Contract notice: Pipes Tender in Poland - 21577088
Tender notice from Poland, published on 16 Mar 2018.
Executive Summary
The KOPALNIA SOLI „WIELICZKA" SPÓ?KA AKCYJNA has issued a Tender notice for the procurement of a Contract notice: Pipes in the Poland. This Tender notice was published on 16 Mar 2018 and is scheduled to close on 26 Apr 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 21577088, while the tender notice number is 117011-2018 and Register on the platform.
Object of the contract Pipes Description: Contract notice: Pipes Authority Type: Other Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: Lowest price CPV code: 44163100, 44163100 CPV Description: Pipes. Delivery of polyethylene pipes Reference Number: KSW / 2018 / EL / 27 The subject of the orders is the sale together with the delivery of: Main Site: Wieliczka Salt Mine SA 32-020 Wieliczka, Kinga Park 1. 1. Contractor and will provide the Employer with the pipes referred to in part II.1.4) of this announcement, the following types and in the following quantities (maximum quantity): 1) PE-NP AS pipePE-GG PN 1, 6 MPa 0 180 mm x 16.4 mm x 6, 000 mm flame-retardant and anti-static (without armor), collided on both sides in an amount of 1500 mb, 2) PE-NP AS PE-GG PN 2, 5 MPa 0 140 mm x 19.2 mm x 6, 000 mm flame-retardant and antistatic (without armor), collapsed on both sides in an amount of 2100 m, 3) PE-NP AS PE-GG PN 1, 6 MPa 0 110 mm x 10.0 mm x 5, 000 mm flame-retardant and anti-static (without armor) all aroundErzowana on both sides in the amount of 900 mb, 4) PE-NP AS PE-GG pipe PN 1.0 MPa 0 200 mm x 11.9 mm x 5, 000 mm flame-retardant and anti-static (without armor), collided on both sides in an amount of 50 mb, 5) PE-NP AS PE-GG pipe PN 1, 6 MPa 0 110 mm x 10.0 mm x 5, 000 mm flame-retardant and anti-static (without armor) for the Victaulic type connection together with the Victaulic S / 905 0 110 mm coupling in the amount of 300 mb, 6) PE-NP AS PE pipe-GG PN 1, 6 MPa 0 90mm x 8.2 mm x 6, 000 mm flame-retardant and anti-static (without armor), flanged on both sides in an amount of 600 mb, 7) barefoot antistatic tube (without armor) in reels a / 100 mb type PE-AS SDR11 PE-GG PN 1, 6 MPa 0 63 mm x 5.8 mm in an amount of 3 800 m. 2. The Contractor will sell and provide the Ordering Party with a bellows compensator referred to in part II.1.4) of this announcement, pu DN 200 EPDM 1.0 MPa in the amount of 1 item 3. As part of the order, the Contractor will sell and deliver to the Ordering Party the assembly fittings referred to in part II.1.4) of this announcement, the following types and in the following maximum amounts: 1) PE-NP T-TRAC ASP-GG 0 90 mm x 8.2 mm 1, 6 MPa outlet 90, soldered in the amount of 15 pcs, 2) PE-NP PE-NP ASP-GG 0 200 mm x 11, 9 mm 1.0 MPa outlet 90, coluncated in the amount of 2 pcs, 3) T-track bit, PE-AS 0 63 mm x 5.8 mm, 1.6 MPa in the amount of 50 pcs, 4) PE-AS connector 0 63 mm x 5.8 mm 1.6 MPa in the amount of 40 items, 5) PE-AS connector, flanged, 0 63 mm x 5.8 mm, 1.6 MPa in 50 pieces, 6) PE-AS valve 0 63 mm 1.6 MPa in the amount of 40 items, 7) knee PE AS GG bose 90 0 63 mm x 5.8 mm 1.6 MPa in the amount of 30 pcs, 8) knee PE-NP AS GG 90 0-90 mm x 8.2 mm 1.6 MPa, flanged in an amount of 15 pcs, 9) PE-NPAS collar sleeve type PE-GG Dz 200 mm DN200 mm 1, 6 MPa thick. 11.9 mm walls (for welding) together with steel clamps covered with plastic in the amount of 5 pcs., 10) PE-NPAS collar sleeve type PE-GG Dz 180 mm DN180 mm 1, 6 MPa thick. 16.4 mm walls (for welding) with steel clamps covered with plastic in the amount of 300 pieces, 11) tPE-NPAS PE-GAZ type PE-GG type valve 140 mm DN140 mm 2, 5 MPa thick 19.2 mm walls (for welding) together with steel clamps covered with plastic in the amount of 300 pcs, 12) PE-NPAS collar sleeve type PE-GG Dz 110 mm DN110 mm 1, 6 MPa thick. walls 10.0 mm (for welding) with steel clamps covered with plastic in the amount of 200 pieces 4. The subject of the orders should meet the PN-EN 12201-2: 2012 standard-or equivalent. 5. The subject of the order referred to in part II.1.4) of this announcement will be used for the construction of pipelines transporting water and non-flammable liquids and aqueous suspensions and compressed air in shafts and underground excavations of the mining plant. Subject of the order referred to in part II.1.4) of this announcement. should: 1) meet the requirements set out in thethe Minister of Energy's ordinance of 23/11/2016 regarding detailed requirements for operating underground underground mines (Journal of Laws of 2017 item 1118), 2) allowed to be used in underground mine workings in rooms with a degree "A", "b" and "c" the danger of methane explosion. Detailed information on the subject of the order and rules of its reThe agreement is included in the ToR, which is available on the website of the Contracting Authority www.kopalniawieliczka.eu. Part VI of the ToR. According to art. 22 ust. 1b of the Act on the award of the contract may apply to Contractors who meet the conditions relating to - 1) competence or entitlement to conduct a specific professional activity, if it results from separate regulations - entry into one of the registrations professionallyin the Member State of the European Union in which the Contractor has its registered office, set out in Annex XI to Directive 2014/24 / U or meet other requirements specified in that Annex or entry to the Central Register and Information on Business; 2) economic or financial ordering does not set a specific condition in this respect; 3) ztechnical or professional capacity - documenting proper performance or performance within the last 3 years before the deadline for submitting bids, and if the period of business is shorter during this period of at least one supply of polyethylene pipes with a solid monolithic antistatic layer (without armor), flanged with clamps steel protected against corrosion-with a value of at least PLN 1, 000, 000.00 gross. Assessment of compliance by Contractors of the above the conditions for participation in the proceedings will be made on the basis of the submitted documents specified in Part VIII of the ToR. 2. The Contractor may, to confirm compliance with the conditions of participation in the proceedings, rely on the technical or professional capacity or financial or economic situation of other entities, not the legal nature of the legal relations that it has with him. In such a case, the Contractor must prove that when performing the order, he will have the necessary resources of these entities, in particular presenting with the offer the obligation of these entities to give him the necessary resources to fulfill the order. The contracting authority will request the submission of appropriate docsaccording to the provisions of - 9 of the Regulation of the Minister of Development of 26.7.2016 on the types of documents that the contracting authority may request from the contractor in the procedure for awarding the contract and documents indicated in Part VIII of the ToR, relating to entities on the capacities of the Contractor He relied. If technical or professional capacity, or economic or financial situationin the entity referred to above, do not confirm the Contractor's fulfillment of the conditions for participation in the proceedings or are subject to exclusion to those entities, the Employer requests that the Contractor, 1) replace the entity with another entity or entities or 2) undertook to personally execute the relevant part of the order, if it proves required-technical or professional capacity or financial or economic situation. 3. In the event of a change or resignation from the subcontractor referred to in point 2, the Contractor will be obliged to demonstrate to the Ordering Party that the proposed other subcontractor or Contractor independently fulfills the conditions for participation in the proceedings to the extent not less than the subcontractor, for which the Contractor's resources were invoked during the postto apply for the order. Part VII of the ToR - Basis for exclusion. 1. The Awarding Entity will exclude from the proceedings for the award of a public contract of Contractors for whom the circumstances referred to in art. 24 sec. 1 of the Act, subject to the provisions of art. 24 sec. 7 11 of the Act 2. The Employer will exclude from the proceedings for awarding public contractors, referred to in arvol. 24 para. 5 point 1 8 of the Act, subject to the provisions of art. 24 sec. 8 9 of the Act. For the purpose of preliminary confirmation of compliance with the conditions of participation in the procedure and the lack of grounds for exclusion, the Contractor is obliged to submit together with the offer a declaration submitted in the form of a single European order document. Pattern EAT is Annex 2 to the ToR. The ordering party does not set a happy one- ordering before the order is awarded, it will call the Contractor whose tender will be the highest rated, to submit within the prescribed period, not shorter than 10 days, below statements or documents (valid as at the date of submission): no grounds for exclusion: a) information from the National Criminal Register in the scope specified in art. 24 sec.1 items 13, 14 and 21 of the Act and regarding conviction for offenses to custody in the scope specified by the Employer pursuant to art. 24 sec. 5 points 5 and 6 of the Act, issued not earlier than 6 months before the deadline for submitting offers; b) certificate of the competent head of the tax office confirming that the Contractor is not in arrears with paying taxes, issued no earlier than 3before the deadline for submission of tenders, or any other document confirming that the Contractor has entered into an agreement with the competent tax authority regarding the repayment of such receivables with possible interest or fines, in particular obtained legally permissible, postponement or installment payment of overdue payments or suspension in full the implementation of the decision of the competent authority; - c)Provision of the relevant local organizational unit of the Social Insurance Institution or Agricultural Social Insurance Fund or other document confirming that the Contractor is not in arrears with paying social security or health insurance contributions, issued not earlier than 3 months before the deadline for submission of tenders, or other document confirming that the Contractor he made a dealholding with the competent authority regarding the repayment of such receivables, together with any interest or fines, in particular obtained legally permissible, postponement or payment of overdue payments or suspension of the full implementation of the decision of the competent authority; d) excerpt from the relevant register or from the Central Registry and Information on Economic Activities, if separate regulations-require an entry in the register or records in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 of the Act; e) declaration of the Contractor about the lack of issuing a final court judgment or final administrative decision on default of payment of taxes, fees or social security or health insurance premiums, or - in the event of such a decision or decision---documents confirming payment of these receivables, including possible interest or fines or conclusion of a binding agreement regarding repayment of such receivables; f) declaration of the Contractor about the lack of a ruling against him as a preventive measure of prohibition of applying for public orders; the final judgment of the court convicting you for the offensenot to impose a restriction of liberty or a fine to the extent specified by the Awarding Entity pursuant to art. 24 sec. 5 points 5 and 6 of the Act; h) a statement by the Contractor about the lack of a final administrative decision on him in breach of obligations under labor law, environmental law or social security provisions in the scope specified by the Employer forleave article 24 sec. 5 point 7 of the Act; i) Contractor's declaration on not paying taxes and local fees, referred to in the Act of 12.1.1991 on local taxes and charges; j) Contractor's declaration of affiliation with or absence of affiliation to the same capital group; in the case of affiliation to the same capital group, the Contractor may submit together with the statement-documents or information confirming that connections with another contractor do not lead to distortion of competition in the proceeding (no separate request - within 3 days). • A detailed list of statements or documents to be provided by the contractor to confirm compliance with the conditions of participation and no grounds the exclusion has been described in part VIII of the ToR. Internet address (URL): www.kopalniawieliczka.eu Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Pipes was 26 Apr 2018. Bidding is closed.
This tender has been issued by KOPALNIA SOLI „WIELICZKA" SPÓ?KA AKCYJNA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 44163100 - Pipes.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 21577088. The purchaser document reference is 117011-2018.