Contract notice: Motorway construction works Tender - 27594984
Tender notice from Bulgaria, published on 12 Oct 2018.
Executive Summary
The ??????? „????? ??????????????“ has issued a Tender notice for the procurement of a Contract notice: Motorway construction works in the Bulgaria. This Tender notice was published on 12 Oct 2018 and is scheduled to close on 10 Dec 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 27594984, while the tender notice number is 444614-2018 and Register on the platform.
Object of the contract Motorway construction works Description: Contract notice: Motorway construction works Authority Type: Ministry or any other national or federal authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45233110, 45233110, 71311220, 45233110, 71311220 CPV Description: "Design of contractor for additional design and construction of site: Road I-1 (E-79)" Mezdra - Botevgrad "Lot 2 from km 161 367 to km 174 800" The purpose of this public procurement is: Main Site: Vratsa District A) Supplement. design: 1) Run. of supplement. design (DS), according to the requirements of the unit and the requirements of actingthey currently norm. docks, in volume and content defined in the DS Terms. 2) Upon elaboration of the tech. project by the client is prepared a quantitative value account (KSC) and is valued in accordance with the accepted bid prices for diff. types of work according to the "Table of types of works with offered single prices" and is approved by the engineer after the dog and after the approval of the TA.that there is a new type of work for which no single price is proposed in the Table of Types of Works with Offered Prices, it should be valued at a new price calculated according to the pricing elements stated in the Pricelist The cost-conscious CC must not exceed the value of the cost for the installation work.KSU does not include the value of Dop. costs) 3) Carrying out all the concordances of the completed TP with exp. companies and administrations whose authorization, assistance or opinion is necessary for the fulfillment of the subject of the General Assembly. 4) Executing his / her duties as a designer and performing an aut. supervision during the site and commissioning of the construction in accordance with the current-Бълг. Law No. 3 of 31.07.03 of the Ministry of Regional Development and Public Works to the Territory Management Act for drafting of acts and protocols during the site and Ordinance No. 2 of 31.07.03 of the MRDPW to the Territory Management Act for putting into operation of the construction works in the Republic of Bulgaria and minimum warranty periods for completed construction and installation works, facilities and sites.) 5) Removal at its expense of the shortcomings of TPs established in the course ofscrutiny of inspections by the node and / or the consultant evaluating the project's compliance with the same. construction requirements and Tech. control of part "Constructive" according to the TD, including during the execution of the site 6) Taking responsibility for the quality of the TP, subject of the order during the execution of the page B) Construction: 1) Use of construction works, according to the TP for the construction, approved by the unit, -in accordance with Tech. suggestion to send a general orders, prescriptions and orders in the Order Book and the KSU 2) Supply and installation in the site of the necessary and corresponding to Tech. (3) Manufacture and / or construction of building materials (including mats, including concrete mixtures, reinforcing steel, waterproofing and anti-corrosion mats, asphalt mixtures, products, components, or delivery of the parts / elements and their incorporation into the works 4) If necessary, they will provide terrains for the needs of the site in accordance with the provisions of Art. 38 of the Roads Act - for a temporary site, for production polygons (bases) for the needs of the site, for storing mats and equipment, etc. needs in relation to the performance of the site as established by the Safety and Health(5) If necessary to carry out relocation work, on site, on underground and overground networks and on the ground. 6) Where the site is located outside the territory in which the building is being constructed. Organizing the collection, transportation, disposal and recovery activities of p. waste resulting from the implementation of the activities in accordance with the Bulgarian requirement. law-co 7) Perform Geod. Measurement of the building site base 8) Provide healthy and safe working conditions during the site 9) tests and laboratory tests 10) Drawing up of papers and preparation of a construction report file 11) Participation in the procedure for entering the construction in the project 12) Removal of the deficiencies found in the transferbuilding construction and its acceptance from the node. 13) Gar. maintenance of the construction, incl. removal of defects with guarantee. deadlines set by a contract for the assignment of 14) All other activities required for the subject matter of the order and warranty. maintenance of the construction. The participant in the procedure is required to have a registration in the Central Professional Register of(TSRC) to the Chamber of Builders of the Republic of BULGARIA, according to Art. 3, para. 2 of the Construction Chamber Act, for the execution of Group II constructions, and for non-residents, in analogous registers under the legislation of the Member State in which they are established. is not a legal entity, compliance with the selection criterionshall be proved by each of the persons included in it, who will carry out the respective activity, according to the distribution of the participation of the persons in the implementation of the activities provided in the document / agreement for the creation of the grouping. Where the participant provides for the participation of subcontractors, compliance with the selection criterion shall also be demonstrated by them, according to the type and proportion of the contract they will perform, and-there should be no grounds for disqualification from the procedure. When submitting a tender, the information on the requirement is indicated by the EEDOP participant, in accordance with the instructions for its completion, enclosed with the documentation. 67, para. 5 of the Public Procurement Act, the contracting authority may require the participants at any time to submit all or part of the documents provingthe information specified in the EEDOP when it is necessary for the lawful conduct of the procedure. In these cases, the requirement is evidenced by the submission of a copy of the registration document to the CPRC to the Chamber of Builders of the Republic of BULGARIA pursuant to Art. 3, para. 2 of the Law on Protection of Construction, for execution of constructions of Group II, 1st category. For foreign persons - a similar document proving such a reregistration in a similar register according to the legislation of the Member State in which they are established or equivalent. When signing a contract for performance of the contract, the Contractor shall submit: a copy of the registration document in the CPSR to the Chamber of Builders of the Republic of BULGARIA, 3, para. 2 of the CPS, for execution of constructions of Group II, I-st category, in case the document does notis presented by the order of Art. 67, para. 5 of the Public Procurement Act. A document shall be presented to a foreign person proving that he has the right to perform the assigned activity in the Republic of Bulgaria, including that he has carried out the respective registration under the Building Chamber Act in connection with Art. 112, para. 1, item 4 of the PPL. It is required that the participant in the procedure has achieved a minimum total turnover, on the basis of the annual turnover of the participant, including minimum turnover in the field of road construction - new construction and / or reconstruction, and / or rehabilitation and / or overhaul of motorways (AM) and / or Roads of the National Road Network (WPPs) and / or on streets and / or roads of the Municipal Road Network and / or road facilities to them in the country and / or on roads, -and / or road equipment with equivalent performance abroad. The required speed should be realized over the last three completed financial years depending on the date on which the participant is created or started trading. If the participant is a union that is not a legal entity, the compliance with the selection criterion is evidenced by the participating association and not by each of the personsincluded in it. Where the tenderer provides for subcontracting, compliance with the selection criterion shall also be demonstrated by the tenderer in accordance with the type and proportion of the contract which they will perform and the reasons for the removal from the procedure shall not be available. Where the participant provides for the participation of third parties, they must meet the relevant requirements of the selection, proofwhere the participant refers to their capacity and for them there are no grounds for removal from the procedure. When submitting a tender, the information on the requirement is indicated by the participant in the EEDOP, in accordance with the instructions for its completion, attached to the documentation. According to art. 67, para. 5 of the PPA, the contracting authority may require the participants to submit at any timeand / or part of the documents proving the information specified in EEDOP when necessary for the lawful conduct of the procedure. In these cases, as well as when a contract for performance of the contract is concluded, compliance with the requirement is evidenced by the submission of : 1. bank certificates; or 2. annual financial statements or their components when they are published-is required as well as 3. reference for the total turnover and the turnover in the sphere covered by the order (in free text). Where, for a valid reason, a participant is unable to provide the documents requested by the contracting authority, he / she may prove his / her economic and financial standing by means of any other document the contracting authority considers appropriate.the contractor must be in possession of a valid certificate throughout the term of the contract and, where applicable, apply the equivalent measures. * * 3 - List of staff who will carry out the contract and / or Art. of the managerial staff who will be responsible for the performance, indicating the professional competency of the persons .. Continued from field III.1.3) ... 1 (one) made of themor rehabilitation and / or major overhaul of motorways and / or Roads and / or Roads and / or Roads and / or Roads, and / or road facilities to them in the country and / or on roads and / or on roads. with an equivalent. out of the country. Staff in the implementation of the CMP: B.1. Engineer on "Road" part - 1 (one) number: Prof. Reg. (quasi-one): higher education in the specialty TC or PS or equivalent. Experience: Participation in a team involved in carrying out activities on the "Road" part in at least 1 (one) completed site for a new site and / or reconstruction, and / or rehabilitation and / or major overhaul of motorways and / or roads and / or roads and / or roads of TENs and / or road facilities to them in the country and /or on roads and / or on roads. with an equivalent. harbors outside the country. В.2. Engineer on Constructive part - 1 (one) number: Prof. Reg. (Quad): Higher education in the subject of SSS or PGS or TC or CW or "Construction of transport facilities" or "Railway construction "or equivalent. Special experience: participation in a team related to performing activities under" Constructive "in Minmind 1 (one) completed site for a new site and / or reconstruction and / or rehabilitation and / or major overhaul of motorways and / or Roads and / or streets and /, and / or road facilities to them in the country and / or on roads and / or on road. with an equivalent. harriers outside the country. В.3. Engineer "Quality Control" - 1 (one) number: Prof. Prof. (quad): engineer and / or-chemical engineer, or equivalent. experience: participation in a team involved in quality control and acceptance of the works in at least one (1) completed site for a new site and / or reconstruction and / or rehabilitation and / or overhaul of motorways and / or Roads and / or Roads and / or Roads and / or Roads and / or Roads to and / or Roads and / or Roads, and / or Roads and /on road. with an equivalent. harnesses outside the country. В.4. Safety and Health Co-ordinator (BFA) - 1 (one) issue: Prof. reg. (quasi-one): a professional qualification related to the site, with a completed BAE or equivalent course. experience: participation in a team involved in carrying out safety and health activities in a minimum of one (one) completed site for a new site and / or reconstruction and / or rehabilitation; and/ or major overhaul of motorways and / or Roads and / or Roads and / or Roads and / or Roads and / or Roads to Roads and / or Roads and / or Roads Съборя. with an equivalent. hats out of the country. is a union that is not a law. person, the compliance with the selection criteria by sub-category. (1) and (3) shall be proved by the participating association and not by any of the persons included therein, but for this under subway. 2 - by each person, incl. in it, which will perform respectively. activity according to the distribution of the participation of the persons in execution. of the activities envisaged in the consortium formation document / agreement. When the participant envisages the participation of subcontractors, respectively. the selection criteria are also proved by them, according to the type and the share of the order they will perform, and for itx should not be available. for removal from the procedure. Where a participant provides for the participation of third parties, they must correspond to requirements of the selection criteria for the proof of which the participant refers to their capacity and for which there is no basis. to remove from the procedure Internet address (URL): www.api.bg
The bid deadline for Contract notice: Motorway construction works was 10 Dec 2018. Bidding is closed.
This tender has been issued by ??????? „????? ??????????????“ in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45233110 - Motorway construction works, 71311220 - Highways engineering services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 27594984. The purchaser document reference is 444614-2018.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.