Object of the contractProtective gear
Description: Contract notice: Protective gear
Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 18143000, 18830000, 18143000, 18830000, 18221300, 18221000, 18813100, 18815200
CPV Description: Protective footwear - Raincoats - Waterproof clothing - Sandals - Calf boots - Manufacture and / according to the following documents:
Main Site: Client's premises: Magyar Posta Zrt., Raktarozasies Keszletgazdalkodasi Szolgaltato Koezpont / Ruharaktar, 1149 Budapest, XIV. Egressy u. 35-51
Adasveteli szerződes Unisex shoe-garment production and delivery of shoes, net of 43 000 000 HUF in oesszertek, of which Ajanlatkerő net price is 12 900 000 HUF, in accordance with the validity test package, according to the documented order
The frame of the preserved survival, net 30 100-000 HUF for the right to offer the right to order.
Quantity of the following:
Winner on the basis of the price of the product in the amount of 4300 000 HUF in the quantity of 6650 pairs of unisex production and / or delivery of skis, - The given piece is of the same type as AjanlThis is not a case in point because of the fact that the contractor is in charge of the subject.
In the procedure, it is not possible to provide a time-consuming, undervalued, and not eligible economic operator to whom the Kbt. (1) - (2) of Section 62 (1). Article 74 (1) (b) shall be based on the time-tableyou have to exclude from that rule the listener, the subcontractor, or the organization that is eligible to do so, and the reason for the exclusion is the same as in the preceding paragraph.
Modified attestation:
Decree 321/2015 (X.30) hereinafter referred to as "Akr."). - 1 (1) of the time when the time-maker is given the time, the Egyetlen Europe(hereinafter referred to as ESPD), you must first confirm that you are not a Bid. The hypothesis of exclusion is defined in Article 62 (1) (2) of the Akr. Article 3 para. (1) of the Constitution shall be submitted by the person providing the right to an appropriate governmental authority, - and the time-table subsection in accordance with - 2. Garden-(ESPD).
In the case of a timeshare, all the timely providers of the ESPD will have to submit an ESPD.
In the context of the subprojects that are not eligible to the Applicant for a period of time. (4) of Section 67 of the Constitution. The declaration must also be issued if the date of issue did not come to an endnames.
The Akr. Article 15 para. (1) of the law on the subproblem of the subcontractor or the body receiving the provisional verdict, only the ESPD shall be tried by the Applicant. - The exclusion of the exclusionary reasons contained in - 62.
The statement concerning the exclusion of the exclusionary grounds is void in relation to the given condition. 69.-(11) of Regulation (EC) No 1782/2003, the complainant shall provide the grounds for the exclusion of the exclusion of the exclusion of the exclusion of the exclusion of goods and of the supporting information from the databases. Such data bases must also be available to economic operators in the appropriate form in the form, the Korm. order. stipulated.
contracting entities may point to the attention of the Public Procurement Act. 64.- (1) - (2). Contracting calls, furthermore, that the PPA. 69.- (4) - (6), documents must be submitted on the basis lenniuek present call dispatch koevető keltezesűeknek AKR
.. - 12. Based on those cases in which in - 28 and defined in - 36 recognized contractors fig official listit is evident from Article 30 and Article 39 that the economic operator does not fall into a category of exclu- sion, that the classified advertisers have an electronically available official record, and that the European Unio is an economic operator established in a number of Member States which is the official listener of the approved time-takers of his place of residencethe certificate of the certificate is also validated by the date of receipt of the certificate in accordance with Articles 8-11. Instead of other verified forms contained in -. (4) of the Act on the Protection of National Minorities in the Republic of Hungary:
The Hungarian State (s) and, where applicable, the eligible economic operator (s) Section 8 of the Tender Ordinance. Article 62 (1) and (2)The exclusionary reasons set out in paragraph 1 above are not valid.
In the case of a resident of Hungary who is not established in Hungary, • The rules of the law on the exclusion of the grounds for exclusion can be found in point 4 of Eljarasi utmutato, Chapter I of the Modern Time Booklet.
The Gift Provider is the Koezbeszerzesi Hato(1) Pursuant to Section 58 of the Kbt. (hereinafter referred to as KD), the following shall be made available: electronically, the regis- tered data shall be retrieved in full at the time of the applicable deadline, in full, in full, in full and in part in the near future: https://electool.com:443/sourcingtool/public.htmlwId=5b4a848fc20ceefdf879820cc1f9d2f2
All information on system requirements is provided by the helpdesk of Electool Hungary Kft. at
[email protected] and at 3618555999. We invite you to give your attention, give us a great deal of information on the registration process, given that the following communication is valid for the e-mail-they will do so, so the correct answer is the responsibility of the timer! (2) The Provider is responsible for providing you with a detailed list of timescales for your account: 1% of the total contract value, that is, the 1st installment: 430 000 HUF; Res. 2: 1 170 000 HUF; 3. resz:685 000 HUF; Res. 4: 505 000 HUF. The timescales are provided by the Kbt. Article 54 (2) can be achieved. Paying Loan With UniCredit Bank: 10918001-00000003-00330225. Provide official bank statements with a simple copy / pennies interest rate or a secured guarantee level or a solicitor's guaranty certificate.you or your partner, who is licensed under the terms of the contract, contains the original filing box attached to you. Further information on the commissioner is provided in the Ajanlatkeresi Dokument-ci- I. 9 point.
3) To the timekeeper, please refer to the Kbt. Section 66 (6) (a), it is necessary to indicate: the buyer who has completed the resetFor the essay, you should apply for the relevant sub-contract, and the Kbt. Section 66 (6) para. (4) The timekeeper must make a statement on the date of receipt of the aforementioned certificate. (5) The bidder is responsible for the resale of the baffle for the unfinished low ar surveyaccidentally disappears. (Kbt.81 - (4)).
6) Provider of the Kbt. Section 81 (5) It is based on the fact that the timing of the time is a matter of time. The timekeeper shall have the best or most favorable one or more favorable time-consuming person in the order in which the order is awarded. Section 66 (2), (4).
8) For the full text of the R & Section 47 (2) on the basis of the declarations can be made in simple form, with the exception of the Kbt. Section 66 (2), and in the case of a timely statement, the statement of the co-author and the guarantee statement, which documents are to be filed in the original file.
9) The present rule does not affect business and pennies(10) The timekeeper applies the lowest single point of view of time to all aspects of the service, given that the requirements of the time-of-use application correspond to the specified quality and technical requirements, and the most economically advantageous date is not further qualitative, only the-lowest service.
11) Tender for the Kbt. Section 75 (2) (e) shall not apply.
12) The time-consuming person must attach a professional report as specified in the document, otherwise the time period specified in the Kbt. Section 13, subsection (1), paragraph e) of this section is ungrounded.
13) In the present state of affairs, in non-regulated terms in KD, according to the Kbt.14) FAKSZ: Nagy Balazs 00801.
Internet address (URL): http://www.posta.hu
Directive: Classical Directive (2014/25/EU)