on. 5 of the Public Procurement Act and Art. 107 of the Public Procurement Act, as well as the circumstances under Art. 3, item 8 and Art. 4 of the Economic and Financial Relations Act with the companies registered in preferential tax jurisdictions, the persons controlled by them and their actual owners and the presence of circumstances under Art. 69 of the Law on Counteracting Corruption and for Removing the Unlawfully Acquired Property. Every hthe non-legal entity, subcontractors and third parties must meet the relevant selection criteria and there should be no grounds for removal from the procedure. 67, para. 1 of the PPA when submitting the tender, the participant declares lack of the grounds for removal from the procedure and compliance with the selection criteria by presenting the enEEDOP.o the participant is a grouping which is not a legal entity when submitting the tender for participation, for each member of the consortium there is presented a separate enEEDOP. When the tenderer has indicated that he / she will use subcontractors and / or third parties when submitting the tender, each of them will be presented with a separate ENEDOP. The documents proving the information specified in the EDEDO may be requiredand in addition under the conditions of Art. 67, para. 5 of the Public Procurement Act. According to Art. 67, para. 6 of the Public Procurement Act before the conclusion of a public procurement contract, the tenderer designated as a contractor shall present up-to-date documents certifying the lack of grounds for removal from the procedure and compliance with selection criteria. Documents are submitted by each member of the grouping that is not a legal entity and a subcontractoris also the third parties, if any. Participants can obtain the necessary information about the obligations related to: Taxes and social security, environmental protection, employment protection and working conditions in the country that are in force and relevant to the subject of the contract, as follows: - taxes and insurance - NRA, www.nap.bg/ - environmental protection - MOEW, www.moew.government.bg/, protectionof employment - EA, https://www.az.government.bg/ - working conditions in the country - EA GIT, www.gli.government.bg/./ When the contract is concluded, provides a guarantee to secure the performance of the contract at the rate of 5% of the value of the contract without VAT. The guarantee for securing the execution of the contract is presented in one of the following forms: a) unconditional, bank guarantee in original; or (B) a cash amount paid to a current account of NRIC, IBAN: BG53CECB 9790 3319 1009 00, BIC: CECBBGSF with Bank of CCB AD, certified by a payment order; or C) insurance that ensures the performance of the contract in the original. When the collateral security. fulfilled. the contract is provided in the form of a bank. guarantee or insurerand the term of validity should be the duration of the contract plus 30 days. Terms and conditions for detention and release. of the performance guarantee are laid down in the contract for the assignment of order. Internet address (URL): www.rail-infra.bg
The bid deadline for Contract notice: Railway construction works was 03 Sep 2018. Bidding is closed.
This tender has been issued by ?? „?????????? ???????? „??????????? ??????????????“ in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45234100 - Railway construction works, 45234115 - Railway signalling works, 45234116 - Track construction works, 45234130 - Ballast construction works, 45234160 - Catenary's construction works.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 25386368. The purchaser document reference is 328496-2018.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.