This tender has closedBids were accepted until 18 Apr 2019 (2765 days ago). New bids can no longer be submitted. The details below are kept for reference.
Tender notice from Hungary, published on 18 Mar 2019.
Exeutive Summary
The BALATONFÜREDI VÍZISPORT ÉS SZABADID? KÖZPONT NONPROFIT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG has issued a Tender notice for the procurement of a Contract notice: Multi-functional buildings construction work in the Hungary. This Tender notice was published on 18 Mar 2019 and is scheduled to close on 18 Apr 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 31624618, while the tender notice number is 123735-2019 and Register on the platform.
Key facts
Summary
Contract notice: Multi-functional buildings construction work
Object of the contract Multi-functional buildings construction work Description: Contract notice: Multi-functional buildings construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45211350, 45213313, 45211350, 45213313, 45248400, 45241300, 45242200, 45243000 CPV Description: Multi-functional buildings construction work. Service-area building construction work. Landing stages construction work. Pier construction work. Marina construction work. Coastal-defence works. Balatonfueredi megallopont letesitese Reference Number : EKR000255532019 Balatonfueredi megallopont letesitese. Main Site : 8230 Balatonfuered, Szechenyi Istvan utca 24. hrsz: 18/6 Balatonfueredi Megallopont developer in line with the allo permissions and plan documentation. Main parameters of the investment: The epite activity: the service of the new service and the server epueles the framework of the new framework of the project, the new project, the work of the bossas, the utepitess, the garden epitome, the workshops, the street vectors and the youth. The pedestal canopy foeld level is a 2-storey, 1490 m2 net useful floor space, which is an additional room with 190 m2 terrace. A cadaver, a round patrol, a chemical toilet tarolo, a cheetah and an electric chest breath reset in the party epitheliumk. The net useful base area of the breasts is about 58 m2. The shore epithet resides in the demolition of the existing counterparts (epuelets, mills). parkolo letesuel. In the parkolo, the noevelese of the celestial field is placed on the fence by the wheelchair. Parking lots in the car park due to the prominent carvings of some trees are abandoned and "zoeld" cassettes are designed Other Parameters: Kikoető epueletes (Headpiece and Breastfeeding) Utolo Parkolo epithea Parkolas' body from the space of 77 pcs. parkolo letesuel. In the parkolo, the noevelese of the celestial field is placed on the fence by the wheelchair. The parking lot in the parking lot due to the prominent carvings of the trees is abandoned and the "zoeld" cassettes have been assembled for the design.From the set of Anna setany, the gate at Lake Balaton is mainly inland. Correspondingly, there is a parking lot 45 next to the epuel. The manipulacios square crosses, the camping side has the outward traffic. They are all set up for Anna Setany's gate (camping and Lake Balaton). The paved feluelets are a concrete element with a stone envelopecovered with keruel, 5340 sq.m. Coastal teruelet faucet condensate The paved feluelets are tapered with a tapered channel and water jets to form keruel. In front of the entrance to Lake Balaton, which is used by the reception area, the oil can be used as a cool Parti teruelet wastewater discharges The wastewater drain of the teruelet is also closed with a ducted channel.ITAS. Befogadoru has used the existing interior of the campsite, and the camping lifter will carry the resulting waste water half of the Tihany's work to the beach. OTP ueduelő koezoetti terueleten halado with a connection to the NA100 shank groovesztuek Parti-teruelet electric energy supply The power of the energy of the projector is to develop the oenallo velezezes point keruel (to which the E.ON deserves the energy). After the preliminary energy balance, the energy was proclaimed to the Aramaic Service (E.ON Hungaria Zrt.).ervilagitasa car parks, utpalyak, pedestrian transport roadside and mollusks are covered by the road. Partial teruelet asset management In the planning area, the more detailed garbage systems are installed for keruel (planting system, CCTV system, door intercom system, wireframe WIFI) Party teruelet garden epites about 11 pieces of wood (sorghum) ueltetesere kerueland about 2800 m2 of teruelet grassland. I continued with I.resz: "II.2.4) Description of the procure:" point For all time points: 1. (1) and (2) are excluded from the scope of the exclusions listed in section Kbt.64.can be responsible for the oentoplasty. In this case, the host participant will enter into the final decision of the trustee with the unified European Co-Purchase Document (hereinafter EEKD) at the same time. The timer is unsuitable if the hosts in the building industry do not include the construction industry on the basis of their schedulezesi's activities are not included in the notes of non-Hungarians, or the host actors not established in Hungary are not registered in the country of establishment, or do not have a license or legal or organizational license in the country of establishment. To the subscriber in the newsletter, see Kbt.67 (1), paras stated in Government Decree 321/2015. (X.30.), in the case of the case-law, the reasons for the expulsion are valid and the grounds for specifying the technical terms and conditions (hereinafter referred to as Kr.) of Section 2 (1) are to be submitted to the EECD. to confirm in advance that Kbt does not belong. -- 62 (1) and (2), the power of the cosmic.the Kbt. Article 67 (1) - (3), 321/2015. (X.30.) Government Decree No. 3 (4) (1). "The revelation of the most favorable statement, and if the news force proves it, is the Kbt. -- 69 (4) - (7), in the case of journalists established in Hungary, shall be required to apply in the cases of Kr..10. In the present, it is necessary to introduce a statement stating that he does not take the honor of the author's performance as an actor. (1) - (2) (sub-paragraph Kbt.67 (4), with regard to Article 15 (2) of Government Decree 321/2015 (X.30.)). Section Kr.15 (1)nor is the subscriber based on the appropriate proof-reading organization, only the KDD document is inserted into the KDB. - 62 (1) - (2) exclusions are not valid in forests. Apply -- 69 (11) and Kr.1 (3) accordingly. (X.30.) Article 13 of the GovtIn the event of an accident, the timer must attach the variation entry frame to the newsletter and the verb in the cegbirosag. If the Proprietor is not in the process of proceeding with a change in registration, a negative statement to that effect will be entered into. The timekeeper in his schedule is the unified european chessboxrzesi document has to be presented in advance to confirm that it is included in the relevant non-notes or registered or has the permission, legal title or organizational, chamber tags. signet In the case of a host member not established in Hungary, an update of the newsletter Kbt. Certificates (extracts) of the registers listed in the backside or other proofs You must attach the EECD to the newsletter, in which the prior proof of the appropriate case claims is accepted by the notifier and the simple declaration (Ref. IV:apjan is the most favorable timekeeper in the consecrated order, which is the last proof-proof dog in the dog, the technical and professional qualities of the dog (s) are all the following (in each case, iranyado). 321/2015. (X. 30.) Government Decree (hereinafter referred to as "Kr."), - 19 (1) (a) is based on the samlavezing penzuone of the most intrusive issues, the reporter's reminder of all the pennants of the pennants that led in the present day, recapitulating the present day, the present fellow will give a day-to-day statement with the lower content, rather than when the timer dropped or when he started his activity, if these data are available: - Samama's Samples, - Myths Leads, - Samlan was in the past 12 months before the day of the present day, and was in the queue for 15 days. ("Line allitas": according to the concept defined in Section 2, paragraph 25, of LXV of 2009, ). The declarations - in accordance with the practice of the bankruptcy bank - may be divergent forms, but each of them has a unique and non-permanent form.the penzuegyi, who is in the forefront of the discussion, has to give a verdict, and the journalist also accepts the Penzuegyi insider statement, which contains a queue of "queue pool" instead of "queue allitas". - during the exam periodPennuegyi's insider statements have been introduced in relation to Samlasamara. In the case of a discontinued velocity sampler, all the verbs that have been erased by the expired date can accept the minimum qualifying alatamasasas. P / 2. On the basis of Article 19 (1) (b) of the Cr.it or its predecessor is covered by a law-abiding proclamation - a simple repetition of the syllables corresponding to the computational supper is done by an extra bail (if the law of the host's country of establishment is prescriptive). If you are able to get to know the ceginformacios servalat website, you can get the information from the newsletter.checkmate is checking the cadinformacios servalat found on the homepage of the samamolo attachment is not plain. If the law of the country of establishment of the timekeeper does not provide for the prescription of the sesamolo, this statement shall be deemed to have been made in respect of the relevant minimum standards.in this case, since the beginning of the period, he started to arrange artifacts, and he is entitled to prove his suitability for a contract with the colleague of the acquirer. In this case, the newsletter will be able to find the appropriate host of Penzuegyi, if, during the period of the artificial breeding (from the beginning of the artificial season to the start of the sixth period of time), the collegiate purchase (the epite investment is realized)asa) - low turnover adku nelkuel samitott - arbevete passes or exceeds in case of case 1) HUF 500 000 000, - oetszazmillio forints, II. HUF 120, 000, 000 (Sazhusmillion), respectively. HUF 350, 000, 000 (thirty-five days) in case of incidents [321/2015. (X.30.), - 19 (2) of the Government Decree].The electronic coexistence system (hereinafter referred to as EKR) raised by the Ministerial District is available at https://ekr.gov.hu. 00ora, Volume: 8230 Balatonfuered, Szechenyi Istvan utca 24, Camping bejarat, - Duration given in Item 2 of section IV.2.6)60 days. AK excludes the AT, sub-subcontractor, the organization (or person) that retains the appropriate real-life certificate from the reseller, who has taken the lead in the first place, - AT expects to present the present and the koezb. must be prepared and presented in accordance with the content and formal requirements contained in this document;bb, at the time of the authorship, must have the ISO 14001 management system for cadre driving, certified by an independent organization (or equivalent from the European Union member organization registered in the European Union); or with all of themthere, the referrals to the Crossed Driving System are equivalent to those that the AT is able to apply to the full line, - AK provides the chances of the warship according to Kbt.71AK. AT enters into the hunt for a non-previously listed host player, and this hostIf the hijacker is involved with the hosts who have not previously been involved in the project, all the documents related to the host actor must be captured in the hotspots, (5) read-out sheet according to AT Kbt.66 (2) and 66 (6)The statement Kbt. The Croak Driving Predecessors Must Be Conflicting - Koezoes Timeline on Kbt.35 and 424/2017. (XII. AK draws attention to - 11 (1) (4) and Article 13 (3) and (4) of the EDF Regulation, - The language of the timetable is Hungarian, - AKOn the basis of Article 30 (4) of Government Decree 321/2015 (X.30.), the ATK has established the conditions and conditions of the certificate in the case of P1-P2, M1-M2 points, - AK does not make it possible that the winning AT / ATk will bring / create a host organization in the contractor's performance forest, and gold as stated in the Kezzeszerzes document; Point 0-100, - AK applies the Kbt.75 (2) (e) in a row, - AK is the bourgeois and conspirator of the presentations with regard to Kbt.81 (4) - (5) - All times: koezep-european (local) time, - Iranyado law: the oblivious is responsible for the day's power Kbt.vonatkoand the decrees of your vegrehajtos, and the e-mails of the e-shop, and the e-mail of the e-mail: e-mail: Andras Komlodi; I got it: 00228. AT = AT AK = AK CHARACTERCORLORATHY WHAT I CAN KNOW WHAT YOU CAN KNOW Internet address (URL): http://www.hunsail.hu
The bid deadline for Contract notice: Multi-functional buildings construction work was 18 Apr 2019. Bidding is closed.
This tender has been issued by BALATONFÜREDI VÍZISPORT ÉS SZABADID? KÖZPONT NONPROFIT KORLÁTOLT FELEL?SSÉG? TÁRSASÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45211350 - Multi-functional buildings construction work, 45213313 - Service-area building construction work, 45248400 - Landing stages construction work, 45241300 - Pier construction work, 45242200 - Marina construction work, 45243000 - Coastal-defence works.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 31624618. The purchaser document reference is 123735-2019.