ELI-HU NONPROFIT KFT. has floated a tender for Contract notice: Optical aids. The project location is Hungary and the tender is closing on 06 Dec 2018. The tender notice number is 481725-2018, while the TOT Ref Number is 28165548. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Optical aids

Deadline : 06 Dec 2018

Other Information

Notice Type : Tender

TOT Ref.No.: 28165548

Document Ref. No. : 481725-2018

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : ELI-HU NONPROFIT KFT.
Office Name: ELI-HU Nonprofit Kft.
Address: Dugonics tér 13.
Town: Szeged
Postal Code: 6720
Contact Point: Dr. Herczeg Ágnes Anna

Phone: +36 303591677
Fax: +36 62550191
Hungary
Email :kozbeszerzes@eli-alps.hu
URL :http://www.eli-alps.hu

Tender Details

Object of the contract
Optical aids

Description: Contract notice: Optical aids

Authority Type: Body governed by public law
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: Lowest price
CPV code: 38624000, 38624000, 38624000
CPV Description: Optical aids

Tap bodies for SYLOS GHHG secondary bulb

Reference Number: EKR000745022018

Procurement of electronic components and accessories for the researcher of the research equipment of the SYLOS GHHG secondary bulletins in 4 cases

Main Site: 6728 Szeged, Budapest ut 5.

systems for up-to-date information, complete

8 Amplifier (8 Channel Fast Timer for Signal Fix, Strong: 55x)

2 Electronic Diszkriminators [8 channels, inactive time in the most popular events: max. 10 ns (eg MCP signal)]

2 Fast / Slow NIM logical formatting (8 to 8 channels for fast NIM TTL and TTL NIM multipoint signals, 700 MHz)

1 HF signal disconnected [Detector side MHV (optional SHV), HF signal output for lemo00 connection / 0-200Ω closed]

1 time / digital signal atmel (1 2 input 10 GHz TOF Multiscaler, 100ps res., 1 GB 1 x Mini rack slot [VME 64 Mini-rack slot, 8-bit, 19 "x 4U storage capacity]

1 x Time / Digital Signal Atomic (21 bit-1 PCI CONET Controller Optical Charger (PC Controller on A2818 / A3818 Optical Controller) - 1 PCI Optical Controller (PCI Controller A2818 / A3818 Optical Controller PCIe x8 (A3818)]

1 db Stereo amplifier [Unselected:

1.5 GHz (-3dB) Stronghold range: 18 dB to 54 dB]

1 pre-amplifier [Discrepancy frequency: 1.6 GHz, Strong: 26dB]

The detailed technical parameters are included in the technical specifications that can be delivered in the EDF. The Provider accepts a one-time pre-season with the purchase of a co-branded item.

In this policy, no economic operator may be eligible, subcontracted or credited by any economic operator against whom the Kbt. Article 62 (1) to (2)of the exclusionary reasons contained in this section. Article 74 (1) of the Statute shall exclude from the commemorative the time-maker, the sub-contractor or the eligible organization that is in charge of the exclusionary grounds; or the reason for the exclusion is the same as in the previous paragraph. Article 64 (1) and (2) of the ConstitutionAzas POSSIBILITY formalities



The bidder the grounds for refusal not there a Government Decree 321/2015 (forward.: Decree)... (X.30.) - 1 (1) - (5) and ( 7) Section 2 (1) and (4) of section 3, Section 4 (1), (3) and (4), 6-8. must be in accordance with - - 10-i, and in the 12-16.--ai certify that purpose:

- the Decree - 1 (1) of the paragraph on the basis of all bidders.when applying for a period of time, Section II of the Government Decree. In the case of the one-off European Case Law Document, you must certify in advance that there are no grounds for exclusion,

- then the Kbt. In accordance with Article 69 (4) of the Criminal Procedure Code, the time-consuming felony of the applicant for the exclusionary reasons does not coincide with the provisions of Sections 8 and 10 of the Government Decreeyou must make representations or confirmations. Attorneys call attention to the Kb. (5) - (7) and (9) - (11), (13) - (14), and further to 424/2017. (2) of Section 12 of the Government Decree (XII.19.) Of the Government of the Republic of Croatia (hereinafter referred to as "the Decree"). If it is timeit is desirable to comply with the requirements of a suitable body or body of persons, all of which shall be subject to a simultaneous and subdivided consultation of each of the organizations or persons concerned, a single European bidding document as well. . According to the paragraph, it must be annexed to the EDF-offer. The licensee does not apply Section 2 (2) of the Government Decree. (4) of Section 67 para. (4) shall declare on the date that he or she does not apply to the Contractor's Complainant. (1) and (2) of - 62.

The timekeeper must also state whether he is in the process of being in the processthe alternative record entry. In the case of a current version of the filing file, the submitter is required to enclose the filing note filed with the filing office and the certificate filed from the filing of the bond with the bond. - 13]. It is also possible to declare inadmissible content in the process of in-process registration.

For the exclusionary reasons, the coerciveas well as the validity of the certificate and the data contained in the verdicts (Korm. (1) (7) of the Regulation.

P / 1-P / 3. A 321/2015. (1) and Section 5 (1) of the Government Decree (hereinafter: the Government Decree) (hereinafter: the Government Decree), the applicant shall attach, at the time, a single Europeana document that is sufficient for the IV. (2) (5) of the Korm. Ordinance accepts the simple declaration by the distinguished economic operator of the P / 1-P / 3 of the Pentium-Penzuy subject-specific test method (1) (i) of the Kbt., and Section 73 (1) of the Kbt.k. (c) of - 1 of the Government Decree on the basis of the Kbt. (4) - (7) of Section 69 of the Civil Code, as referred to in Annex IV to the Government Decree, The chapters must be able to demonstrate that they comply with the appropriate test conditions, as follows:

P / 1. In accordance with Section 19 (1) of the Government Decree, (c) of the Law on the basis of the date on which the applicant has lodged a complaint before the day before the end of the day, at the end of the business day in question, must have attached a statement to the court in the case of a full sum of money, if this information is availablethis time.

P / 2. According to Article 19 (1) (c) of the Korm. Ordinance, the last time before the day before the deadline, the deadline for closing the deadline was the purchase price of the co-purchaser (all items related to the manufacture and / or control of electronic components) ) from the Sarmatian arbeveteryou must attach it to the U.S. Auditor's Office, as a matter of urgency, when the time has come when it is time for the letter or when it started to work if this information is available. According to Article 19 (1) (b) of the Korm. Ordinance, the predecessor or predecessor of the Order is the last one prior to the day's notice, (if the law of the country where the owner of the economic operator is established) • If I am interested in the directory of the coginformation service, the details of the accounts are verified by the provider, in this case you can find the website of the ceginformation service

If the law of the country of the country where the resident is established does not impose a referral, then the renter must declare the last last few weeks before the last day of the meeting, if the deadline is P / 3. it does not have the document in question, because it started the artificial year after the prescribed period, -(all items related to the manufacture and / or supply of electronic instruments) can be justified by a declarations by a colleague in the field of electrical engineering.

The installer will be able to draw attention to Section 19 (3) of the Government Decree ). Appropriate proof of the economic and pension benefits vfurther information can be obtained from (6) - (8) and (11) of Section 65 of the Kbt. (9) of - 140 and Section 3 (2) and Section 6 of the Government Decree. This is the case for the EDF. Section 12 para. (2).

If the qualification of the eligible body meets the requirements of the organization, in the light of the provisions of the law, the same modus as the verifiable modalities of the provider shall demonstrate to the appropriate endorsement of the relevant qualification [Kbt. Article 67 (3)].

1. The timeframe for the breach of the law is 424/2017. (EKR), issued by the Ministry of Economy and Finance (XII.19.), And by the Ministry of Foreign Affairs (EKR)announces it. In view of this, the forecasts should be presented in the EDF, taking into account the EDF. (1) of - 2. The downloader gives the file format below which should be used to read the terms: read and non-editable pdf format.

2. The editor reminds us of the fact that he has access to the EDF, to the right of the authorized person, Paragraph 6 (1)].

3. The developer reminds the time-watchers that attention has to be paid to the EDF. (1) to (3) of - 10. Suitability of the suitability of the suitcaster and the justification for the exclusionary grounds for theEKRr. Section 12 (2) may also be based on the grounds. The sponsor of the EDR is the corresponding member of the EDR in respect of the electronically issued declaration in the EDF and the right to vote for the complainants. Section 13 is the basis for examination.

6. The Provider is not responsible for the performance of the Contractor's business (Koezoes) business plan (project portfolio) and does notso that the winner (s) timer (s) will be available, and the timer will not allow for a more advanced (alternative) timing. The terms and conditions of the qualification and the proof of the certificate of the qualified timers are more strictly applied to the limitations of the time. III.1.2) P / 1.-P / 3. III.1.3) M / 1.-M / 4. point 8. The fancier remembers thatthe Kbt. Section 81 (4) to (5) apply. The application must be accompanied by the applicant's Kbt. Article 66 (2) and (6) of the Declaration. A non-content statement must also be submitted. For those who are spending time in the EDF. Section 20 para. (4) of the basic Regulation does not have to give a ruling on the Kb. From Paragraph 66 (4)

10. The Kbt. Article 68 (4), paraa properly read-out reading room, taking into account the fact that the EDR. Article 11 (1) of the Statute, the form provided for in the EDF shall be accompanied by an explanatory memorandum. If any document attached to this document is not in a language other than Hungarian, then a non-Hungarian language translator must submit a subordinate Hungarian translation.-The application is for the Kbt. Article 134 (5) provides that time-takers must make a statement on time that, in the event of a request for advance payment by the advance payment payer in the time-guest and in the deadline specified in the contract documents, The Provider is using the present Procurement Practicefor and Kbt. Section (2) (e) of Section 75.

14. The accredited accreditation body involved in the co-procurement procedure is dr. Dr. Registered by Aron Laszlo: 00990 and dr. Hercegeg Agnes Registered: 00116.

15. The appropriate date must be attached to the appropriately framed tabulation and it should be stated that the rooms that have been received are exclusiveand never used rooms, which is in all respects compliant with the technical description. In the period of time, the actual product type and the place of production must be indicated for each period in question.
Internet address (URL): http://www.eli-alps.hu

Documents

 Tender Notice