Contract notice: Motorway construction works Tender - 26372904
Tender notice from Bulgaria, published on 01 Sep 2018.
Executive Summary
The ??????? „????? ??????????????“ has issued a Tender notice for the procurement of a Contract notice: Motorway construction works in the Bulgaria. This Tender notice was published on 01 Sep 2018 and is scheduled to close on 08 Nov 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 26372904, while the tender notice number is 381782-2018 and Register on the platform.
Object of the contract Motorway construction works Description: Contract notice: Motorway construction works Authority Type: Ministry or any other national or federal authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45233110, 45233110, 71311220, 45233110, 71311220 CPV Description: ("Technical project design") and construction of "Struma" Motorway, lot 3.2.1, section "Krupnik-Kresna" - left-hand lane ... ( see field II.1.4) The subject of this contract is the designation of a contractor for the design (preparation of a technical design) and construction of an objectStruma highway, lot 3.2.1, Krupnik-Kresna section - left canvas from km 375 860 - 376 000 from lot 3.1 of Struma motorway to km 389 100 and road connections Main site: Blagoevgrad region The object of the public procurement is to design the construction of the construction site "Struma", lot 3.2.1, "Krupnik-Kresna" section - the left canvas from km 375 860 to 376 000 from lot 3.1 of AM "Struma "is a route of about 150 km, located in the southwestern part of the country between Daskalovo road junction (near the town of Pernik ) and the boundary between BULGARIA and GREECE in the village of Kulata.The motorway passes along the Struma River, including through natural landmarks such as the Kresna Gorge, -is part of the TEN-T network The beginning of the section from km 375 860 to km 389 100, eastern variant, is at km 375 860 at about 80 m after the road II-19 "Simitli-Razlog", then it enters the slope and a tunnel with L = 211.4 m is foreseen, and after the tunnel viaduct with a length of about 200 m, then the route takes east direction Smilevo bardo, reaches the village of Poleto, east of it is a viaduct with L = 782, 80 m.-At km 379 470, the road "Borejani" (p. "Field") is crossed at 2 levels and a viaduct with L = 172 m is foreseen and it is continued in the southern direction, while at km 380 440 viaduct passes over the Resena River. From km 380 856 to km 381 992 with tunnel 1 135 m passes under the area inhabited by vultures, then the route continues southwest from the village of Rakitna and parallel to the Rakitna-Mechkul road At km 382 983-begins the Viaduct with L = 580.6 m. From km 383 300 to km 384 300 the track traverses the terrain of the concession for coal mining at Mechkul. At km 384 500 the Mechkul River passes through a Viaduct with L = 133.1 m. The route in a stretch from km 384 500 to km 388 400 continues in the southern direction, parallel to the pipeline, taking into consideration it, without affecting it . Construction of viaducts is planned and at km 384 738 (L = 184, 6 m), km 385 348 (L = 147, 25 m), km 385 839 (L = 184, 6 m) and km 386 586 (L = 754, 4 m) At km 387 620 there is a connection for Stara Kresna and Oshtava. From km 387 800 to km 388 900 with a tunnel passes under the road "Stara Kresna-Oshtava" At km 389 100 passes west of the mineral water deposit At km 376 800 there is an agricultural subsoil and at km 378 394 - agricultural overpass. According to the conceptual project approximationsthe total area of the large facilities is 43 000 m, the gauge is 10, 50 m and 14, 00 m and the total approximate length is 3 600 m. The openings of the facilities range from 15 m to 244 m. The construction project of 3 (three) tunnels, the approximate length of which ranges from 211 m to 1 135 m. According to the 2000 Road Design Standards for Motorways, first and second class roadsthe axle load is 11, 5 tons per axle, as should be the subject of the public procurement. The technical design for the left lane, stretch from km 375 860 to km 389 100 should be developed with gauge G10, 50 m with the following elements: - lanes for movement - 2 x 3, 50 m, - guiding strips 2 x 0, 25 m, - banquet 2 x 1, 50 m, - trenches, - protective gear, -, - additionala truck line - The subject of the public procurement includes the following activities: - Carrying out the author's supervision under Art. 162, para. 2 of the Territorial Planning Act during the construction and commissioning of the construction, - maintenance of the construction, including removal of defects during the guarantee periods, - implementation of information and communication measuresand all other activities necessary for the fulfillment of the object of the public procurement and the guarantee of the maintenance of the construction. The participant in the procedure is required to have a registration in the Central Professional Register of Builders (CPRC) with the Chamber of Builders of the Republic of BULGARIA pursuant to Art. 3, para. 2 of the Law on the Chamber of Builders for the execution of constructions from the 2nd cityfirst category, and for non-residents - in analogous registers according to the law of the Member State in which they are established or equivalent.- If the participant is a consortium which is not a legal entity, compliance with the selection criterion is evidenced by each of the persons included in it who will carry out the respective activity according to the distribution of the participation of the persons in executionand the activities provided for in the consortium formation document / contract. Where a participant provides for subcontracting, compliance with the selection criterion shall be proven by them according to the type and proportion of the contract they will perform and shall not be available for them the reasons for removal from the procedure. When submitting a bid, the information on the requirement is indicated by the participant-in EEDOP in accordance with the instructions for its completion annexed to the documentation. 67, para. 5 of the PPA, the contracting authority may require the participants at any time to submit all or part of the documents proving the information specified in the EEDOP when it is necessary for the lawful conduct of the procedure In these cases the requirement shall be proved byand a copy of the document for registration in the CPSR to the Bulgarian Construction Chamber in accordance with Art. 3, para. 2 of the Law on Construction and Implementation of Buildings of the 2nd Group, 1st Category. For foreign persons - a similar document proving such registration in a similar register according to the legislation of the Member State in which they are established, or equivalent. When signing a contract for the implementation of-the Contractor shall submit a copy of the document for registration to the TSPR to the Chamber of Builders of the Republic of BULGARIA pursuant to Art. 3, para. 2 of the CPA for the execution of constructions of the 2nd group, 1st category, if the document is not presented by the order of art. 67, para. 5 of the Public Procurement Act. A document must be submitted to a foreign person proving that he has the right to perform the assigned activityin the Republic of BULGARIA, including the fact that he has carried out the respective registration pursuant to the Chamber of Builders Act in connection with Art. 112, para. 1, item 4 of the PPA - It is required that the participant in the procedure has achieved a minimum total turnover calculated on the basis of the annual turnover of the participant, including minimum turnover in the field of construction and / or design and / or road engineering -rehabilitation and / or overhaul of motorways (AM) and / or Roads of Roads and / or streets and / or roads on the municipal road network ( TSOs) and / or road facilities to the country and / or roads and / or road facilities with equivalent characteristics outside the country.in the last 3 completed financial years, depending on the date on which the participant was established or started its activity. In the case of unions which are not legal entities, compliance with the selection criterion is evidenced by the participating association and not by any of the persons included in it When the participant provides for subcontracting, the compliance with the selection criterion is a proofbut also by them according to the type and the share of the order they will perform, and for them there should be no grounds for removal from the procedure. When the participant envisages the participation of third parties, they must meet the relevant criteria of the selection criteria, for the proof of which the participant refers to their capacity and for them to not have the grounds for removal from the procedurea. When submitting a tender, the information on the requirement shall be indicated by the participant in EEDOP in accordance with the instructions for its completion enclosed with the documentation. 67, para. 5 of the PPA, the contracting authority may require the participants at any time to submit all or part of the documents proving the information specified in the EEDOP when this is necessary for a lawfulthe implementation of the procedure. In these cases, as well as when signing a contract for performance of the order, the compliance with the requirement is proved by the presentation of: 1. bank certificates; or 2. annual financial statements or parts thereof when required to be published; and 3. reference for the total turnover and the turnover in the sphere falling within the scope of the order (in free text).when, for a good reason, a participant is unable to submit the documents requested by the contracting authority, he can prove his economic and financial standing by means of any other document the contracting authority considers appropriate. description of the selection criteria ": When submitting a tender, information on the requirements is indicated by the EEPOM in accordance with the instructions for its completion, app. to the dock. According to art. 67, para. (5) of the PPL may require the teachers at any time to submit all or part of the documents proving the information specified in EEDOP when this is necessary for the lawful conduct of the procedure. and upon the conclusion of a contract for the execution of the order in accordance with-the requirement is proved by the presentation of: - - under item 1 - a list of services that are identical or similar to the subject of general order, indicating the values, dates and recipients, together with a report for execution. service, - under item 2 - list of the site / business name, identical or similar to the subject of the order, accompanied by good performance certificates containing the value, the date on which it was concludedlocation, type and volume, as well as whether it is complied with in accordance with norm. required, - under item 3 - valid certificates, ed. from accredited persons, for quality control, certifying the correspondence of the goods with the respective ones. standard, the instructor assigned to a contractor must have a valid certificate for the entire duration of the dog's practice and, where applicable, apply equiv. measures, - under item 4 - list of personnelwho will execute the contract and / or the members of the managerial staff who will be responsible for the performance, indicating the professional competency of the persons .. Continued by field III.1.3) "Requested Min. level (s): ... and / or roads and / or roads to them with equally out-of-country maps B.5 Designer under Tunnels Part 1 - Prof. area (quad-j): page engineer, - special experience: it wasoektant of min 1 prepared inv. project for a new road, rail or metro tunnel. Guidance on the implementation of the site: C.1. Engineer on part "Road" - 1 piece: - Prof. area (quad-j): page engineer, - Special experience: participation in a team related to activities under "Road" in min 1 completed site for new site and / or reconstruction, and / or rehabilitation, and / or overhaul of AM and / orand / or on roads and / or on roads and / or on roads and / or on roads and / or roads to and from the road and / or on road equiv. harbors outside the country. В.2. Engineer on Constructive part - 1: - - Prof. area: engineer, - - Special experience: participation in a team related to carrying out activities on part "Constructive" in min. 1 completed site for a new page and / or a riverrehabilitation, and / or rehabilitation and / or overhaul of AM and / or Roads and / or Roads and / or Roads and / or Roads to them in the country; or on roads and / or on roads to them with equiv. harriers outside the country. В.3. Engineer in Geodesy - 1: - Prof. District: Higher Education in Geodesy or Marquis and Geodesy, or equivalent, et al. experience: participation in a team related to the performance of field metering works in min 1 site for new site and / or reconstruction and / or rehabilitation and / or overhaul of AM and / or Roads of Roads, and / or on roads and / or on roads and / or on roads and / or on roads and / or on roads to and from the roads and / harnesses outside the country. В.4. Engineer "Quality Control- 1 work experience: participation in a team related to quality control and acceptance of works in min. 1 completed site for new site and / or reconstruction and / or rehabilitation, and / or major overhaul of AM and / or Roads and / or Roads and / or Roads and / or Roads to Roads and / or Roads, and / or Roads; / or on roads to them with equivwound. C.5. Engineer in part "Tunnels" - 1 piece: - Prof. area (quad): page engineer, - Special experience: To have performed the functions of expert "Tunnels" of min. road, rail or metro tunnel Internet address (URL): www.api.bg
The bid deadline for Contract notice: Motorway construction works was 08 Nov 2018. Bidding is closed.
This tender has been issued by ??????? „????? ??????????????“ in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45233110 - Motorway construction works, 71311220 - Highways engineering services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 26372904. The purchaser document reference is 381782-2018.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.