Expired Tender Poland ICB TOT Ref. 24701717

Contract notice: Promenade construction work Tender - 24701717

Tender notice from Poland, published on 04 Jul 2018.

Executive Summary

The MIASTO SUWA?KI has issued a Tender notice for the procurement of a Contract notice: Promenade construction work in the Poland. This Tender notice was published on 04 Jul 2018 and is scheduled to close on 14 Aug 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 24701717, while the tender notice number is 287085-2018 and Register on the platform.

Key facts

Summary
Contract notice: Promenade construction work
TOT Ref. No.
24701717
Document Ref. No.
287085-2018
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
04 Jul 2018
Bid deadline
14 Aug 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Promenade construction work
Description: Contract notice: Promenade construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45246500, 45248000, 45246500, 45248000, 45110000, 45315100, 45233222, 45233000
CPV Description: Promenade construction work.
Construction work for hydro-mechanical structures.
Building demolition and wrecking work and earthmoving work.
Electrical engineering installation works.
Paving and asphalting works.
Construction, foundation and surface works for highways, roads.
Rewitalizacja bulwarow nad rzeką Czarna Hańcza
Reference Number : ZP.271.61.2018
1. Przedmiotem zamowienia jest Rewitalizacja boulevard on the Czarna Hańcza river.
Main Site: Suwałki
Hydrotechnical part 1 comprising:
1) Regulation of the river banks with strengthening of the embankment base
- silting of the river bottom on sections according to technical documentation,
- strengthening of the river bed and banks with stone coating on sections in accordance with the technical documentation,
- strengthening river banks on both sides with gabions on sections according to the docktechnical mentation - reinforcement of foot and slopes on both sides of the river in the form of wooden stakes and fascines, sowing river embankments with grass, from km 69 850 to km 70 825.
2) Recreational wharf and canoe slip
2a. A recreational wharf consisting of a sheet steel wall, on its crown a reinforced concrete cap 75x25 cm made of C25 / 30 concrete. at the top, a prefabricated reinforced concrete prefabricate-the wharf layer. Behind the wharf, seats and field stairs in the form of gabions arranged on a layer of lean concrete, covered with composite wood panels. The length of the wharf is 58.1 m,
2.b. Slip for canoes, a bridge element with a wooden structure set on wooden stilts with a diameter of 15 cm and a length of 3.1 to 4 m. The heads are fixed with wooden beams, on which the proper deck has been installed.ad wooden from planks 292x20x4 cm.
3) Fish crucible and renovation of the weir
- demolition works
- earthworks with the execution of a temporary circulation channel for the needs of performed works with all accompanying works and necessary arrangements with the relevant institutions,
- execution after on the east side of the weir, 3.2 m long retaining wall, - reinforced concrete structuregutters and concrete culverts chamber
Hydrotechnical C25 / 30, lined with stone lining,
- extension of the basin of the weir,
- renovation of the existing weir.
4) Footbridge and bicycle system with free-standing scheme of the structure in the form of grate on steel beams. Supports in the form of monolithic abutments with suspended wings. Direct foundation in the housing from the walls of theprimates. The length of the object with supports 11.8 m, width 3.0 m. The plating of the footbridge made of composite wood boards. Execution of a workshop and assembly project with delivery and assembly of steel balustrades with a variable surface of gaps with wood-like elements, in accordance with the architectural part of the project.
3. The material and qualitative scope of the subject matter of the order is defined asin brief:
a) SIWZ
b) Project documentation
c) SST
d) Material provisions of the contract, constituting Annexes 5.1 and 5.2 to the ToR.
5. The subject of the order should be made using the materials and devices specified in the project documentation.
6. All device and material names, if used in the SIWZ and its attachments are given as an example and specify only the minimum expected paramqualitative ethers and the required standard may be replaced by other equivalents, however, the obligation to prove equivalence, in accordance with art. 30 para. 5 of the PZP Act, it belongs to the Contractor.
7. The Contractor who invokes the equivalent solutions is obliged to demonstrate that the materials, equipment and construction offered by him meet certain requirements by the Employer.
8. Obligationproving that the material (product) is equivalent to the requirement specified by the Ordering Party rests with the offeror - the Contractor is required to submit relevant documents, describing the technical and quality parameters, required by law certificates and other documents that allow the materials (products) to be used and allowing to state clearly that they are equivalentne (under pain of rejection of the offer).
9. The contractor, upon joining the robot, is obliged to perform and install 1 information board, and after completion of the robot 1 a commemorative plaque. Boards should be made in accordance with the guidelines for information and promotion of projects co-financed from the European Union funds as part of the Regional Operational Program of the VoivodshipPodlasie for the years 2014-2020.
10. The design and content of the tables and the place of their placement The Contractor is required to agree with the Employer
11. The Ordering Party reserves the right, in accordance with art. 93 para. 1a of the PZP Act, annulment of each part of the procedure for awarding the contract, if the funds from the European Union budget which the Employer intended to allocate to finance the entireand / or parts of the orders will not be awarded.
12. The order concerns a project financed from the EU funds under the project of the Regional Operational Program of the Podlasie Voivodeship for the years 2014-2020.
Employer pursuant to art. 29 paragraph 3a of the Act, requires employment by the contractor or subcontractor based on a contract of employment of all persons performing activities in the scope of the orderwhose execution consists in performing work in the manner specified in art. 22 -1 of the Act of 26.6.1974 - Labor Code (consolidated text: 2018, item 108, as amended).
The Employer requires employment by the Contractor or Subcontractors based on a contract of employment of persons performing activities in the following scope: - Part 1 - concreting, formwork, preparation and assembly of reinforcement, pile drivingand, execution of the insulation, construction and plating of the platform.
The Ordering Party does not set specific requirements to meet this condition.
The Economic Operator shall consider the Contractor's insurance of civil liability in the scope of business activity related to the subject of the contract for fulfilling the condition regarding the economic and financial situation for an amount of noless than PLN 200, 000.00 for part 1 and PLN 300, 000 for part 2 orders.
In the case of submitting an offer for both parts, the condition regarding the economic and financial situation will be considered fulfilled if the contractor proves that he has third-party liability insurance scope of business activity related to the subject of the order for an amount not less than 300 000.00 PLN.
The Purchaser informs that pursuant to art. 24aa paragraph 1 of the Act, it will first evaluate the offers and then examine whether the contractor whose offer has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the procedure. - The Contractor will provide as part of its bid a deposit of: PLN 0.00 (say: twenty thousand zlotys), part 2 PLN 30, 000.00 (in words: thirty thousand zlotys).
The bid bond can be paid in one or more of the following forms:
a) in money;
b) bank sureties or credit and savings bank sureties, except that the surety cash register is always a financial guarantee;
c) bank guarantees;
d) insurance guarantees;
e) sureties granted by entities, -referred to in art. 6b par. 5 point 2 of the Act of 9.11.2000 on the establishment of the Polish Agency for Enterprise Development (ie Journal of Laws of 2016, item 359).
The bid bond paid in cash is paid by bank transfer to the bank account of the Municipal Office in Suwałki at Bank Pekao ARE No. 76 1240 5211 1111 0000 4929 8215 by 14.8.2018 to the following hours 10:00 (the date on which the funds are credited to the account of theIn the remaining forms, the original is deposited with the City Hall in the Budget and Finance Department, room 147, ul. Mickiewicza 1, 16-400 Suwałki before the deadline for submission of tenders.
Each contractor must submit before the deadline for submission of tenders in an electronic form with a qualified electronic signature, valid as of the day of submitting bids, a declaration on-referred to in art. 22 of the Act, submitted in the form of a Single European Order Document (called EED) which specifies the standard form specified in the European Commission's implementing regulation issued on the basis of art. 59 par. 2 of Directive 2014/24 / EU. For the purpose of preliminary confirmation that it is not subject to exclusion and meets the conditions for participation in the proceedings. EAT should be sent to adres email: [email protected] In the case of joint application for contractors, JINS are submitted by each of the contractors jointly applying for the order. The above documents should confirm compliance with the conditions for participation in the proceedings, no grounds for exclusion to the extent that each of the contractors demonstrates fulfillment of the conditions for participation in the proceedings and no grounds for exclusion. HedgehogThe Contractor refers to the resources of third parties in order to demonstrate compliance with the conditions for participation in the proceedings, he shall submit to the third party. EAT should be completed to the extent that the contractor uses the resources of the third party and to verify the grounds for exclusion. If the Contractor intends to entrust the execution of a part of the order to subcontractors, it is a commitmentPart II, section D - EAT, including, if known, subcontractors. EAT in α part IV of the form requires submission by the Contractor of a general statement on the fulfillment of the conditions for participation in the proceedings. The Contractor shall not complete further fields pertaining to the specific conditions of participation in the procedure specified by the Employer. Thus, the Contractor does not have to fillnone of the other sections of part IV of the form - in a situation where the Contractor relies on the abilities or situation of other entities on the terms specified in art. 22a of the Public Procurement Law. is obliged to prove to the orderer that while performing the order, he will have the necessary resources of these entities, in particular presenting, together with the offer, the obligation of these entities to give him a dispositionnecessary resources for the needs of the order.
Contractor, within 3 days from the date of posting on the website http://bip.um.suwalki.pl/Przetargi_sekcja/ information, referred to in Article. 86 par. 5, provides the Employer with a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23. Together with the declarationa, the contractor may provide evidence that links with another Contractor do not lead to distortion of competition in the procurement procedure. In the event that the Contractor does not belong to any capital group, he may submit a statement together with the offer.
Pursuant to Art. 13 para. 1 and 2 of Regulation (EU) 2016/679 of the European Parliament and of the Council of 27.4.2016 on the protection of natural persons in-regarding the processing of personal data and on the free flow of such data and the repeal of Directive 95/46 / EC (general regulation on data protection) (Official Journal L 119 of 04.05.2016, page 1), hereinafter "RODO", inform that: - the administrator of your personal data is: Municipal Office in Suwałki, with registered office at Mickiewicza 1, 16-400 Suwałki, 087 562 80 00 represented by-The President of the City of Suwałki - the personal data protection officer at the Municipal Office in Suwałki is Ms. Teresa Mazur, [email protected]/Pana personal data will be processed on the basis of art. 6 par. 1 lit. c ROPE for the purpose related to the public procurement procedure ZP.271.61.2018 entitled: "Revitalization of boulevards on the Czarna Hańcza River" conducted in the form of a non-your recipients will be persons or entities to whom the documentation of proceedings based on art. 8 and art. 96 para. 3 of the Act of 29.1.2004. Public Procurement Law (Journal of Laws of 2017, item 1579 and 2018), hereinafter the "PZP Act";
- Your personal data will be stored in accordance with Article 97 paragraph 1 of the PZP Act, for a period of 4 years from the day of completionProceedings for ordering, and if the duration of the contract exceeds 4 years, the retention period covers the entire duration of the contract;
- the obligation to provide your personal data directly to you is a requirement statutory stipulated in the provisions of the Public Procurement Law, related to participation in the proceedings for granting a public order; consequences of not giving specified dataies result from the Public Procurement Law - in relation to your personal data decisions will not be taken in an automated manner, application to art. 22 RODO;
-you have:
- on the basis of art. 15 RODO the right of access to your personal data relating to; - on the basis of art. 16 RODO right to rectify your personal data *;
- pursuant to art. 18 RODO the right to request from the administrator ograprocessing of personal data, subject to the cases referred to in Article 18 para. 2 RODO **;
- the right to file a complaint to the President of the Office for Personal Data Protection, if you decide that the processing of your personal data violates the provisions of the GDPR -
you are not entitled to:
- in connection with the Article . 17 sec. 3 lit. b, d or e RODO right to delete personal data;
- prawo to transfer personal data, referred to in art. 20 RODO;
- pursuant to art. 21 RODO right to object to the processing of personal data, as the legal basis for the processing of your personal data is art. 6 par. 1 lit. c RODO.
* Explanation: exercising the right of rectification must not result in a change in the outcome of the public procurement procedure or change of provisions-agreements in the scope inconsistent with the PZP Act and may not violate the integrity of the protocol and its annexes.
** Explanation: the right to limit processing does not apply to storage, in order to ensure the use of legal protection means or to protect the rights of another natural or legal person, or for important reasons of public interest of the European Unionor a Member State.
The ordering party does not provide for the order, referred to in art. 67 sec. 1 point 6 and 7.
The ordering party in accordance with art. 36a of the Public Procurement Law. allows the execution of a part of the order with the participation of subcontractors.
The Ordering Party requests the Contractor to indicate the part of the orders, the execution of which he intends to entrust subcontractors, and provide the Contractor subcontractors.
Jeżeland the change or resignation from the subcontractor concerns the entity for which the Contractor referred to the resources, on the terms specified in art. 22a paragraph 1 of the Public Procurement Law Act, in order to demonstrate compliance with the conditions of participation in the proceedings, the Contractor is obliged to demonstrate to the Employer that the proposed other subcontractor or Contractor independently meets them to the extent not less than the subcontractor, -on which resources the Contractor referred during the proceedings for the award of the contract.
5. The subcontractor is obliged to have appropriate rights if it is covered by the subject of the order.
From the procedure for awarding the order, the Contracting Authority will exclude the Contractor based on art. 24 sec. 5 points 1, 2, 4 and 8 Pzp, i.e.
1) in relation to which the liquidation was opened, in the case approved byThe arrangement in the restructuring proceedings is intended to satisfy the creditors by liquidation of its assets or the court ordered the liquidation of its assets pursuant to art. 332 par. 1 of the Act of 15.5.2015. Restructuring law (ie, Journal of Laws of 2017, item 1508, as amended) or whose bankruptcy was announced, with the exception of a contractor who, after the declaration of bankruptcy, concluded an agreement approved bya valid court order, if the agreement does not provide for the satisfaction of the creditors by liquidating the assets of the bankrupt, unless the court ordered the liquidation of its assets pursuant to art. 366 para. 1 of the Act of 28.2.2003 Bankruptcy Law (Journal of Laws of 2017, item 2344, as amended),
2) who in a manner of serious misconduct has violated professional duties, which undermines his integrity, in specificity when youthe contractor, as a result of intentional action or gross negligence, did not perform or improperly performed the order, which the orderer is able to prove by means of appropriate evidence; 4) who, for reasons attributable to him, did not perform or did not properly execute the earlier contract in a significant degree on a public contract or a concession contract, concluded with the ordering party about which-referred to in art. 3 par. 1 point 1 4, which led to the termination of the contract or award damages;
8) who violated obligations relating to payment of taxes, fees or social security or health insurance contributions, which the contracting authority is able to prove by means of appropriate evidence, except in the case of referred to in art. 24 sec. 1 point 15, unless the contractor has made the payment duetaxes, fees or social security or health insurance contributions with interest or fines or a binding agreement on the repayment of such claims.
List of statements or documents filed by the Contractor in the proceedings at the request of the Employer to confirm the circumstances referred to in the speech in art. 25 ust. 1 point 3 of the Act (no grounds for exclusion):
a. information-from the National Criminal Record in the scope specified in art. 24 sec. 1 points 13, 14 and 21 of the Act, issued not earlier than 6 months before the deadline for submitting offers;
b. certificate of the competent head of the tax office confirming that the contractor is not in default of paying taxes, issued not earlier than 3 months before the deadline for submission of offers or other document of monsterthat the contractor has concluded an agreement with the competent tax authority regarding the repayment of such receivables, together with any interest or fines, in particular obtained the legally required exemption, postponement or spreading into installments of overdue payments or suspension in full of the execution of the decision of the competent authority. certificate of the relevant local organizational unit of the Zakład UbSocial security or Agricultural Social Insurance Fund or other document confirming that the contractor is not in arrears with paying social security or health insurance contributions, issued not earlier than 3 months before the deadline for submission of bids, or other document confirming that the contractor has concluded an agreement with the competent authority in on the repayment of these debtstogether with any interest or fines, in particular obtained the legally required exemption, postponement or payment in installments of overdue payments or suspension in full of the implementation of the decision of the competent authority;
d. an excerpt from the relevant register, or from central records and business information, if separate regulations require an entry in the register or records, in order to confirmno grounds for exclusion based on art. 24 sec. 5 point 1 of the Act;
e. the contractor's statement that he has not been the subject of a final court judgment or final administrative decision on late payment of taxes, fees or social security or health insurance premiums, or in the event of a verdict or decision confirming the payment of thesereceivables with possible interest or fines or a binding agreement regarding repayment of such receivables,
f. the contractor's statement about the lack of a ruling against him as a preventive measure of the prohibition against applying for public orders; the Contractor's statements about not paying taxes and local fees, referred to in the Act of 12.1.1991 on Taxes and Taxeslocal patches (OJ of 2017, item 1785);
1. The Contractor having its registered office or place of residence outside the territory of the Republic of Poland submits documents in accordance with the provisions of the Regulation of the Minister of Development of 26.7.2016 on the types of documents that the contracting authority may request from the contractor in the procurement procedure (Journal of Laws of 2016, item .1126).
2. If the Contractor is sittingor a place of residence outside the territory of the Republic of Poland, instead of the documents referred to in Chapter 12, para. 10
a. point a shall submit information from the relevant register or, in the absence of such a register, another equivalent document issued by the competent judicial or administrative body of the country in which the contractor has its registered office or the place of residence or place of residence has a personwhich concerns information or a document, to the extent specified in art. 24 sec. 1 items 13, 14 and 21 (document issued not earlier than 6 months before the deadline for submission of tenders)
b. point b-d consists of a document or documents issued in the country in which the contractor has its registered office or place of residence, confirming that: - it is not in arrears with paying taxes, fees, insurance premiumssocial security or health care, or that it has entered into an agreement with the competent authority regarding the repayment of such claims together with any interest or fines, in particular it has obtained the legally required exemption, deferral or payment in installments of overdue payments or suspension in full of the competent authority's decision (document issued not earlier than 3 months before the deadline-the submission of tenders) - - its liquidation was not opened or bankruptcy was declared (a document issued not earlier than 6 months before the deadline for submission of tenders).
3. If the country in which the contractor has its registered office or place of residence or place of residence has a person to whom the document refers, no documents referred to in paragraph 2, shall be replaced by a document containing the replyednio statement of the contractor, with the indication of the person or persons authorized to represent it, or a statement of the person to whom the document was to be submitted, filed before a notary or before a judicial, administrative or self-regulatory or economic authority competent for the seat or place of residence of the contractor or place residence of this person.
4. In case of doubtas to the content of the document submitted by the contractor, the contracting authority may apply to the competent authorities of the country in which the contractor has the registered office or the place of residence of the person to whom the document applies for providing the necessary information regarding this document. Contractor based in the territory of the Republic of Poland, in relation to the person of Mayresiding outside the territory of the Republic of Poland, which is referred to in the document indicated in Chapter 12 par. 10 lit a, submit the document referred to in Chapter 13 para. 2 letter a, within the scope defined in art. 24 sec. 1 points 14 and 21.
6. If in a country where the person whose document is to be residing is domiciled, no such documents are issued, it shall be replaced by a documentproviding a statement of that person to a notary or to a judicial, administrative or professional body competent for the place of residence of that person. In case of any doubts as to the content of the document submitted by the contractor, the Contracting Authority may contact the competent authorities of the country in which the person has the place of residence, whoset applies for providing the necessary information regarding this document.
8. Documents prepared in a foreign language must be submitted together with a translation into Polish. Required documents when referring to the resources of other entities. In a situation where the Contractor relies on the abilities or the situation of other entities on the terms specified in art. 22a of the Public Procurement Law. is obliged to prove-to the orderer that while performing the order, he will have the necessary resources of these entities, in particular presenting, together with the offer, the obligation of these entities to give him the necessary resources for the needs of the order.
b. The presented document must contain in particular:
1) scope of available contractor resources of another entity;
2) way of using resources-another entity, by the contractor, when performing the public order;
3) scope and period of participation of another entity when performing public order;
4) whether the entity, on the capacities of which the contractor relies in terms of participation in education related proceedings, professional qualifications or experience, will carry out construction works, the indicated capacities concern.-
C. The obligation of another entity should be submitted in the original.
D. The contractor, which relies on the financial or economic situation of other entities, is jointly and severally liable with the entity that committed to provide resources, for damage suffered by the orderer resulting from not sharing these resources, unless the failure to provide access to resources is not at fault.
E. If the Contractor demonstrating-meeting the conditions referred to in art. 22 ust. 1 relies on the abilities or situation of other entities under the principles set out in art. 22a of the Public Procurement Law, the orderer demands from the contractor to present in relation to these entities the documents regarding the lack of grounds for exclusion, referred to above.
The Contracting Authority informs that pursuant to art. 26 par. 2f of the Public Procurement Law, if it is necessary forensure the proper conduct of the procurement procedure, the Awarding Entity may at any stage of the procedure call for contractors to submit all or some declarations or documents confirming that they are not subject to exclusion, meet the conditions for participation in the procedure or selection criteria, and if there are reasonable grounds to consider that the submitted previous statementsor the documents are no longer valid, to submit valid statements or documents.
In the case of the contractor indicating the availability of statements or documents, in electronic form under specified Internet addresses of free access and free databases, the contracting party collects the statements or documents indicated by the contractor independently from these databases.
The contractor is not obligedany statements and documents confirming the circumstances referred to in art. 25 ust. 1 point 1 and 3 of the Public Procurement Law, if the Orderer possesses declarations or documents regarding this Contractor or may obtain them through free and publicly available databases, in particular public registers as defined in the Act of 17.2.2015 on computerization of entities' activitieslicking public tasks (Journal of Laws of 2017, item 570).
If the contractor indicates declarations or documents that are in the possession of the ordering party, in particular statements or documents stored by the ordering party in accordance with art. 97 ust. 1 of the Act, the orderer to confirm the circumstances referred to in art. 25 ust. 1 point 1 and 3 of the Act, uses the possessedh statements or documents, as long as they are current.
Internet address (URL): www.um.suwalki.pl
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Promenade construction work was 14 Aug 2018. Bidding is closed.

This tender has been issued by MIASTO SUWA?KI in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45246500 - Promenade construction work, 45248000 - Construction work for hydro-mechanical structures, 45110000 - Building demolition and wrecking work and earthmoving work, 45315100 - Electrical engineering installation works, 45233222 - Paving and asphalting works, 45233000 - Construction, foundation and surface works for highways, roads.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 24701717. The purchaser document reference is 287085-2018.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.