Tender notice from Poland, published on 13 Oct 2018.
Exeutive Summary
The UNIWERSYTET MEDYCZNY W LUBLINIE has issued a Tender notice for the procurement of a Contract notice: Multi-purpose sports facilities construction work in the Poland. This Tender notice was published on 13 Oct 2018 and is scheduled to close on 22 Nov 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 27634275, while the tender notice number is 446868-2018 and Register on the platform.
Key facts
Summary
Contract notice: Multi-purpose sports facilities construction work
Object of the contract Multi-purpose sports facilities construction work Description: Contract notice: Multi-purpose sports facilities construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45212220, 45262211, 45233120, 45112700, 45231300, 45231100, 45332000, 45331100, 09332000, 09331100, 45212225, 45331000, 45310000, 45312000, 45312100, 45312200, 45314300, 45212220, 45262211, 45233120, 45112700, 45231300, 45231100, 45332000, 45331100, 09332000, 09331100, 45212225, 45331000, 45310000, 45312000, 45312100, 45312200, 45314300 CPV Description: Multi-purpose sports facilities construction work. Pile driving. Road construction works. Landscaping work. Construction work for water and sewage pipelines. General construction work for pipelines. Plumbing and drain-laying work. Central-heating installation work. Solar installation. Solar collectors for heat production. Sports hall construction work. Heating, ventilation and air-conditioning installation work. Electrical installation work. Fire-alarm system installation work. Burglar-alarm system installation work. Installation of cable infrastructure. Construction of a sports and entertainment hall at the Medical University of Lublin together with outdoor sports fields, case number: UM-ZP-262-61 / 18 Reference Number: UM-ZP-262-61 / 18 1. The subject of the order is the buildingnew sports and entertainment hall of the Medical University in Lublin together with external sports fields. The scope of the robot includes: Construction works involving the construction of a sports and entertainment hall at the Medical University of Lublin with sports medicine rooms along with the demolition of the old sports hall, making connections, land development, outdoor sports fields and making the KDD-G road for theserenie located in the area of al. Mirosława Smorawiński, ul. Witold Chodźki and ul. Ludwik Hirszfeld on plot no. 4/32 and part of plots 8/2 and 4/28 in the vicinity of the didactic and clinical base as well as students' houses. The subject of the orders includes construction works together with obtaining a permit for the use of a building object. Main Site: Lublin, POLAND 1. The object of the order is building the hall inThe scope of the robot includes: Construction works consisting of the construction of a sports and entertainment hall of the Medical University of Lublin with sports medicine facilities, including the demolition of the old sports hall, making connections, land development, outdoor sports fields, and execution of the KDD-G road on the premisesin the area of al. Mirosława Smorawiński, ul. Witold Chodźki and ul. Ludwik Hirszfeld on plot No. 4/32 and part of plots 8/2 and 4/28 in the vicinity of didactic and clinical base and students' houses. The subject of the orders includes construction works and obtaining a permit for using the construction object. Technical parameters of the designed sports and entertainment hall : • areaarea covered by the study: 2.34 ha • total area: 11 334.73 m; • building area: 3 455.52 m; • usable area: 7 881.32 m 178.40 m (technical rooms) 8 059, 72 m; • cubic volume: 76 097, 94 m; • building length: 80, 65 m; • building width: 47, 35 m; • building height: 22, 90 m; • number of storeys: 3 and level 3.40 m (technical rooms); • 2 external ktennis courts with dimensions 23.77 mx 10.97 m each; • 2 outdoor beach volleyball courts with dimensions of 16 mx 8 m each; • Streetball courts with dimensions 24.1 mx 12.34 m 2.Chains description of the subject of the order is included in Annex No. 1 to the Terms of Reference "Description of the subject of the order." 3. The contractor is obliged to fulfill the order on the terms and conditions described in the model contractnew Annex No. 7 to the ToR. 4. Common Procurement Vocabulary (CPV): 45212220-4 - Construction works related to multi-purpose sports facilities 45262211-3 - Pile driving 45233120-6 - Road construction works 45112700-2 - Construction work 45231300-8 - Construction work for the construction of water supply and pipelines for sewage disposal 45231100-6 - General construction worke related to the construction of pipelines 45332000-3 - Water and sewage installation works 45331100-7 - Installation at 09332000-5 - Solar installations 09331100-9 - Solar collectors for the production of heat 45212225-9 - Construction work related to sports halls 45331000-6 - Installation of heating, ventilation and air conditioning equipment 45310000-3 - Electrical installation work 45312000-7- Installation of alarm systems and antennas 45312100-8 - Installation of fire alarm systems 45312200-9 - Installation of burglar alarm systems 45314300-4 - Installation of cabling infrastructure 1.Our contractors can apply for Contractors who: 1.1.no not subject exclusion in circumstances referred to in art. 24 sec. 1 Pzp, 1.2. Meet the conditionsin the proceedings regarding: 1.2.1. competence or entitlements to conduct a specific professional activity, if it results from separate regulations - the Ordering Party does not set a specific condition in this respect. 1.2.2. economic or financial situation - the Ordering Party considers that The Contractor will meet the condition if it shows funds on the bank account or creditworthiness for an amount not lessPLN 10 million (in words: ten million zlotys). 1.2.3. technical or professional capacity - a) in terms of technical capacity - the Contracting Authority will recognize that the Contractor meets the condition, if it shows that in the last 5 years before the deadline for submission of bids, and if the period of business is shorter during this period: a minimum of one construction work worth not less thanless than PLN 25 million gross (in words: twenty five million PLN gross), consisting in the construction of a building with a minimum capacity of 50, 000 m3. b) in terms of professional capacity - the Employer will consider that the Contractor will fulfill the condition if it proves that he will refer to implementation of a public order, people with the following qualifications: - Site manager, min. 5 years of professional experience on-the position of the construction manager in the implementation of cubature buildings, including experience in managing the construction of at least one completed facility with a volume of not less than 50, 000 m3, the right to manage robots in the construction and construction specialty without restrictions; Building management must include a complete, multi-branch process of implementing a new facility, and the facility must be completed-as at the date of initiation of the proceedings (end date is the date of signing the final acceptance report), - Robot manager in the sanitary specialty, min. 5 years of professional experience in the management of robots in the field of network and sanitary installations as a construction manager or robot manager, powers to run robots in a sanitary specialty without restrictions, - Robot manager in specjaelectricity min. 5 years of professional experience in managing electric works as a construction manager or robot manager, qualifications to perform independent functions in construction in the electrical specialty - without restrictions, - Robot manager in a road specialty, min. 5 years of professional experience in the field of road works, as a construction manager or robot manager, CAUTION: The Employer does not allow several persons to combine several functions despite having several required building authorizations. The construction manager should have building qualifications in accordance with the Act of July 7, 1994. Building Law and the ordinance of the Minister of Infrastructure and Development of 11 Septemberin 2014 on independent technical functions in construction or corresponding valid building permits, which were issued on the basis of previously applicable provisions. According to art. 12a of the Construction Law, independent technical functions in construction, specified in art. 12 para. 1 may also be performed by persons whose relevant professional qualifications have been recognized as eligibleprovided for in separate regulations. The separate act is the provisions of the Act of 22 December 2015 on the rules for the recognition of professional qualifications acquired in the European Union Member States. 2. The Contracting Authority may, at any stage of the proceedings, consider that the Contractor does not have the required capabilities if the involvement of technical or professional resources Contractors in other undertakingsContractor's economic interests may have a negative impact on the order's performance. 3.In the case of Contractors jointly applying for the award of orders: Continued list, referred to in point. III.1.1) 3.1. Conditions for participation in the proceedings referred to above in point 1.2 must be met by contractors together with the reservation that one Contractor or one entity providing access to the resourcey must have full experience indicated in the condition of participation in the proceedings referred to in sub-paragraph 1.2.3 a); 3.2. there are no grounds to exclude from the contract award procedure in the circumstances referred to in point 1 item 1.1 above, and in Chapter X, point 1, point 1.1 1.2, i.e. referred to in art. 24 section 1 and section 5 items 1 and 8 of the Public Procurement Law, it must be proved byeach of the Contractors. 4. The contractor may confirm the fulfillment of the conditions referred to in point. 1.2.2. and 1.2.3. where applicable and in relation to a particular contract, or a part thereof, rely on the technical or professional capacity or financial or economic situation of other entities, regardless of the legal nature of the legal relationship it has with it.the concurrently informs that the "appropriate situation" referred to in item 4 above will occur only if: 5.1. The contractor, which relies on the abilities or situation of other entities, must prove to the Ordering Party that the ordering will have the necessary resources these entities, in particular by presenting the obligation of these entities to give it to dispose 5.2. The Ordering Party will assess whether the technical or professional capacity or their financial or economic situation made available to the Contractors by other entities, allow the Contractor to demonstrate compliance with the conditions of participation in the procedure and will examine whether the entity is subject to this grounds for exclusion, referred to in art. 24 sec. 1 point 13 22 and par. 5 points 1 and 8 of the Public Procurement Law 5.3. Regarding the conditions relating to education, professional qualifications or experience, the Contractors may rely on the capacities of other entities, if these entities carry out construction works for implementation, which these capacities are required. GROUNDS FOR EXCLUSION ABOUT ARTICLE 24 ITEM. 5 PPL Acts 1.The orderer provides, additionally, based onabout art. 24 sec. 5 points 1 and 8 of the Public Procurement Law, exclusion of the Contractor: 1.1. In relation to which the liquidation was opened, the court approved in the restructuring proceedings is expected to satisfy the creditors by liquidating its assets or the court ordered the liquidation of its property pursuant to art. 332 par. 1 of the Act of 15 May 2015. Restructuring law or which the bankruptcy of thewas made, with the exception of the Contractor who, after the bankruptcy, concluded an arrangement approved by a final court decision, if the arrangement does not provide for the creditors to be satisfied by liquidation of the bankrupt's assets, unless the court ordered the liquidation of its assets pursuant to art. 366 para. 1 of the Act of February 28, 2003. Bankruptcy Law, 1.2.ctors violated obligations regarding tax payments, fees orb social or health insurance premiums, which the Employer is able to demonstrate by means of appropriate evidence, except in the case referred to in art. 24 sec. 1 point 15) of the Public Procurement Law, unless the Contractor has made payments of taxes, fees or social or health insurance contributions, including interest or fines, or has entered into a binding settlement agreementthese receivables. XI. STATEMENT OF REPRESENTATIONS OR DOCUMENTS CONFIRMING THE FULFILLMENT OF CONDITIONS FOR PARTICIPATION, NO BASICS OF EXCLUSION AND OTHER - A. Documents and statements submitted with the offer: 1.The contractor, in order to confirm the fulfillment of the conditions for participation in the proceedings set out in chapter IX of the SIWZ, and showing the absence of grounds for exclusion, submit together with the offer valid on the day submittedoffers in the form of a single European order document (EAT). In order to submit a statement, you should: 1. The training is conducted in Polish via the Procurement Platform (hereinafter referred to as "Platform", "System") at: https://umlub.eb2b.com.pl and under the number of the UM- ZP-262-61 / 18. 2. The use of the Platform by the Contractor is free. 3. Communicationbetween the Employer and Contractors is carried out in electronic form via the Platform in the "Questions / informations" tab in relation to all declarations, applications, notices and information. In the case of introducing in the Platform other content than specified in the user's manualfrom the Procurement Platform, the Ordering Party considers binding information that has been submitted in the form and on the terms specified in Chapter III, point 7 of the ToR. 4. Offers, contracts and statements and documents for which the legislator provided only for written form, consists in this proceeding under pain of nullity in writing, through the postal operator within the meaning ofy on November 23, 2012. Postal law or in person, or through the messenger. 4.1. In the scope of statements and documents for which the legislator provided only written form, the Ordering Party allows them to be sent electronically via the Platform in the "Questions / lnformation" tab, and then immediately confirmed by a written form to the address of the Ordering Party 4.2.W correspondence kiThe contractor should use the number of proceedings specified in the SIWZ. 5. The certificate in the form of the Single European Order Document (EED) is submitted under pain of nullity in electronic form, according to the instructions described in items 7.5 - 7.6. 6.The contractor joining the proceedings for granting a public order, i.e. free of charge by registering or logging in-(if you have an account) on the Platform, accept the terms of use of the Platform, as set out in the Regulations posted on https://umlub.eb2b.com.pl, at: https://umlub.eb2b.com.pl/cms/ page / id / terms-and-conditions, and considers it binding. Detailed information is contained in the ToR. In this proceeding the Employer will apply the so-called reverse procedure, i.e. the procedure referred toin Article 24aa of the Public Procurement Law - the Contractor may entrust the execution of a part of the order to a subcontractor or subcontractors. The Contracting Authority provides for the possibility of ordering, referred to in art. 67 sec. 1 point 6 of the Public Procurement Law, relying on the return of similar construction works, on conditions similar to the basic order, in the range not exceeding 50% of the value of the basic order.the party demanding that the Contractors pay a bid bond. Contractors entering the tender are obliged to make a bid bond in the amount of PLN 700, 000.00 (in words: seven hundred thousand and PLN 00/100). Estimated order value in point. II.2.6) was given without the orders referred to in art. 67 section 1 point 6 of the Public Procurement Law Internet address (URL): www.umlub.pl
The bid deadline for Contract notice: Multi-purpose sports facilities construction work was 22 Nov 2018. Bidding is closed.
This tender has been issued by UNIWERSYTET MEDYCZNY W LUBLINIE in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45212220 - Multi-purpose sports facilities construction work, 45262211 - Pile driving, 45233120 - Road construction works, 45112700 - Landscaping work, 45231300 - Construction work for water and sewage pipelines, 45231100 - General construction work for pipelines, 45332000 - Plumbing and drain-laying work, 45331100 - Central-heating installation work, 09332000 - Solar installation, 09331100 - Solar collectors for heat production, 45212225 - Sports hall construction work, 45331000 - Heating, ventilation and air-conditioning installation work, 45310000 - Electrical installation work, 45312000 - Alarm system and antenna installation work, 45312100 - Fire-alarm system installation work, 45312200 - Burglar-alarm system installation work, 45314300 - Installation of cable infrastructure.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 27634275. The purchaser document reference is 446868-2018.
This tender falls under Construction and Real Estate, Power and Energy in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.