Object of the contractPromenade construction work
Description: Contract notice: Promenade construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45246500, 45110000, 45315100, 45233222, 45233000, 45246500, 45110000, 45315100, 45233222, 45233000
CPV Description: Promenade construction work.
Building demolition and wrecking work and earthmoving work.
Electrical engineering installation works.
Paving and asphalting works.
Construction, foundation and surface works for highways, roads.
Rewitalizacja bulwarow nad rzeką Czarna Hańcza
Reference Number : ZP.271.75.2018
1. Przedmiotem zamowienia jest Rewitalizacja bulwarow nad rzeką Czarna Hańcza.
Main Site : Miaone hundred Suwałki
1. The subject of the order is the Revitalization of the boulevards on the Czarna Hańcza River.
2. The scope of the orders includes the following construction works: - Construction of elements of management in the scope of: - preparatory and demolition works, - earthworks with replacement of non-bearing soil for aggregate with a capacity G1, - construction of a series of pavements made of concrete blocks, concrete slabs, stone cubes .
Nawierzgni gravel,
- construction of a bicycle path with an asphalt surface,
- construction of area lighting with illumination and power lines,
- greenery and delivery and assembly of small architecture elements (benches, garbage bins, bike racks, information boards, etc.)
3. The material and qualitative scope of the order is defined as follows:
a) SIWZ
b) Project documentation
c) SST
d)Significant provisions of the contract, constituting Annex No. 5 to the ToR.
5. The subject of the order should be made using the materials and devices specified in the project documentation.
6. All device and material names, if used in the SIWZ and its attachments are given for example and specify only the minimum expected quality parameters and the required standard, can be replaced byother equivalent, but the obligation to prove equivalence, in accordance with Art. 30 para. 5 of the PZP Act, it belongs to the Contractor.
7. The Contractor who invokes the equivalent solutions is obliged to demonstrate that the materials, equipment and construction offered by him meet certain requirements by the Employer.
8. The obligation to prove that the material (product) is equivalent to dthe Applicant is obliged to submit relevant documents, describing the technical and quality parameters, legally required certificates and other documents, allowing the materials (products) to be used, and making it clear that they are equivalent (under rejection of the offer).
9. Contractor at the timestepping into the robot is required to perform and mount 1 information board, and after completion of the robot 1 commemorative plaque. Boards should be made in accordance with the guidelines for information and promotion of projects co-financed from the European Union funds as part of the Regional Operational Program for the Podlasie Voivodeship for the years 2014-2020.
10. Design and content of tables andplace of their setting, the Contractor is obliged to agree with the Ordering Party
11. The order concerns a project financed from the EU funds under the project of the Regional Operational Program of the Podlasie Voivodeship for the years 2014-2020.
1. Ordering party pursuant to art. 29 paragraph 3a of the Act, requires employment by the contractor or subcontractor based on a contract of employment of all persons performing activities-in the scope of order fulfillment, the performance of which consists in performing work in the manner specified in art. 22 - 1 of the Act of 26.6.1974 - Labor Code (consolidated text: 2018, item 108, as amended).
2. The Employer requires employment by the Contractor or Subcontractors based on a contract of employment, persons performing activities in the following areas: - mechanical and manual shearing of trees and shrubs, rodemolition bots, earthworks, laying edges, curbs, laying paving, making lawns, planting trees and shrubs, laying cables, protective and protective pipes.
The ordering party does not place specific requirements to meet this condition.
List of statements or documents submitted by The Contractor in the proceedings at the request of the Employer to confirm the circumstances of approxreferred to in Article 25 ust. 1 point 1 of the Act concerning the economic or financial situation: a document confirming that the Contractor is insured against civil liability in the scope of conducted activity related to the subject of the order for a guarantee sum determined by the ordering party.regarding financial or economic situation, referred to above, may submit another document, which sufficiently confirms compliance with the condition described above for participation in the proceedings. The Contractor shall provide as part of its bid a bid bond in the amount of PLN 30, 000.00 (in words: thirty thousand zlotys).
2. The bid bond can be contributed in one or more of the following forms: a) money,
b) bank guarantees or social-savings co-credit sureties, with the surety that the surety is always a monetary guarantee;
c) bank guarantees;
d) insurance guarantees;
e) sureties granted by entities referred to in art. 6b par. 5 point 2 of the Act of 9.11.2000 on the establishment of the Polish Agency for Enterprise Development (consolidated text: Journal of Laws of 2016, p.oz. 359).
The bid bond paid in cash is paid by bank transfer to the bank account of the Municipal Office in Suwałki at Bank Pekao S.A. No. 76 1240 5211 1111 0000 4929 8215 by 2.10.2018 to the following hours 10:00 am (the date on which the funds are credited to the account of the ordering party). • The bid bond in the other forms is deposited with the City Office in the Department of Budget and Finances, room 147, ul. Mickiewicza 1, 16-400 Suwałki before the deadline for submission of tenders.
Each contractor must submit in the electronic form with a qualified electronic signature, valid on the day of submitting bids, a declaration referred to in Art. 22 of the Act, submitted in the form of a Uniform European Order Document (called EAT) which specifies the standard fora mule specified in the European Commission's implementing regulation issued on the basis of art. 59 par. 2 of Directive 2014/24 / EU. For the purpose of preliminary confirmation that it is not subject to exclusion and meets the conditions for participation in the proceedings. EAT should be sent to the following e-mail address:
[email protected]. In the event of joint application by contractors, EAT is submitted by each contractor to the jointordering. The above documents should confirm compliance with the conditions for participation in the proceedings, no grounds for exclusion to the extent that each of the contractors demonstrates fulfillment of the conditions for participation in the proceedings and no grounds for exclusion. If the Contractor refers to the resources of third parties in order to demonstrate compliance with the conditions for participation in the proceedings, he shall submit the entity to the entitythird. EAT should be completed to the extent that the contractor uses the resources of the third party and to verify the grounds for exclusion. If the Contractor intends to entrust the execution of a part of the order to subcontractors, he is obliged to complete part II of the D - EAT section, including, if known, subcontractors. EAT in α part IV of the form requires complexityia by the Contractor of the general statement on the fulfillment of the conditions for participation in the proceedings. The Contractor shall not complete further fields pertaining to the specific conditions of participation in the procedure specified by the Employer. Thus, the Contractor does not have to complete any of the remaining sections of part IV of the form.
In a situation where the Contractor relies on the ability or situation of other entities to baseh referred to in art. 22a of the Public Procurement Law. is obliged to prove to the ordering party that while performing the order, he will have the necessary resources of these entities, in particular presenting, together with the offer, the obligation of these entities to put at his disposal the necessary resources for the order execution.
Contractor, within 3 days of placing on the order website http: // bip.um.suwalki.pl/Przetargi_sekcja/ information, referred to in art. 86 par. 5, provides the Employer with a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23. Together with the submission of the statement, the contractor may provide evidence that links with another Contractor do not lead to distortion of competition in the procurement proceduresubmission. In the event that the Contractor does not belong to any capital group, he may submit a statement along with the offer.
The Contracting Authority informs that pursuant to art. 24aa paragraph 1 of the Act, will first evaluate the offers and then examine whether the contractor whose offer has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the proceedings.
According to art. 13 para. 1 and 2 of the RegulationEuropean Parliament and Council (EU) 2016/679 of 27.4.2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data and the repeal of Directive 95/46 / EC (General Data Protection Regulation) (Official Journal EU L 119, 4.5.2016, page 1), hereinafter "RODO", I would like to inform you that: - the administrator of your personal data is:-Miejski in Suwałki, with headquarters at ul. Mickiewicza 1, 16-400 Suwałki, 087-562 80 00 represented by the President of the City of Suwałki
- the inspector of personal data protection at the Municipal Office in Suwałki is Ms Teresa Mazur,
[email protected] - Ms / Ms personal data will be processed on the basis of art. 6 par. 1 lit. c ROPE for purposes related to the public procurement procedureego ZP.271.75.2018 under the name "Revitalization of boulevards on the Czarna Hańcza River" conducted in an unlimited tender. - recipients of your personal data will be persons or entities who will be provided with documentation of proceedings based on Article 8 and Art. 96 section 3 of the Act of 29.1.2004 Public Procurement Law (Journal of Laws of 2017, item 1579 and 2018), hereinafter the "PPL Act";
- Lordand / or your personal data will be stored, in accordance with art. 97 ust. 1 of the Public Procurement Law, for a period of 4 years from the date of completion of the procurement procedure, and if the duration of the contract exceeds 4 years, the retention period covers the entire duration of the contract;
- the obligation to provide your personal data directly to you is a statutory requirement set out in the provisions of the ActPzp, related to participation in the public procurement procedure; the consequences of failure to provide specified data result from the PPL; - in relation to your personal data, decisions will not be taken in an automated manner, - application to art. 22 RODO;
- you have:
- pursuant to art. 15 RODO the right of access to your personal data concerning -
pursuant to art. 16 RODO right to rectify your personal data *;
- pursuant to art. 18 RODO the right to request the administrator to restrict the processing of personal data, subject to the cases referred to in art. 18 para. 2 RODO **;
- the right to lodge a complaint to the President of the Office for Personal Data Protection, if you believe that the processing of personal data concerning you violates the provisions of the RODOWN;
- you are not entitled to:
- in connection with art. 17 sec. 3 lit. b, d or e RODO right to delete personal data;
- the right to transfer personal data referred to in art. 20 RODO;
- pursuant to art. 21 RODO right to object to the processing of personal data, as the legal basis for the processing of your personal data is art. 6 par. 1 lit. c RODO.
* Explanation: use ofthe right to rectify may not result in a change in the outcome of the public procurement procedure or change of the provisions of the contract to the extent incompatible with the Public Procurement Law and may not violate the integrity of the protocol and its annexes.
** Explanation: the right to limit processing does not apply to storage, in order to ensure the use of legal protection meansor to protect the rights of another natural or legal person, or for important reasons of public interest of the European Union or a Member State.
The ordering party does not provide for the order, referred to in art. 67 sec. 1 point 6 and 7.
The ordering party in accordance with art. 36a of the Public Procurement Law, allows the execution of part of the order with the participation of subcontractors.
The Ordering Party requests indication by the ContractorPart of the orders he intends to entrust to subcontractors, and submission of subcontractors by the Contractor.
If the change or resignation from the subcontractor concerns the entity on whose resources the Contractor referred, on the terms specified in art. 22a paragraph 1 of the Public Procurement Law, in order to demonstrate compliance with the conditions for participation in the proceedings, the Contractor is obliged to demonstrateOrdering party that the proposed other subcontractor or Contractor independently meets them to the extent not less than the subcontractor, on whose resources the Contractor referred during the proceedings for the award of the order.
5. The subcontractor is obliged to have appropriate rights if this is covered by the subject of the order.
The Procurer will exclude the contract from the procedure for awarding the contractthe oncator pursuant to art. 24 sec. 5 points 1, 2, 4 and 8 Pzp, i.e., 1) in relation to which the liquidation was opened, the court approved in the restructuring proceedings is expected to satisfy the creditors by liquidating its assets or the court ordered the liquidation of its property pursuant to art. 332 par. 1 of the Act of 15/05/2015. Restructuring law (ie, Journal of Laws of 2017, item 1508-from late zm.) or whose bankruptcy was announced, with the exception of the contractor who, after the bankruptcy, concluded a system approved by a final court decision, if the arrangement does not provide for satisfying the creditors by liquidating the assets of the bankrupt, unless the court ordered the liquidation of its property in accordance with art. 366 para. 1 of the Act of 28 February 2003 Bankruptcy Law (consolidated text: Journal of Laws of 2017, item 2344 from-Late. d.);
2) who in a manner of serious misconduct violated job duties, which undermines his integrity, in particular when the contractor as a result of deliberate act or gross negligence did not perform or improperly performed the order, which the contracting authority is able to demonstrate by means of evidence;
4) who, for reasons attributable to him, did not perform or did not properlyhas substantially affected an earlier contract for a public contract or a concession contract with the ordering party mentioned in art. 3 par. 1 point 1 4, which led to the termination of the contract or compensation for damages;
8) who violated obligations regarding tax payments, fees or social security or health insurance premiums, which the contracting authority is able to demonstrate by means ofevidence centers, except in the case referred to in Article 24 sec. 1 point 15, unless the contractor made payment of taxes, fees or social or health insurance contributions, including interest or fines or has entered into a binding agreement regarding the repayment of such receivables.
List of declarations or documents submitted by the Contractor in the proceedings at the request of the Awarding Entity-to confirm the circumstances referred to in the Article referred to in Article 25 ust. 1 point 3 of the Act (no grounds for exclusion):
a. information from the National Criminal Register in the scope specified in art. 24 sec. 1 points 13, 14 and 21 of the Act, issued not earlier than 6 months before the deadline for submitting offers;
b. a certificate from the competent head of the tax office confirming that the contractor is not responsible forega with payment of taxes, issued not earlier than 3 months before the deadline for submission of bids or other document confirming that the contractor has concluded an agreement with the competent tax authority regarding repayment of such receivables with possible interest or fines, in particular has obtained the legally required exemption, postponement or spreading overdue payments into installments or-suspension in full of the implementation of the decision of the competent authority;
c. certificate of the relevant local organizational unit of the Social Insurance Institution or Agricultural Social Insurance Fund or other document confirming that the contractor is not in arrears with payment of social security or health insurance contributions, issued not earlier than 3 months before the deadline for submission-bids, or other document confirming that the contractor has entered into an agreement with the competent authority regarding the repayment of such receivables, together with any interest or fines, in particular obtained legally permissible exemption, deferral or installment payment of overdue payments or suspension of the full implementation of the decision of the competent authority;
D. copy from the relevant register, or from the central registerrecords and information on business activities, if separate regulations require an entry in the register or records, in order to confirm the absence of grounds for exclusion based on art. 24 sec. 5 point 1 of the Act;
E. the contractor's statement that he has not been the subject of a final court judgment or a final administrative decision on defaulting on payment of taxes, fees or insurance premiums-social or health, or in the event of such a verdict or decision, documents confirming the payment of these claims together with any interest or fines or the conclusion of a binding agreement regarding the repayment of such claims; the contractor's statement about the lack of a ruling against him as a preventive measure for the prohibition of applying for public orders;
G. learningscontracting the contractor not to pay taxes and local fees, as referred to in the Act of 12.1.1991 on local taxes and charges (Journal of Laws of 2017, item 1785);
1. The Contractor having its registered office or place of residence outside the territory of the Republic of Poland shall submit documents in accordance with the provisions of the Regulation of the Minister of Development of 26.7.2016 on the types of documents, akich may be requested by the contracting authority from the contractor in the proceedings for the award of the contract (Journal of Laws of 2016, item 1126).
2. If the Contractor is established or resides outside the territory of the Republic of Poland, instead of the documents referred to in Chapter 12 para. 10:
a. point a shall provide information from the relevant register or, in the absence of such a register, another equivalent document issued bythe competent judicial or administrative body of the country in which the contractor has its registered office or place of residence or the person concerned by the information or document, to the extent specified in art. 24 sec. 1 items 13, 14 and 21 (document issued not earlier than 6 months before the deadline for submission of tenders)
b. point b-d consists of a document or documents issued in the country in which youthe convention has its registered office or place of residence, confirming that: - it is not in arrears with paying taxes, fees, social security or health insurance contributions or that it has entered into an agreement with the competent authority regarding repayment of such receivables with possible interest or fines, in particular legally required exemption, postponement or installment payment of overdue paymentsor a full suspension of the implementation of the decision of the competent authority, (a document issued not earlier than 3 months before the deadline for submission of tenders) - - its liquidation was not opened or bankruptcy was declared (a document issued not earlier than 6 months before the deadline for submission of tenders).
3. If in the country in which the contractor has its registered office or place of residence or place ofif the person concerned is affected by the document, the documents referred to in paragraph 2, it is replaced by a document containing the statement of the contractor, indicating the person or persons authorized to represent it, or a statement of the person to whom the document concerned, submitted to a notary or before a judicial, administrative or self-regulatory body, or-appropriate for the seat or place of residence of the contractor or place of residence of that person.
4. In the event of any doubts as to the content of the document submitted by the contractor, the contracting authority may contact the competent authorities of the country in which the contractor has its registered office or place of residence or the person concerned, for grantingsome information about this document.
5. Contractor established on the territory of the Republic of Poland, in relation to a person residing outside the territory of the Republic of Poland, which is referred to in the document indicated in Chapter 12 par. 10 lit a, submit the document referred to in Chapter 13 para. 2 letter a, within the scope defined in art. 24 sec. 1 points 14 and 21.
6. If in-the country where the person is in the place of residence, whose document was to be related, such documents are not issued, it is replaced by a document containing a statement made by the person before a notary or before a judicial, administrative or professional self-government or economic authority competent for the place of residence persons.
7. In case of doubt as to the contents of docThe ordering party may contact the competent authorities of the country in which the person concerned is domiciled, for providing the necessary information regarding this document.
8. Documents prepared in a foreign language must be submitted together with a translation into Polish. Required documents when referring to the resources of other entities. In sytwhen the Contractor relies on the abilities or situation of other entities on the terms set out in Article 22a of the Public Procurement Law, the contractor is obliged to prove to the orderer that while fulfilling the order, he will have the necessary resources of these entities, in particular presenting, together with the offer, the obligation of these entities to give him the necessary resources to fulfill the order.
B. The presented document must contain in particular:
1) scope of available contractor resources of another entity,
2) manner of using the resources of another entity, by the contractor, while performing the public order;
3) scope and period of participation of another entity when performing public order;
4) whether the entity, on the capacities of which the contractor relies in relation to the conditions of participation inproviding information about education, professional qualifications or experience, will carry out construction works whose indicated abilities concern.
C. The obligation of another entity should be submitted in the original.
D. The contractor, which relies on the financial or economic situation of other entities, is jointly and severally liable with the entity that has committed to provide resources for the damage suffered bythe ordering party arising from the non-availability of these resources, unless the failure to provide access to resources is not at fault.
E. If the Contractor demonstrating compliance with the conditions referred to in art. 22 ust. 1 relies on the abilities or situation of other entities under the principles set out in art. 22a of the Public Procurement Law, the orderer demands from the contractor to present documents regarding these entitiesno grounds for exclusion referred to above.
The Contracting Authority informs that pursuant to art. 26 par. 2f of the Public Procurement Law, if it is necessary to ensure the proper conduct of the procurement procedure, the Employer may at any stage of the procedure call for contractors to submit all or some declarations or documents confirming that they are not subject to exclusion, make the conditions for participation in the procedure or the selection criteria, and if there are reasonable grounds to consider that the previously submitted statements or documents are no longer valid, to submit valid declarations or documents.
In the case of the contractor indicating the availability of statements or documents, in electronic form under specified, public and free Internet addressesdatabases, the orderer retrieves declarations or documents indicated by the contractor independently from these databases.
The Contractor is not obliged to submit declarations and documents confirming the circumstances referred to in art. 25 ust. 1 point 1 and 3 of the Public Procurement Law, if the Orderer has statements or documents regarding this Contractor or may obtain them by means of free and generalof nonesign databases, in particular public registers within the meaning of the Act of 17.2.2015 on computerization of the activities of entities performing public tasks (Journal of Laws of 2017, item 570).
In the case of the contractor indicating statements or documents that are in the possession of the orderer, in particular statements or documents held by the contracting partyNot from art. 97 ust. 1 of the Act, the orderer to confirm the circumstances referred to in art. 25 ust. 1 point 1 and 3 of the Act, makes use of possessed statements or documents, as long as they are valid.
Internet address (URL): www.um.suwalki.pl