This tender has closedBids were accepted until 13 Jun 2019 (2709 days ago). New bids can no longer be submitted. The details below are kept for reference.
Tender notice from Hungary, published on 15 May 2019.
Exeutive Summary
The BALATONFÜREDI VÍZISPORT ÉS SZABADID? KÖZPONT NONPROFIT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Multi-functional buildings construction work in the Hungary. This Tender notice was published on 15 May 2019 and is scheduled to close on 13 Jun 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 32971602, while the tender notice number is 223871-2019 and Register on the platform.
Key facts
Summary
Contract notice: Multi-functional buildings construction work
Object of the contract Multi-functional buildings construction work Description: Contract notice: Multi-functional buildings construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45211350, 45213313, 45211350, 45213313, 45248400, 45241300, 45242200, 45243000 CPV Description: Multi-functional buildings construction work. Service-area building construction work. Landing stages construction work. Pier construction work. Marina construction work. Coastal-defence works. Balatonfueredi megallopont letesitese 2. Reference Number : EKR000570332019 Balatonfueredi megallopont letesitese. Main Site : 8230 Balatonfuered, Szechenyi Istvan utca 24. hrsz: 18/6 Balatonfueredi MegalloPoint of development is the first step in making all the allowances and plan documentation available. Main parameters of the investment: The epite activity: the service of the new service and the server epuel, the investment framework of the new project, the work of the bossas, the work, the epithelium, the workshops, the street cubes and the youth. It is a 2-storey, 1490 m2 net useful floor space, with a 190 m2 terrace. A cadaver, a round patrol, a chemical toilet tarolo, a cheetah and an electric chest breathand void. The net useful base area of the breasts is about 58 m2. The shore epithet resides in the demolition of the existing counterparts (epuelets, mills). parkolo letesuel. In the parkolo, the noevelese of the celestial field is placed on the fence by the wheelchair. Parking lots in the car park due to the prominent carvings of some trees abandoned kerosels and "zoeld" cassettes are packed Other Parameters: Kikoető epueletes (Headpiece and Breastfeeding) Utolo Parkolo epites Parkolas celery in the area 77 pieces. parkolo letesuel. In the parkolo, the noevelese of the celestial field is placed on the fence by the wheelchair. The parking lot in the parking lot due to the prominence of some of the trees is abandoned keruelt and "zoeld" cassettes have been assembled for the design.jet: From the set of Anna setany, the gate at Lake Balaton is mainly inland. Correspondingly, there is a parking lot 45 next to the epuel. The manipulacios square crosses, the camping side has the outward traffic. They are all set up for Anna Setany's gate (from the camping and from Lake Balaton) to the Kyrgyzstan transport. The paved feluelets are concrete blocks with a concrete bfor sale to Keruel, 5340 m2. Coastal teruelet faucet condensate The paved feluelets are tapered with a tapered channel and water jets to form keruel. In front of the entrance to Lake Balaton, which is used by the reception area, the oil barrel is used as a cooler.lakitasra. Befogadoru has used the existing interior of the campsite, and the campsite lifter continues the resulting wastewater at half the Tihanyi workshop. OTP ueduelő koezoetti terueletan halado with NA100 slender wire rope joints youdevastated Parti-teruelet electric power supply The power of the energy-consuming power of the oenallo velezezes point keruel (where E.ON will undoubtedly serve the energy). After the preliminary energy balance, the energy was proclaimed to the Aramaic Service (E.ON Hungaria Zrt.).t planar tents for parking lots, utpalyak, pedestrian transporters and mollusks are covered by the road. Approximately 11 pieces of wood (sorfa trees) perched on kerosene plantsA row of about 2800 m2 of terueled grassland grasslands. The use of a single-layered (atalanyaras) type of content for the colloquium. It continued because of the charactersI. Res.: "II.2.4) Description of the procure:" point For all times: 1. It is not possible to have a timekeeper, a subordinate, and not to be a real player in his / her correct case, against whom Kbt.62. - (1) and (2) exclude the grounds for exclusion.he can do the oentoplasty properly. In this case, the host participant will enter into the final decision of the trustee with the unified European Co-Purchase Document (hereinafter EEKD) at the same time. The timer is unsuitable if the hosts of the building industry that are based on the construction industry are not included in the construction industrydo not have any activity in the notepads, or the non-Hungarian hosts are not listed in the country of residence, or they do not have a license, legal or organizational license in the country of residence. The subscriber in the newsletter is Kbt.67 (1), and Decree 321/2015. (X.30.) on the right to exclude expulsions in the case of the case-law, and on the basis of Section 2 para. to confirm in advance that Kbt does not belong. -- 62 (1) and (2) are the power of the power.do: the Kbt. Article 67 (1) - (3), 321/2015. (X.30.) Government Decree No. 3 (4) (1). "The revelation of the most promising statement, and if the news force proves it, Kbt. -- 69 (4) - (7), in the case of subscribers established in Hungary, must apply Section Kr.8, in case of non-Hungarian journalists, - Kr.10./documents / certificates, taking into account the provisions of -- 12-12 and - 14-16 (1) - (2), sub-subheading (Section Kbt.67 (4), with regard to Article 15 (2) of Government Decree 321/2015 (X.30.)). In Section Kr.15 (1)zdese is based on the correct reader of the organization in which it is based on only the EEKD document to insert the Kbt. - 62 (1) - (2) exclusions are not valid in forests. -- 69 (11) and Kr.1 (3) apply accordingly. (X.30.) Government Decree on the basis of the pending entryIn case of zesi eljaras, the timer attaches to the journal the variables entered in the cegbirosag, and the verbized by the cegbirosag. If the Proprietor is not in the process of proceeding with a change in registration, a negative statement to that effect will be entered into. The timekeeper in his schedule is the unified european sceneAuthorship document must be pre-certified to be included in the relevant non-notes or registered or with the permission, legal title, or organizational, chamber tags. ce In the case of a non-Hungarian entrepreneur established in Hungary, the report in accordance with Section Kbt. the certificate (extract) according to the registers listed on the backside or any otherzolast, or a statement to be certified. The person who submits the report must attach the EECD, in which the prior proof of the appropriate candidates will accept the simple declaration (Ref. IV:based on the most favorable timeline of the next best-performing dog in the consecrated order, the technical testimonials of the dog, the technical and the professional qualities of the dog (All the results are iranado): P / 1. 321/2015. (X. 30.) Government Decree (hereinafter referred to as "Kr."), - 19 (1) (a) is based on the samlavez.nzuegyi intezmenyet, the reporter's reminder of all the pennants of the pennants that led in the present day, recapitulating the present day, the present fellow will give a no-rudder statement with the lower content, deliberately when the timer dropped or when he started his activity, if these data are availablealli: - samama samama, - miota leads the donkey, - the samlan was present in the past 12 months before the day of the present day of the day. ("Row allitas": as defined in - 2.25 of LXV of 2009, as defined in Section 25, paragraph 25.) The declarations - in accordance with the practice of the bankruptcy bank - may be divergent forms, but each of them has a unique and residualIt is also necessary to give the Penzuegyi an intuitive statement that contains a "queue pool" instead of a "queue allitas". all - the exam periodIn this case, he introduced the Penzueli insider statements in relation to the downloading or downloading. In the case of a discontinued velocity sampler, all the verbs that have been erased by the expired date can accept the minimum qualifying alatamasas. P / 2. On the basis of Section 19 (1) (b) of the Cr., The subscriber attaches the last day of the third day before the day of the present day.the law of the country where the contract is concluded, the law or the predecessor of the transaction is a simple reprimand for the supplement to the bill of exchange (if the law of the host country is established by the law). If you are able to get to know the website of ceginformacios servalat, you can get the information from the website.This newsletter verifies that the cadinformacios on the homepage of ceginformacios servalat is not plain. If the law of the country of establishment of the timekeeper does not provide for the prescription of the sesamolo, this statement shall be deemed to have been made in respect of the relevant minimum requirements.in the first half of the year, since the beginning of the period began to arrange artifacts, the person is entitled to prove the suitability of the contract for the purchase of the coat. In this case, the newsletter will be able to find the appropriate host of Penzuegyi, if during the time of the artificial breeding (from the beginning of the artificial season to the time of the sixth time), the collecting of the chips (epitei beruhazas realo)sitasa) - with a low turnover adkukueli suitit - arbevete passes or exceeds in case of case 1) HUF 500 000 000, - oetszazmillio forints, II. HUF 120, 000, 000 (Sazhusmillion), respectively. HUF 350, 000, 000 (thirty-five days) in case of incidents, [321/2015. (X.30.), - 19 (2) of the Government Decree].zere can be accessed in the electronic coexistence system (hereinafter referred to as EKR) raised by the Ministry of Foreign Affairs, at https://ekr.gov.hu. : 00ora, Volume: 8230 Balatonfuered, Szechenyi Istvan utca 24, Camping bejarat, - Duration given in Item 2 of section IV.2.6)60 days. AK excludes the AT, sub-subcontractor, the organization (or bribe) who retains the appropriate real-life certificate from the reseller, who has been involved in the quarrel, - AT expects to present the present and the koezb. must be prepared and presented in accordance with the content and formal requirements contained in this document.at the time of his authorship, he must have the appropriate ISO 14001 management system for cadre driving, certified by an independent organization (or equivalent from an organization registered in the European Union); or all of themeten the referrals to the crosstalk driving system are equivalent to those that can be used in full queue by the AT, - AK provides the chances of the warship according to Kbt.71AK. AT enters into the hunt for a non-trader hunter in the foreground, and this hostIf an AT is involved in the event with a hijanypotlass, all documents related to the host actor must be captured in the hotspot, - The schedule must include Kbt.66. Article 5 (5) read-out pages, according to AT Kbt.66 (2) and 66 (6).Statement Kbt.66.- (6) must also be entered in the negative case. The Croak Driving Predecessors Must Be Conflicting017. (XII.19.) Government Decree (EDF Regulation), as well as the provisions of the Co-operation Document, should be applied - The announcements must be made in the electronic co-procurement system (EDF) as stipulated in the EDF Regulation and in the Co-operation Document, - AK draws attention to - 11 (1) (4) and Article 13 (3) and (4) of the EDF Regulation, - The language of the timetable is Hungarian, - AKOn the basis of Article 30 (4) of Government Decree 321/2015 (X.30.), the ATK has established the conditions and conditions of the certificate in the case of P1-P2, M1-M2 points, - AK does not make it possible that the winning AT / ATk bring / create an organization in the authorship of the author's performance, as a gold medal in the Kezzeszerzes document; Point to point 0-100, - AK applies the Kbt.75 (2) (e) in a row, - AK is the bourgeois and conspiracy of the presentations with regard to Kbt.81 (4) - (5) with all the options, - All times: koezep-european (local) time, - Iranyado law: the obsession is the day of power Kbt.vonatkozo foreclosures, as well as the regulations of your vegrehajtos, and the e-mails of the e-shop, Reg. 424/2017. (XII.19.) Government Decree, - FAKSZ: Dr. Andr-s Komlodi; I got it: 00228. AT = AT AK = AK CHARACTERCORLORATHY WHAT I CAN KNOW WHAT YOU CAN KNOW Internet address (URL): http://www.hunsail.hu
The bid deadline for Contract notice: Multi-functional buildings construction work was 13 Jun 2019. Bidding is closed.
This tender has been issued by BALATONFÜREDI VÍZISPORT ÉS SZABADID? KÖZPONT NONPROFIT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45211350 - Multi-functional buildings construction work, 45213313 - Service-area building construction work, 45248400 - Landing stages construction work, 45241300 - Pier construction work, 45242200 - Marina construction work, 45243000 - Coastal-defence works.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 32971602. The purchaser document reference is 223871-2019.