Expired Tender Greece ICB TOT Ref. 21200039

Contract notice: Pest-control services Tender in Greece - 21200039

Tender notice from Greece, published on 05 Mar 2018.

Executive Summary

The ?????????? ??????? ?????????? - ?.?. ??????? has issued a Tender notice for the procurement of a Contract notice: Pest-control services in the Greece. This Tender notice was published on 05 Mar 2018 and is scheduled to close on 29 Mar 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 21200039, while the tender notice number is 095013-2018 and Register on the platform.

Key facts

Summary
Contract notice: Pest-control services
TOT Ref. No.
21200039
Document Ref. No.
095013-2018
Country
Greece
Notice type
Tender
Competition
ICB
Publication date
05 Mar 2018
Bid deadline
29 Mar 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Pest-control services
Description: Contract notice: Pest-control services
Authority Type: Regional or local authority
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 90922000, 90922000
CPV Description: Integrated mosquito combat in the region of Western Macedonia for the years 2018 - 2019. The project titled includes all the required monitoring and control of the population of larvae and straw mosquitoes in the whole of the Western Region With the aim of defending public health, but also limiting theThe services provided are classified under the following CPV codes: 90922000-6.
The total budget is estimated at € 350, 000.00 including VAT for two (2) years. (€ 175.000, 00 for 2018 and € 175.000, 00 for 2019)
The estimated value of the contract amounts to € 350.000, 00 including-VAT 24% for two (2) years. (€ 175.000, 00 for 2018 and € 175.000, 00 for 2019) (Budget excluding VAT: € 282.258, 07 VAT: € 67.741, 93)
A detailed description of the nature and economic scope of the contract is given in Annex I of the 03/2018 The contract will be awarded on the basis of the most economically advantageous tender, based on an optimal price-quality ratio.1 Project Objective: The project titled includes all the required monitoring and control activities of the population of larvae and sparse mosquitoes in the Region of Western Macedonia as a whole, aiming at defending the Public Health and reducing the nuisance causing the mosquitoes
Application area:
The project will be developed in the four (4) regional(Kozani, Grevena, Kastoria and Florina), the Region of Western Macedonia. The area of implementation of the project is the urban, peri-urban and natural system of the twelve (12) Municipalities of the Region, with emphasis on the lagoon and riverside wetland systems.
The benefit of the entire population of the Region of Western Macedonia and especially the residents and visitin areas with a severe mosquito problem. In addition to reducing the nuisance for residents and at the same time improving the quality of living and living of residents in the area, the project is expected to contribute to the development of the Region, but also to the preservation of public health, against diseases such as malaria, Western Nile, dengue feveretc ..
Project size
The project includes fieldwork - sampling and spraying interventions - of about six months (6.5) months per year (typical period of execution of work in April - end of October) . The work is planned to be carried out, following an approximate assessment, at the following locations: - more than 200, 000 acres- drainage systems in the suburban, urban and natural systems.
- peri-urban system: lakes and rivers, streams, outbreaks of the agricultural system (drainage-irrigation systems) canals), waste disposal sites, sewage discharges, flooded land plots-to improve forage, lairage plant wastes, wastewater treatment facilities, flooded fallow land,
- NCR: sewer (open drainage wells, rainwater gratings), various micro-foci (potholes, tanks, troughs etc.).
The specific objectives of the project are as follows:
1) Identify, evaluate and address the main focal points ifmosquito-evacuation in the natural, peri-urban / rural environment to reduce the nuisance where necessary
2) Limitation of the presence of mosquitoes in cities and settlements 3) Installation and operation of fixed networks of entomological data and epidemiological risk monitoring 4) Preparedness and the possibility of immediate and effective treatment in case of occurrence of cr(a) a detailed record of the major mosquito breeding sites of the Region of Western Macedonia and the creation of a mosquito transmitting disease. business maps.
(b) Plant-logging - Mapping of wetlandsvisual systems and creation of business maps
2) Monitoring of larval populations through continuous periodic sampling and continuous assessment of the productivity of mosquito breeding grounds
3) Determination of surfaces for larval sprays
4) Sprayings of larvae
5) spraying.
6) Carrying of spraying sprays (mainly per(7) Monitoring of poppy populations - entomological monitoring (installation of fixed network (s)) 8) Complementary actions to address public health risks (installation and operation of fixed network (s) 9) Certification of actions and delivery of reports. 2: General Terms.
The project includes the monitoring of the Excof the population of mosquito larvae and their management through targeted interventions in the natural, peri-urban and urban system of the Municipalities of the Region of Western Macedonia
The Region of Western Macedonia has an area of 9, 451 km and 283, 689 inhabitants during the 2011 census. special care should be given to the settlements and areas of the West M Municipalitywhere the mosquitoes are severely disturbed.
Project work will be performed daily on a weekly basis. If necessary, especially in cases of public health problems, work must be performed on Saturdays, Sundays or public holidays in order to ensure the best result.
The contractor is subject to continuousof its contractual obligations by the Monitoring and Acceptance Committee and the relevant supervising department (DIY), in ways that will be selected for the proper execution of the project. The contractor should be able to provide directly any information that is required of him concerning his staff movements, daily sampling and spraying data, • Special emphasis will be placed on the implementation of actions in the event of the active occurrence of diseases related to the activity of mosquitoes as translators • The contractor will be able to propose any changes in the way the project is implemented in order to ensure effective, safe and environmentally compatible implementation of the project.Any proposed changes are submitted in writing and are judged by the Project Receiving Committee, which decides whether to accept or reject them.
I.3: Technical specifications of the individual project actions.
For the implementation of the project, the following sub-actions are required, which constitute the contractor's obligations as a whole, owed by the candidate in his technique(1) Detailed record of the major mosquito outbreaks of the Region of Western Macedonia - Creation of new business maps (designation, marking and placement in the sampling field), updating of the old ones
The contractor is obliged by assignment of the project identify, assess major mosquito breeding sites in the areathe implementation of the project, the creation and delivery of business maps to the Contracting Authority [taking into account the data of the two (2) previous years 2016-2017], in the ESA projection system 87, the accuracy of the location of the data for the peri-urban and natural environment will corresponds to a map accuracy of 1: 5000 (10m error). The accuracy of location of the data for urban environment will beaccurate to 1: 2000 (maximum error of 4m). All of the above should be delivered in an editable format from any geospatial data management system (readable by running programs).
The Contractor will define and map all sampling stations in the above backgrounds and create appropriate business charts forthen mapping of the major breeding sites should be completed immediately upon commencement of the project to the extent that it is absolutely necessary for its proper execution so that the contractor has to deliver the cartographic backgrounds of the area of application of the project with the main outbreaks of mosquito reproduction:capture and recording of wetland systems, rural and peri-urban mapping in the form of Operational charts (identification, marking and coding of sampling stations), as well as the siting of the fixed network of mosquitoes capture traps. The above must be delivered by the contractor within ten (10) days of the signing of the contract, to the Commission Bela
2) Mapping and recording of wetland systems
The contractor is required to construct the maps of the natural wetland systems of the Region of Western Macedonia. The mapping of mosquito habitats should include the identification, recording and measurement of the florid groups, -of the potential mosquito biotopes in the form of a vegetation map. Vegetation reflects the ecological conditions of each micro habitat in general and can be used as an indicator of the conditions in which female mosquitoes show preference in the egg deposit. At the same time, it acts as an indicator for both the frequency and the duration of the zones. With tIn this way, the types of vegetation are translated into danger zones, both for the frequency of mosquito egg hatching and for the density of mosquito larvae populations. 3) Business planning - Business planning involves the continuous identification of the target and priorities of the program and the hierarchy of individual actions and more specificallyto: - collect and evaluate all information related to the project (mappings, sampling results, repression applications, updates and information, workshop movements, etc.), - continuous planning of actions and management of the resources allocated human resources, logistics equipment, formulations, etc.),
- the evaluation of the results and the taking of corrections- - the communication with the local government partners, - the contractor should be able to start the project directly by assigning it, after signing the relevant contract. (4) Monitoring of larval populations and evaluation of breeding grounds.Monitoring - recording of the appearance and abundance of mosquito larvae.
Based on the mapping and detection of potential outbreaks, the contractor will perform samplings in all project execution areas in regular intervals from one (1) to two (2) weeks, depending on the nature of the outbreaks, larval productivity, proximity to inhabited areas, degree of obstructionthe extent of epidemiological risk, period, climatic data, etc.
Sampling will be carried out in the natural, peri-urban, urban and rural system of the program area.
The recording of the abundance larvae will be carried out in specially formulated protocols.
The set of samplings is recordedand are at the disposal of the auditing authorities where and when they are requested.
Hemostasis checks are carried out in the wetlands of the Region, in the peri-urban / rural system, two kilometers (2 km) around the settlements. Within the settlements, interventions will be carried out in outhouses located in public areas. The contractor should be able to collect and plarge data time recording systems to complete the assessment of the productivity of all mosquito breeding habitats in the natural and peri-urban system
5) Delimitation of surfaces for larval spraying
The result of daily samplings to be recorded in daily control records is identification and evaluation and delimitationbreeding mosquito nets, which are grouped together to prepare the spraying crew movement program. The detection of extensive production outbreaks in the agricultural system as well as in extensive areas of the natural system, demonstrates the necessity of spraying.
6) Spraying of larvae sprays
Spraying applications can be carried out directly with thelocalization of larvae or even later, depending on their severity and extent.
For the control of spray booths, the contractor is required to keep and deliver to the supervising authority in a timely manner weekly programs for the operation of the workshops. The spraying program and the total spraying area (with full reference to the individual sprayed surfaces) will be notified in advanceto the Contracting Authority, which can exercise any form of control over the contractor. The program will be delivered each Thursday to the Contracting Authority for approval or modification and afterwards, with the Contractor's care, will be communicated to the RUs. and municipalities
7) Spray effectiveness control
In case of spraying large surfaces, high difficulty (high vegetation, sewage etc.) and the sameof particular importance for the protection of public health, an effectiveness check should be carried out. Spray efficiency testing will be done by the contractor within 24 to 48 hours of their execution. In case of unsuccessful spray application, spraying is repeated immediately. Where the relevant project monitoring committeeand the Contracting Authority finds the need to apply additional sprays to certain areas of the Region, the Contractor undertakes to take immediate action to ensure that there is no problem of coniferous bumps
8) Monitoring Populations of Rapid Mosquitoes
The Contractor is obliged to monitor the population's variationof conifers in the area of application of the project throughout its duration. This monitoring shall be carried out with a sampling network using the Human Bait method or with the use of trapping traps for at least 18 positions. Collection data are recorded and are factors for decision-making and corrective actions.
9) Spraying of acnectomy
The contractor has-the obligation to have equipment and know-how to undertake U.L.V. (Ultra Low Volume) if there is a relative need to safeguard Public Health (eg the occurrence of human cases of West Nile Encephalitis virus, malaria or other diseases involving mosquitoes). Applications will be in accordance with μ(10) Supplementary actions to address public health risks
In the event of outbreaks of mosquito-related disease, the contractor shall, in the event of an outbreak of mosquito-related diseases, be required to comply with the applicable provisions and authorizations, with approved formulations and in accordance with their implementation guidelines. collaborates with the Greek stakeholders (Region of Crete, YYY, KEEL.Π.Ν.Ο. etc.) and international (ECDC, WHO, etc.), according to the instructions of the Contracting Authority's services and committees, the relevant national and European response plans and the prevailing international standards and good practices. it must modify its programs and actions with the primary objective of addressing the risks to public health and• 11) Supplementary actions for the information of services, institutions and citizens.
The Contractor is obliged to inform the Contracting Authority in due time and at least of the Regional and Municipal Authorities of the region on the firsta curriculum vitae to follow, for all the work to be performed, and any changes thereto for any reason whatsoever. The authorities will be informed by sending weekly action and crew action plans from the end of the previous week. Any program modifications resulting from a major need will be communicated as of the previous one• The Contractor is also required to have an Open Contact Line with the citizens through which the person concerned can, during the execution of the project, inform about the presence of new or non-localized outbreaks of mosquito breeding, make complaints, is informed about issues related to the project and others. Calls to be made ia will be recorded by the Contractor and will be given to the Contracting Authority at every request. The Contractor is required to meet the inclinations that indicate increased presence of mosquitoes, with presence workshop in a short time to address the problem.
12) actions Certification - Project deliverables and payments
A) Submissions during the implementation project.
- magazine weekly execution program-work reports, with a daily report of the job position, the workshop, and a brief description of the work planned to be executed. This program will be submitted every Thursday before the implementation week for approval by the Program Auditor and after approval with any amendments every Friday will be communicated both to the auditors per IP and to each- Protocols for field data separately by category, such as larval monitoring, spraying efficiency assessment, use of formulations, etc., - the contractor is required to submit to the Acceptance Committee periodic progress reports, including all the of the data of the realized project: number and detailed report of the settlements per settlement, area of application area by settlement, mapping of production points, streams, channels identified during the project, quantity of used formulations, GPS data, results of the entomological monitoring, results of epidemiological surveillance and supplements possibly indicated by the Contracting Authority and suggestions on• Monthly submission of digital data concerning: - Mapping of sampling and / or intervention sites, delimitation of new areas due to change of priorities after evaluation in the course of the project development (geometric data, coding, characterization, etc.), in the form of files recognizable by the circular-
MS Access relational database with all field analyzes collected and / or evaluated after further processing by the Contractor, which will be delivered in a format compatible with the existing relational database of the Service. of each workshop should be confirmed by GPS tracking, which will be all equippedvehicles, and satellite, by an independent operator. The operation of the workshops should be able to be monitored by the regional auditing bodies in real time throughout the execution of the project.
The contractor is responsible for the certification - the documentation of the work he / she does with any additional means he deems appropriate. In particular, project deliverables and timingThe delivery schedule of these exhibitions, which are also Deliverables of the project, are the following:
For the first year of execution of the project year 2018:
- Deliverable (P1). The set of operational maps of the peri-urban / rural system (identification, marking and coding of the sampling stations), maps of the wetland / natural systems of the Region, as well as the whole of theof the fixed network of trapped mosquito traps,
- deliverable (P2). Report of Proceedings of the first and second months from the signing of the contract,
- Deliverable (Q3). Report of Proceedings of the third and fourth months and half of the fifth month after the signing of the contract,
- to be delivered (Q4). Annual Activity Report 2018, which will include all the details• For the second year of implementation of the project year 2019:
- Deliverable (Q5). Performance Report of the first and second months from the beginning of field work,
- deliverable (P6). Progress Report of the third and fourth months from the start of the project implementation,
- Deliverable (P7). ExhibitionWorks of the fifth and sixth and half of the seventh month from the start of the project,
- Deliverable (P8). Final Report of the Project, which will be delivered after the completion of the work of 2019 and will include in detail all the data concerning the progress of the project, proposals and corrective moves for the future ..
Moreover, the contractor is obliged toto report and report on the time and content that will be indicated to him during the execution of the project, with a view to responding to special needs
For the first year of execution of the project
25% of the annual contract amount will be given on delivery and final delivery of the Deliverable P1 by the Project Acceptance Committees
25% of the annual contract amount with the delivery-and final acceptance of the Deliverable Q2 by the Project Acceptance Committees
- 25% of the annual contract amount with the delivery and final receipt of the Deliverable Q3 by the Project Acceptance Committees,
- 25% of the annual contract amount after the completion field work of the first year 2018 and the delivery and final receipt of the Deliverable Q4 DeliverableProject.
For the second year of application.
- 25% of the annual contract amount upon delivery and final acceptance of the D5 Deliverable of the acceptance committee of the project,
- 25% of the annual contract amount upon delivery and final acceptance of the P6 Delivered by the Project Acceptance Committees,
- 25% of the annual contract amount with the delivery and final receipt of the Q7provided by the Project Acceptance Committees, - 25% of the annual contract amount after the completion of the works and the delivery and final receipt of the entire project, upon receipt of the Deliverable Q8 by the Project Acceptance Committees. Payment will be in accordance with the progress of the project (time allocation of payments). For each deliverable, the payment ratio will be25% of the annual contract amount.
The payment of the value of the project to be awarded will be made by presenting the legal documents and supporting documents provided by the provisions in force as well as any other documents which may have been requested by the competent departments carrying out the control and payment.
Duration of the projectof the contract, by the contractor until 31.12.2019 completing the work with the submission of the Final Report of its activities
Extension of the timetable The Contracting Authority may request the extension of the implementation of the program without the modification of the physical object referred to in this notice, due to climatic conditions, which may favor the development ofmosquito larvae and for other reasons of its own responsibility and choice, provided that the respective decisions of the competent committees and the collective bodies exist. Concession Obligations
1) Mapping
The contractor must identify the major mosquito breeding sites in the natural, peri-urban and urban system of the Western Region-2) Applications to wetland physical systems
- after the completion and delivery of the operational maps of the peri-urban and natural system, the contractor must monitor by larval sampling the population growth in the area of rural and natural systems. wetland systems of Western Macedonia one to two-weeks. (14), - the total number of mosquito nurseries mapped out in the periurban and natural system (control stations) over the past two (2) years was over 2, 500; - if mosquito larvae are detected in wetlands and periodically flooded areasthe contractor is required to spray applications depending on the extent, location and accessibility of the outbreak, taking into account the environmental impact of the application; - sampling will be recorded in protocols or electronically, indicating the genus larvae, population density and development stage per control station and date(3) Applications in peri-urban - rural-urban environment
- Preventive control and applications will take place in the peri-urban and structured system in more than 360 settlements of the twelve (12) Municipalities of the Region of Western Macedonia, settlements displaying tourist development, settlements organizing cultural events, in the vicinity of wetland systems and particularly settlements where public health problems related to mosquito activity may arise; - the grubbing-up controls and applications in the peri-urban system will be carried out at intervals of one (1) to four (4), depending on the nature and extent of the outbreaks and the entomological and epidemiological factors-data. The applications will be programmed and will be announced to the Managing Authority, which will be able to impose the changes it deems necessary; - Every control / application in the peri-urban system will include control of all suburban stations in the radius of two 2) kilometers from the settlement and spraying the fireplaces where they will be foundmosquitoes of mosquitoes. Also, the major mosquito breeding sites in public public areas of the settlements will be controlled The total number of suburban - urban sampling systems to be monitored is estimated at 2, 600 stations
4) Applications in cities
The contractor is required to conduct control and application tours at wells of its surrounding townsSpecial emphasis will be placed on wells and other point outlets within a radius of 100 m around Nursing Institutions, squares and leisure parks, nursing homes, CAMP, cemeteries, archaeological sites, shopping centers and venues .
The wells reported last year (2017) are more than 9, 000.
5) Incidental actions - Acupuncture actions
In the event of an outbreakin the case of outbreaks of diseases the transmission of which involves mosquito species, the contractor is required to: - carry out a direct in-depth inspection around the place of residence of the case. The audit will include the identification of point mosquito breeding sites and grubbing operations in them, as well as the identification of resting places for acne to carry out spraying interventionsconstancy. These actions will be carried out under the supervision of the Managing Authority and the implemented applications will refer to it, - to make ULV UMV UMV applications, in time and in positions specified by the Managing Authority, - to cooperate with public bodies involved in solving the issue and following instructions.
Before the eventand given the increased likelihood of outbreaks of malaria, the contractor should identify critical locations for the possible implementation of residual accelerator applications near the accommodation and living quarters of people from malaria endemic countries. Applications will be performed at the direction of the Health Division.
6) Samples of Acne
The Contractor-it is obliged to monitor the fluctuation of the population of hake in the project area throughout its duration. This monitoring shall be carried out with a sampling network using the Human Bait method or with the use of trapping traps for at least 18 positions. Collection data are recorded and are factors for decision making; and dmanagement actions. The results of the above actions will be communicated to the Managing Authority immediately after their completion.
7) Information actions
The contractor will help to inform the Services. In particular, it is foreseen:
1) Informative meetings per Regional Unit or Municipalities, whenever requested.
2) Telephone line service free of charge to the public for recording-complaints and informing residents about the progress of the project. In case of reporting problems, the contractor is obliged to record and check the problem in the near future within a maximum of 36 hours.
8) Documentation
The Contractor is responsible for certifying and documenting his actions. Specifically, you should:
1) Submit timely weekly programs, (3) Provide the ability to electronically control the movement of workshops in real time (fleet traffic control using GPS) and the possibility of direct contact of the operators of the Contracting Authority with the participating employees. 4) Record all information in protocols-(sampling and spraying) project.
General obligations.
The contractor must have the means and human resources, which are envisaged as the minimum desirable in the declaration. Moreover, given that project intensity varies and is determined by factors that can not be foreseen, the contractor should be able to allocate additional resources to the project.the implementation of the project in order to meet particular and important needs. Its ability and the commitment to allocate additional resources should be stated in its offer. The Managing Authority will be able to quantify the above-mentioned actions by varying the individual actions according to the entomological and epidemiological data and theweather conditions prevailing per period. The contractor shall follow any changes he / she has made in the project, increasing accordingly the foreseen actions referred to herein. Personnel - Hardware - Preparations.
The following sections form a single set of conditions in order to perform the project successfully. Unfulfilledeven one of them, is a ground for refusing a candidate: The minimum required personnel for the execution of the project is as follows:
A.1) Scientific Staff - Project Scientific Team.
For the execution of the whole project, the candidate Contractor shall have at least the following personnel:
Scientific a group of at least two (2) scientists (Agronomists, BiChemists, Public Health Supervisors or other related specialists, WHO or TE) with a proven experience of participating in mosquito control projects. Those who do not apply for a diploma and license to practice where required, are subject to exclusion. The scientific team, in addition to organizing and coordinating the day-to-day operations of workshops, sampling and sprayingis responsible for the implementation of all supporting tasks (mapping of outbreaks, identification of larvae and acarids, production of deliverables, etc.). It is also responsible for the legality, security and environmental compatibility of applications and the management of crises and emergencies associated with the project.
The Scientific Staff will be under the supervision of the paperwriting and updating outbreaks, sampling, placing trapping traps and transporting them for identification by appropriate scientific staff. It should monitor the progress of applications, their effectiveness, by checking the technical staff. All staff should be present in the area throughout the execution of the projectth. The scientific staff will be competent and responsible for the writing of the project deliverables.
The scientific staff should inform the members of the Project Acceptance Committee about the progress of the implementation of the project and the problems that arise either verbally or in writing, whenever required, as well as the Contracting Authority.
The contractor's scientific team, It must have the knowledge and experience to: - record, delineate and map out all breeding sites within the scope of the project, - prepare the ecological mapping of the physical system if necessary, - prepare the application plan of the project and to adapt it to its needs, depending on the development of the project, the climateconditions and any external factors involved in the development of mosquito populations, - educate and supervise the technical staff on sampling and spraying methods, - check the effectiveness of the project and make the necessary corrective actions, - write - draws up the project deliverables; - the overall responsibility for the implementation of the projectIt is expressly stated that an offer which does not include chief scientists with documented professional experience in similar projects as defined herein is considered as not covering the project implementation needs and is rejected at the stage of the examination of the technical offers .
A.2 Technical Staff
Consisting of ten (10) technical samplers --sprays, etc., with knowledge of larval identification, gender density, population density assessment and proper use of insecticidal preparations. By submitting attestations or documents proving their relevant training and experience in the subject.
Β) Hardware - The contractor of the project must provide (on penalty of exclusion) all the necessary logistic equipment-required for the successful execution of the project and in particular: - Responsible declaration of the candidate, including a detailed statement of the logistic equipment to be used by the candidate during the implementation of the project. The logistical equipment to be declared should be available throughout the execution of the project in its area of performance. The minimum-Required equipment should include:
1) Five (5) open-end commercial vehicles licensed for spraying applications. Vehicles will carry a water tank and a high-pressure sprinkler to perform the spray sampling. Spray vehicles will be equipped with a GPS tracking system. Sprayers shouldare licensed to perform spraying applications of insecticide. One of these will cover emergencies to stop the phenomenon of frequent program changes (stand by).
2) Two (2) passenger vehicles for scientific movements, sampling and spraying controls. (3) A super low volume on-board cloud (ULV), heavy-duty type for terrestrial sprays of ultra-small volume acneicide. 4) Five (5) digital GPS systems capable of real-time recording of real-time vehicle traffic. Proof of ownership or rights of use included in monitoring systems fIt is expressly stated that a tender which does not include the above mentioned as absolutely required means is considered as not covering the project implementation needs and is rejected at the stage of the examination of the technical tenders .. In addition to the above highly desirable and desirable means, are considered to be: - a floating craft or amphibious vehicle, for approaching water volumes of sufficient depth(lakes, stagnant waters, natural soil cavities) and to approach areas characterized as inaccessible so that applications can be carried out in these areas, - vehicles more than requested, - field monitoring system, - specialized back-up sprays - handheld, - specialized on-board sprinklers, - use of GIS programs for the production of thematic-(eg frequency and spraying maps, epidemiological risk maps, etc.) depending on the needs being developed.
Any other means - systems that the candidate contractor proposes and can justify their usefulness to the project (data analysis systems).
2) In the event of an infectious disease occurring and following the issue of relevant instructions and approvals by competent authoritiesIn principle, there may be a need to make acmeicide sprays with ultra-small volume (ULV) and / or residual sprays in selected settlements in the area. The Contractor should be able to support scientifically and technically relevant applications and execute them within 24 hours if requested. These interventions will be done only after the publication-of relevant permits by the competent National Authorities and their authorized preparations, while preserving to the maximum extent the environmental compatibility of applications and the safety of people and non-target organisms.3) In particular, to prove the above, certificates, attestations, licenses, ability to perform for the intended work, as well as any other in the crownequal to the tenderer's proof. Regarding vehicles, there must be a license for legal circulation and use. The Contractor undertakes to purchase and use all the required formulations for the successful execution of the project. The formulations will be approved by the competent National Authorities. Their use will be in accordance withinstructions for the use of the preparation as defined by the manufacturer in conjunction with the relevant approval by the competent Ministry. Specifically, approved biocidal products for use in mosquito control applications should be approved by the competent departments of the Ministry of Rural Development and Food and the Ministry of Health and to have the certificates in placeaccording to KYA. of the Ministry of Rural Developmentapplication of spray liquid with full safety equipment (mask, mold, gloves, etc.)
Special care will be given to the protection of residents. The Contractor should inform the residents of the area planned to be sprayed, as well as any interested person, in an appropriate manner and in good time through the Municipalities, in order to protect both the people and the animalsCommunity. Particular care should be taken to cooperate with environmental wetland management bodies to protect the environment in vulnerable areas.
The management of insecticide residues after spraying is the responsibility and obligation of the contractor
The overall management of formulations and their packaging, ie the supply, transport and storage of themand the Contracting Authority may, at its discretion, carry out checks on the suitability of the formulations.
The letters of guarantee in paragraphs 2.2.2 and 4.1 of the Declaration are issued by credit institutions operating legally in the Member States of the Union or the European Economic Area or in the Member States -parts of the GPA and have this right in accordance with the applicable provisions. They can also be issued by the ETAA. - TEME or be provided with a depository and Loan Fund bill, with a deposit of the respective amount of money. If a Depositary Depositary Depositary Deposits is deposited with the Deposits and Loans Fund, the coupons or the Derivative DividendsThe guarantee letters are issued at the option of the economic operators by one or more of the issuers referred to in the above paragraph
These guarantees shall include as a minimum the following elements (a) the date of issue; (b) the issuer; (c) the contracting authority to which it is addressed; (d)-the guarantee number; (e) the amount covered by the guarantee; (f) the full name; and the address of the economic operator in favor of whom the guarantee is issued (in the case of a union, all the above for each member of the association shall be indicated); (g) the condition that: (aa) the guarantee is irrevocably and unconditionally granted; and the issuer waives the right to divide and of dissolution; and b(b) that, in the event of such a denial, the amount of the deduction shall be subject to the stamp duty in force at that time; (h) the details of the relevant contract notice and the closing date for the submission of tenders; (i) the date of expiry or the period of validity of the guarantee; by the issuer of the guarantee to pay the amount of the guarantee in whole or in part within five (5) days after a simple documentnotification of the person to whom it is addressed and (k) in the case of performance and advance payment guarantees, the number and title of the contract in question
The contracting authority shall contact the issuers of the letters of guarantee in order to establish their validity. Participation Guarantee
2.2.2.1) For the valid participation in the process of concluding this contract, by the participating economic operators (tenderers), a guarantee letter of participation, amounting to € 5, 645.16. In the case of an association of economic operators, the participation guarantee also includes the condition that the guarantee covers the obligations of all the economic operators involved in the association.
The participation guarantee must be valid for at least 30 days after the end of the termof the tender in Article 2.4.5 of the invitation to tender, otherwise the tender is rejected. The contracting authority may, before the expiry of the tender, ask the tenderer to extend before the end of the tender, the duration of the tender and the participation guarantee.
2.2.2.2) The guarantee of participation shall be returned to the contractor upon presentation of the performance guarantee .
The participation guarantee is returnedto the other tenderers, in accordance with the provisions of Article 72 of Law 4412/2016.
2.2.2.3) The guarantee for participation shall be forfeited if the offeror withdraws his tender during this period of validity, provides false information or information referred to in Articles 2.2.3 to 2.2.8 (to be completed accordingly by AA with reference to exclusion reasons and qualitative selection criteriawhich it will specify in the declaration), does not provide the documents provided for in this document in due time or does not come in due time for signing the contract ..
Execution Guarantee
The signing of the contract requires the performance of a performance guarantee in accordance with Article 72 1 (b) of Law 4412/2016, amounting to 5% of the value of the contract, excluding VAT, andbefore or during the signing of the contract.
The performance guarantee, in order to be accepted, must include at least the conditions mentioned in paragraph 2.1.5. and the number and title of the relevant contract and in accordance with Article 72 (4) of Law 4412/2016.
The performance guarantee for the contract covers in total and non-discriminatory terms, the applicationof all the terms of the contract and any claim by the contracting authority to the contractor, including an equivalent amount to that advance.
In the event of a modification of the contract under paragraph 4.5, which entails an increase in the contract value, the contractor is obliged to deposit before the supplementary guarantee, amounting to 5% onthe amount of the increase, excluding VAT.
The performance guarantee shall be forfeited in case of violation of the terms of the contract, as defined specifically.
The performance bond is refunded in full after the final quantitative and qualitative acceptance of the contract scope. If the final qualitative and quantitative receipt protocol contains observations or an overdue delivery, the-the repayment of the above guarantees is made after the observations and delays have been dealt with.
This contract is financed by the Public Investment Program, which includes the project entitled: 2016ΕΠ5410002 της ΣΑΕΠ 541
2.2.3) Reasons for exclusion
Excluded from participation in the present contract award procedure (tendering), economic tenderer(if it is an individual natural or legal person) or one of its members (in the case of an association of economic operators), one or more of the following reasons:
2.2.3.1) Where there is a of the irrevocable conviction for one of the following reasons: (a) participation in a criminal organization as defined in Article 2 of the decision;Council Framework Decision 2008/841 / JHA of 24 October 2008 on the fight against organized crime (OJ L 300, 11.11.2008, p.42); b) bribery as defined in Article 3 of the Convention on the fight against corruption (OJ C 195, 25.6.1997, p. 1) and in Article 2 (1) of the Staff Regulations of Officials of the European Communities, Council Framework Decision 2003/568 / JHA of 22 July 2003 on combating corruption in the private sector (OJ L 192, 31.7.2003, p. 54) and as defined in the applicable legislation or the national law of the economic operator. (c) fraud within the meaning of Article 1 of the Convention on the protection of the European Communities' financial interests (OJ C 316, 27.11.1995, p.(d) terrorist offenses or terrorist offenses as defined in Articles 1 and 3 of Council Framework Decision 2002/475 / JHA respectively, as amended by Law No 2803/2000 (A48). Council of 13 June 2002 on combating terrorism (OJ L 164, 22.6.2002, p. 3) or instigation or synergy or attempt to commit a crime as defined inArticle 4 of this Directive; (e) money laundering or terrorist financing as defined in Article 1 of Directive 2005/60 / EC of the European Parliament and of the Council of 26 October 2005 on the prevention of the use of the financial system system for money laundering and terrorist financing(F) child labor and other forms of trafficking in human beings as defined in Article 2 of the Convention on the Rights of the Child (OJ L 309, 25.11.2005, p.15), which was incorporated into the national legislation by Law 3691/2008 (A 166). Directive 2011/36 / EU of the European Parliament and of the Council of 5 April 2011 on preventing and combating trafficking in human beings and protecting its victimsAmending Council Framework Decision 2002/629 / JHA (OJ L 101, 15.4.2011, p. 1), which has been incorporated into national law by Law 4198/2013 (A 215)
The economic operator is excluded also when the person against whom a final irrevocable conviction has been finally enforced is a member of his administrative, managerial or supervisory body or has a power of representation, controlling or controlling it.
In the case of Limited Liability Companies (LLCs) and personal companies (OE and EU) and IECs. The obligation under the preceding paragraph concerns at least the managers.
In the case of public limited companies (SA), the obligation under the previous paragraph concerns at least the Managing Director, as well as all themembers of the Board of Directors
In the case of Cooperatives, the obligation of the preceding paragraph concerns the members of the Board of Directors
In all other cases of legal persons, the obligation of the preceding paragraphs concerns their legal representatives
If in the above cases a) to (f) the exclusion period has not been determined by an irrevocable decision(a) where the tenderer has breached his obligations regarding the payment of taxes or social security contributions, and this has been ascertained by judicial or administrative decision with final and binding force, in accordance with the provisions of the country in which it is established or the national(b) where the contracting authority can demonstrate by appropriate means that the tenderer has breached his obligations regarding the payment of taxes or social security contributions.
If the tenderer is a Greek citizen or has his / her place in the Greece, its obligations relating to social security contributions cover both the principal and the supplementary insurance.
It is not excluded that the economic operator, when he has fulfilled his obligations, by paying the taxes or social security contributions due, including, where appropriate, accrued interest or fines, whether subject to a binding settlement for their payment and / and (c) the Contracting Authority knows or can demonstrate by appropriate means that it has(aa) three (3) fines imposed by the competent bodies of the Labor Inspectorate for violations of labor law (2) before the deadline for the submission of a bid, according to Ministerial Decree 2063 / D1632 / 2011 (B 266), as currently in force, as(b) two (2) fines by the competent Audit Institutions of the Labor Inspection Body for labor offenses related to undeclared work, which arise cumulatively from two (2) (2) audits carried out. The sanctions under aaa and bb must have become finaland binding force.
2.2.3.3) It is excluded from participating in the process of concluding this contract, an economic operator offering in any of the following situations:
(a) if it has breached the obligations set forth in paragraph 2 of Article 18 of Law no. 4412/2016.
(B) if it is bankrupt or has been the subject of a reorganization or special liquidation procedure or is being administered-by a liquidator or by the court, or has been subject to bankruptcy or has suspended business activities, or is in any analogous situation arising from a similar procedure provided for in national law. The contracting authority may not exclude an economic operator who is in one of the situations referred to in pointprovided that it proves that the entity in question is in a position to perform the contract, taking into account the provisions in force and the measures for the continuation of its business operation; (c) there are reasonable grounds for concluding that the economic operator has entered into agreements with other economic operators with a view to distorting competition(d) if a situation of conflict of interest within the meaning of Article 24 of Law 4412/2016 can not be effectively remedied by other, less intrusive, means. (e) if a distortion of competition is brought about by the economic operator's earlier involvement preparation of the contract award procedure, as provided for in Article 48 of Law 4412/2016, can not be(f) if it has demonstrated a serious or repeated breach in the execution of an essential claim under a prior public contract, a prior agreement with a contracting entity or a prior concession contract resulting in the early termination of the earlier contract, indemnities or other similar sanctions. (g) if found guilty of serious criminal offensesin providing the information necessary to verify the absence of grounds for exclusion or the fulfillment of the selection criteria, has concealed such information or is unable to provide the supporting documents required pursuant to Article 2.2.9.2 of this . (h) if it has attempted to unfairly influence the contracting authority's decision-making processas a matter of principle, obtain confidential information which may give him an undue advantage in the contract award procedure or misleadingly misleading information likely to have a material effect on decisions concerning exclusion, selection or award; (i) if he has committed a serious professional misconduct, which casts doubt on his integrity, for him(a) to (h) the exclusion period has not been determined by an irrevocable decision, it shall be three (3) years in the case of a person who has been convicted of an offense, years from the date of the relevant event.
The contracting authority may not exclude an economic operator, who is in one of the situations referred to in subparagraph (b) of paragraph 4, provided that it is proved that the said entity is in a position to perform the contract, taking into account the applicable provisions and the measures for the continuation of its business operation
2.2.3.4) The bidder is excluded at any time during the process of concluding the contractif it proves that it is in one of the aforementioned cases, due to its acts or omissions, either before or during the proceedings. 2.2.3.5) The bidder is excluded at any time during the process of concluding this contract, where it is established that he is, owing to his acts or omissions, either before or during the proceedings, in one ofω cases
2.2.3.6) Tenderer economic operator falling under one of the situations referred to in paragraphs 2.2.3.1, 2.2.3.2. (c) and 2.2.3.3 may provide evidence to show that the measures taken are sufficient to demonstrate its credibility, even if the relative reason for exclusion (self-cleansing) is met. If the data is judged to be sufficient, not excluded from the contract award procedure. Measures taken by economic operators shall be assessed in the light of the seriousness and particular circumstances of the criminal offense or misconduct. If the measures are considered inadequate, the economic operator shall be informed of the reasons for the decision. An economic operator which has been excluded, in accordance with the provisions in forceby a final decision, at national level, from participation in procurement or concession procedures can not make use of this possibility during the exclusion period specified in that decision.
2.2.3.7) The decision to ascertain the adequacy or otherwise of the remedies under the preceding paragraph shall be issued in accordance with paragraphs 8 and-9 of article 73 of Law 4412/2016.
2.2.3.8) An economic operator which has been imposed by the joint ministerial decision of article 74 of law 4412/2016, the penalty of exclusion is also automatically ruled out by this procedure ➢ 2.2.4) Suitability of professional activity
The economic operators involved in the process of concluding the contractcontract is required to engage in commercial, industrial or craft activity related to the subject of supply. Economic operators established in a Member State of the European Union are required to be registered in one of the professional or trade registers kept in their State of establishment or to satisfy any other requirement set out in AnnexAnnex XI of Appendix A to Law 4412/2016. In the case of economic operators established in a Member State of the European Economic Area (EEA) or in third countries which have acceded to the GPA or to third countries not covered by the preceding indent and have concluded bilateral or multilateral agreements with the Union, in terms of procurement procedures, is required to be-registered in corresponding business or commercial registers. The economic operators established in Greece are required to be registered with the Chamber of Craftsmen or the Chamber of Commerce or Industry or the Register of Manufacturers of Defense Materials.
They must also be licensed to control rodents and insects in residential areas of the Ministry of Rural Development and Food.must have proven experience, knowledge, competence and the necessary scientific and technical staff and technical equipment for the organization and implementation of the contract.
Internet address (URL): www.pdm.gov.gr
Directive: Classical Directive (2004/18/EC)

Documents

Tender Notice
Login to view

Similar tenders

Greece Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Pest-control services was 29 Mar 2018. Bidding is closed.

This tender has been issued by ?????????? ??????? ?????????? - ?.?. ??????? in Greece.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 90922000 - Pest-control services.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 21200039. The purchaser document reference is 095013-2018.

See the Similar Tenders section on this page or browse other tenders from Greece.

This tender falls under Construction and Real Estate in Greece. Suppliers in these sectors can track similar Greece tenders using CPV-based alerts.