Object of the contractNew activated carbon
Description: Contract notice: New activated carbon
Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 24954100, 24954000, 24954100, 24954100, 24954000
CPV Description: New Activated Carbon
Activated Carbon
Acquisition of Activated Carbon 2020.
Reference Number: EKR001551312019
186 m3 New Activated Carbon for Acquisition, Delivery, Production, and Use of Activated Carbon
Main Site: KFCS Top, 4060 Balmazujvara; Land plot, Mr. 0143 / 11.
186m3 (3 * 62 m3) in ivovPurchase, delivery, production and disposal of used activated charcoal (Iodine min. 950 mg / g) in 3 filter pools. 53 (5), it shall conditionally trigger: The time limit for bidding would be ineffective if the time limit for offering time expires would be subject to any legalon the European Union or Hungary Territory, which limits the supply to the country of Hungary. The Kbt. A suspension clause in accordance with Article 135 (12) shall be subject to the same conditions in the draft contract. 62. - (1) - (2) withoutany of the exclusionary reasons defined in its beginnings persist. The adjudicator shall exclude from the procedure the tenderer, the subcontractor or the organization, which has been certified by the suitability, against which the disqualifying reason has occurred during the procedure. Bidder, economic operator receiving the certificate of suitability as per the Act No. 321/2015. (X. 30.) KormBy submitting a European Co-Procurement Document, you will be required to pre-certify the Kbt. Section 62 excludes grounds for failure. Dedication draws attention to 321/2015. (X. 30.) Government Decree 1-16. --on. No. 321/2015. (X. 30.) on the basis of Article 15 of the Government Decree, the tenderer shall, in respect of the subcontractor or other organization certifying his suitability, only thedocument to the above mentioned Kbt. Section 62 exclusions for lack of justification for failure. Giving Certificates to Invited Economic Operators (X. 30.) Government Decrees 8, 10, 12-14. And Article 16 of the Kbt. Section 62 (1) para. Point (k) (k) regarding the offeror shall refer to Section LIII.to submit a statement containing a description of the names and permanent residences of each owner, as defined in Section 3 (38) (a) to (b) or (d) of the Permit (hereinafter: Pmt.); if the economic operator does not have a Pmt. Section 3 (38) (a) to (b) or (d), the owner of the property, a statement to that effect shall be attached. Those sub-subjects in his viewwhich do not take the certificate of suitability of the offeror of the Kbt. Declaration pursuant to Article 67 para. No. 321/2015. (X. 30.) on the basis of Article III. The means of proof referred to in Chapter V may be pronounced in accordance with Chapter V if the economic operator in question proves to be on the list of qualified tenderersit satisfies the requirements of the co-procurement procedure. Excluding causes justify scrutiny by keeping them competent in dogs. First dog based on EEKD document, second dog according to 321/2015. (X.30.) Korm.R. of certificates and declarations in accordance with Kbt. - 69 (4) para. biruelat koereben keruel row. Time to call Kbt. Section 64 (1) - (2) Purification according to lEaten help Advice attention
1. The offer must be submitted to the Electronic Collaboration System (ECR) using the forms generated by the system, which is also available under the Bidding Force. Forms made available in word format by the Time Force can be formally modified, but must include at leastden, under the power of time, is gardening information. Exhibiting these forms, below, in pdf format. format must be attached to the offer. The list of documents to be submitted should be included in the co-procurement documents. The offerer with the appropriate bid is Kbt. Section 56 may seek additional information in the notice of initiation of proceedings and in the co
3. In view of Section 73 para., and the environmental, social, and environmental issues listed in Attachment 4 of the Kbtemployment and labor law. The contracting authority shall co-ordinate the names of the organizations from which the tenderer may receive information in the Kbt. On the co-requisites under Section 73 (4), which must be complied with on a performance basis. The contracting authority shall verify in a timely manner that the information published in the tender is in placedo not contradict the Kbt. For the co-workers according to - 73 (4).
4. It is not possible to buy a support material, it is not technologically feasible to procure a support material with potentially widespread technical characteristics, so for technical reasons it is not possible to obtain a support material. Timeline for Kbt. 71 of the Act provides for the possibility of malpractice and calls attention to the Kbt.71 (3) and (8) for non-defective breeders. Timeline for Kbt. Apply - 71 (6) properly. In the event that the Offeror engages in a new economic entity on the Hianypotlas, the applicable Kbt shall be considered. to submit all relevant documents contained in the notice of initiation of the proceeding. Brainstorming on the hianypotlas series involves the hostdoes not order a new hianypotlast for the actor, the offer is determined on the basis of all available information and documents. Hijanypotlas, a bidder, considers economic actors who are not included in the offer, meaning that individuals were not identifiable, as a well-rounded economic operator. It does not apply in the debriefing and co-acquisition documentsKbt.
7. The eligibility criteria and the required proof of compliance with these criteria are included in the official record of qualified tenderers for qualification criteria. Bidding calls the attention of reviewers to the fact that the content of the certificates and statements submitted in the Bidding is entitled to Bid. 69. - (13) es (14)
9. All deadlines specified in the Oral Initiation Notice and Documentation shall be in accordance with the ECR system time. AK has 60 days in each of the two months specified in Section IV.2.6) of the Provisional Test Benefit. The procedure is 320/2015. (X.30.) In the process of control under the control of Keruel. Role in the presentThe manufacturer, type, year of manufacture and place of production, as well as the technical content of the device provided must be identified according to the published model (no trade quotation is required). Bargaining power does not put pressure on the prosecution commissioner. Timeline for Kbt. Article 81 (4) and (5) apply
14. FAX: Attila Kalapos (00032), Gabriella Bajnoczi, (00054) 1535 Bp., Pp. 904.
[email protected]Tovabb VI.4.3)
Internet address (URL): http://www.trvzrt.hu