Object of the contractMulti-purpose sports facilities construction work
Description: Contract notice: Multi-purpose sports facilities construction work
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45212220, 45212225, 45443000, 45421000, 45432100, 45421146, 45430000, 45442120, 45410000, 45260000, 45223500, 45262210, 45262350, 45111200, 45100000, 45262120, 45317200, 45314300, 45315700, 45310000, 45311200, 45316100, 45312310, 45312100, 45312200, 35123500, 35125300, 32333100, 45314320, 32415000, 32423000, 32510000, 45317300, 45311100, 35121700, 45316200, 45315100, 32340000, 32424000, 45312320, 45312330, 45231300, 45000000, 45300000, 45233200, 45212220, 45212225, 45443000, 45421000, 45432100, 45421146, 45430000, 45442120, 45410000, 45260000, 45223500, 45262210, 45262350, 45111200, 45100000, 45262120, 45317200, 45314300, 45315700, 45310000, 45311200, 45316100, 45312310, 45312100, 45312200, 35123500, 35125300, 32333100, 45314320, 32415000, 32423000, 32510000, 45317300, 45311100, 35121700, 45316200, 45315100, 32340000, 32424000, 45312320, 45312330, 45231300, 45000000, 45300000, 45233200
CPV Description: Multi-purpose sports facilities construction work.
Sports hall construction work.
Facade work.
Joinery work.
Floor laying and covering work.
Installation of suspended ceilings.
Floor and wall covering work.
Painting and protective-coating work of structures.
Plastering work.
Roof works and other special trade construction works.
Reinforced-concrete structures.
Foundation work.
Unreinforced-concrete work.
Site preparation and clearance work.
Site preparation work.
Scaffolding erection work.
Electrical installation work of transformers.
Installation of cable infrastructure.
Switching station installation work.
Electrical installation work.
Electrical fitting work.
Installation of outdoor illumination equipment.
Lightning-protection works.
Fire-alarm system installation work.
Burglar-alarm system installation work.
Video identification systems.
Security cameras.
Video recorders.
Installation of computer cabling.
Ethernet network.
Network hubs.
Wireless telecommunications system.
Electrical installation work of electrical distribution apparatus.
Electrical wiring work.
Alarm systems.
Installation of signalling equipment.
Electrical engineering installation works.
Microphones and loudspeakers.
Network infrastructure.
Television aerial installation work.
Radio aerial installation work.
Construction work for water and sewage pipelines.
Construction work.
Building installation work.
Various surface works.
Construction of the Center for Social Activation and Integration with the formation and development for cultural-educational and sport-recreational purposes of the public space of pop(...)
Reference Number: ZP.271.88.2019
The general scope of the subject of the order covers the construction of the Social Activation and Integration Center with a link to the building of the Primary School No. 6 along with the technical infrastructure and land development at ul. Sportowa in Grodzisk Mazowiecki. The scope of the work covered by the contract is specified in the project documentation, specifications ttechnical performance and acceptance of construction works and SIWZ.
Main Site: Grodzisk Mazowiecki
1) The general scope of the subject of the order includes:
1.1. Construction of the Social Activation and Integration Center with a link to the building of the Primary School No. 6 along with the technical infrastructure and land development at ul. Sportowa in Grodzisk Mazowiecki, including: a) construction of a multifunctional facilityA sports hall with stands, sports rooms with accompanying rooms and a link to the existing building of the Primary School. The scope does not include the construction of a lookout tower and the finishing of some of the rooms marked in the design documentation as the scope of construction and finishing works in Stage II;
b) the demolition of existing buildings together with the utilization / utilization of materialw z rozkićki;
c) disassembly of the existing Skatepark. The devices should be dismantled in a way allowing re-use as much as possible of the materials from disassembly to be transported and saved in the Zakład Gospodarki Komunalnej in Grodzisk Mazowiecki, ul. Chrzanowska 15, 05-825 Grodzisk Mazowiecki;
d) development of the area in the immediate vicinity of the Sports Hall buildingaz with a fire road, entrances from Sportowa and Dalekiego streets, parking for passenger cars from the site of the primary school, parking for buses, delivery and other paved surfaces marked in the design documentation for the scope of stage I; e) implementation of necessary construction equipment, connections and installations that provide the facility to be used in accordance with its intended use.In the area of sanitary and electric networks: sanitary sewage in total, water supply connection and storm water drainage, except fragments in the excluded range, electrical networks, except fragments in the excluded scope. (All utilities on the border of stages should be made in a way that allows later execution of the second stage without disassembling the pavements built.)
1.2. Marking and securing the construction site for the duration of the robot,
1.3. Surveying service, preparation of a complete as-built documentation including as-built surveying inventory,
1.4. Preparation of operating instructions, operation and maintenance of installations, machines and devices as well as technological lines installed on the site or built into the facility, as well asUser training in this area on the date agreed with the Employer,
1.5. Execution of fire safety instructions, firefighting equipment,
1.6. Sorting the construction site and the area around the robot,
1.7. Securing and supervision of the completed facility until obtaining permission to use it and transferring it to the userThe application will be based on project documentation prepared by the Design Studio Paweł Tiepłow, ul. Osowska 27/5, 04-302 Warsaw, POLAND, which defines the scope of the robot.
The contracting authority does not specify the condition of participation in this scope.
The contractor will fulfill the condition of participating in the proceeding regarding the economic or financial situation mentioned in point 4.2.1. point b) SIWZ, if it proves that psettles funds or creditworthiness in the amount of PLN 10, 000, 000.00 (ten million zlotys). In order to confirm compliance with the conditions for participation in the proceedings set out in point 4.3. Terms of Reference The Purchaser requires the contractor to provide:
a) information from a bank or cooperative savings and credit union confirming the amount of financial resources held or a creditworthinessin the period not earlier than one month before the deadline for submission of tenders.
If for justified reasons, the contractor can not submit documents regarding the financial or economic situation required by the contracting authority, may submit another document that sufficiently confirms compliance with the condition of participation described by the contracting party in the proceedings
1. The customer informsthat pursuant to art. 24aa of the Public Procurement Law, will first evaluate the offers, and then examine whether the contractor whose offer has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the proceedings.
2. The contractor is excluded from the contractor in relation to which any of the conditions specified in art. 24 sec. 1 item 12-23 and art. 24 sec. 5 pts 1-8 Pzp. INIn order to confirm the lack of grounds for excluding the contractor from participation in the proceedings, the contracting authority requests the documents listed in point 5.3 of the ToR.
3 If the contractor has its registered office or place of residence outside the territory of the Republic of Poland, instead of the documents referred to in point 5.3. SIWZ The Contracting Authority requests the documents listed in point 5.5 of the ToR.
4. The contracting party demands from the contractor, which relies on the abilityor the situation of other entities to present in relation to these entities the documents listed in point 5.3. points 1-9 of the ToR.
4. According to art. 24 sec. 11 of the PPA, the contractor, within 3 days of posting on the website information on the amount that the contracting authority intends to allocate to finance the order, companies and addresses of contractors who submitted offers inpasses, prices, dates of order fulfillment, warranty period and payment terms contained in offers, provides the orderer with a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23 of the Act with PPL. With the submission of a statement, the contractor may provide evidence that links with another contractor do not lead to distortion of the competitionin the proceedings for the award of the contract. Note to section IV.2.6) of the notice: The offer validity period is 60 days.
7. The clause regarding the processing of personal data is in the ToR.
8. Note regarding part IV EQUIT titled: "Eligibility criteria", the Contractor may limit himself to completing section a, in which case the contractor shall not complete any of the other sections (A-D) in part IVEAT.
9. Communication between the Employer and Contractors is done using the miniPortal https://miniportal.uzp.gov.pl/, ePUAP https://epuap.gov.pl/wps/portal and e-mail: e-mail
[email protected].
10. Other information (due to the limited number of characters) are included in the ToR.
Internet address (URL): http://www.bip.grodzisk.pl