Contract notice: Motorway construction works Tender - 26305015
Tender notice from Bulgaria, published on 30 Aug 2018.
Executive Summary
The ??????? „????? ??????????????“ has issued a Tender notice for the procurement of a Contract notice: Motorway construction works in the Bulgaria. This Tender notice was published on 30 Aug 2018 and is scheduled to close on 15 Nov 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 26305015, while the tender notice number is 377887-2018 and Register on the platform.
Object of the contract Motorway construction works Description: Contract notice: Motorway construction works Authority Type: Ministry or any other national or federal authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 45233110, 45233110, 71311220, 45233110, 71311220 CPV Description: (Definition of a design contractor) and construction of a site: Struma highway Lot 3.2.2, section "Krupnik - Kresna" left canvas from ... (see field II.1.4) The subject of a public contract (OP) is "Designation of a contractor for the design (construction of a technical design) and construction of an object:Struma Shipyard Lot 3.2.2, Krupnik - Kresna section left canvas from km 389 100 to km 399 500, bypass road of town Kresna part of right canal from km 396 137 (by km of road I-1 / E79 /) to km 401 691.90 397 000 from Lot 3.3 of Struma Motorway, including road connections ". In this sense, the objective of the OP is the RIA to entrust the construction of the Struma Motorway Lot Lot 3.2.2 and road links in the section.the approximate area of the major bridge facilities is 49 000 sq. m. The gauge is 11 m and 14 m and the total approximate length is 3600 m. The openings of the facilities range from 17 m to 302 m. The construction of 4 tunnels is envisaged. their approximate length varies from 171 m to 1, 303 m. the road design standards for 2000 for AM, I and II class roads the dimensional axle load is 11, 5 t / ax. Main Site: Blagoevgrad District The subject of the present procurement is "Designation of a contractor for the design and construction of a site: Strouma Motorway Lot 3.2.2, Krupnik - Kresna "left canvas from km 389 100 to km 399 500, bypass road of Kresna part of right canal from km 396 137 (by km of road I-1 / E79 /) to km 401 691.90397 000 from Lot 3.3 of the Struma Motorway, including road connections. - Section left canvas from km 389 100 to km 399 500 - at km 389 100 the route passes west of the mineral water deposit. From km 389, 600 the route takes southwest direction, at km 390 120 crosses the transit gas pipeline to Greece and up to km 393 200 develops west of it at km 393 240 there is a tunnel L = 200 m, while at the same timebut passes under the pipeline and the route goes south-east. At km 394 530, with a viaduct L = 74, 2 m, it passes over the Vlahinska River and then with tunnel L = 1, 133 m, it goes southwest along the gully, parallel to the road to Vlahi village. At km 398 110 the road to Vlahi crosses and passes north of it, at km 399 000 it crosses again and reaches km 399 500. The section ends at km 399 500, where it flows into the Kresna crossing and the gauge passes to the motorway G29 with two directions of travel, - - part of the road Kresna - a part of the right canal from km 396 137 (by the km of road I-1 / E 79 / km to km 401 691.90 397 000 from Lot 3.3 of Struma Motorway - before the town Kresna leaves the existing road at km 396 137, from where starts the Kresna ride up to km 396 380 tthe aste evolves along the existing road, then leaves it and crosses to the right, crosses the Struma river, passes along the Tisata Reserve and crosses the Struma River again and crosses the I-1 and the Sofia Tower railway line. It then crosses the Vlachinska river, from km 397 500 to km 398 300, developing along its valley. It reaches east of the town of Kresna, then with 2 (two) tunnels with a length of 380 m and 250 m it-crawls. From km 400 000, the route goes southwest and crosses the road to the village of Vlahi, the I-1 road and the Sofia Kulata railway line. From km 399, 500 the Kresna passage (right canvas) joins the left lane and continues with the main gauge D 29 to km 401 691, 90 397 000 from Lot 3.3 of Struma Motorway, where it ends. According to the conceptual design, the approximate area of the major bridge facilities is 49 000 sq. M, gauges11 m and 14 m and the total approximate length is 3600 m. The openings of the facilities range from 17 m to 302 m. The construction of 4 tunnels is foreseen and their approximate length varies from 171 m to 1303 m. According to the design standards on roads from 2000 for AM, I and II class roads the dimensional axle load is 11.5 t / ax. The subject of the public procurement includes the execution of the following activitiesosti: carrying out author's supervision under the procedure of Art. 162, para. 2 of the Territorial Planning Act during the construction and putting into operation of the construction; warranty maintenance of the construction, including removal of defects during the warranty periods; implementation of information and communication measures and all other activities necessary for the fulfillment of the subject of the public procurement and the guarantee-maintenance of the building. The participant in the procedure is required to have a registration in the Central Professional Register of Builders (TSPR) with the Bulgarian Construction Chamber in accordance with Art. 3, para. 2 of the Chamber of Builders Act for the execution of Group II constructions, 1st category, and for foreign persons in analogous registers according to the legislation of the stateWhere the participant is a grouping that is not a legal entity, compliance with the selection criterion shall be evidenced by each of the persons included in it who will carry out the relevant activity according to the distribution of the participation of the persons when performing the activities provided for in the grouping agreement document / agreementsubcontractors, the compliance with the selection criterion is also proved by them, according to the type and the share of the order they will perform and for them there should be no grounds for removal from the procedure. When submitting a tender, the information on the requirement is indicated by the participant in EEDOP, in accordance with the instructions for its completion annexed to the documentation. 67, para.-5 of the PPA, the contracting authority may require the participants at any time to submit all or part of the documents proving the information specified in EEDOP when this is necessary for the lawful conduct of the procedure In these cases, the requirement shall be proved by submitting a copy of the document for registration in the TSPR to the Chamber of Builders of the Republic of Bulgaria, according to Art.3, para. 2 of the Law on Protection of Construction, for execution of second group constructions, category I. For foreign persons, a similar document proving such registration in a similar register under the law of the Member State in which they are established or equivalent. When signing a contract for performance of the contract, compliance with the requirement is evidenced by the submission of: Copy of the registration document-in the CPSR to the Chamber of Builders of the Republic of BULGARIA, according to Art. 3, para. 2 of the CPA, for execution of constructions of group II, first category, in case the document is not presented by the order of art. 67, para. 5 of the Public Procurement Act. A document shall be presented to a foreign person proving that he has the right to carry out the assigned activity in the Republic of Bulgaria, including that he has performed the relevant registrationpursuant to the CPS, in connection with Art. 112, para. 1, item 4 of the PPL It is required that the participant in the procedure has achieved a minimum total turnover calculated on the basis of the annual turnover of the participant, including minimum turnover in the construction and / or design and / or road engineering - new construction and / or rehabilitation and / or rehabilitation and / or overhaul of motorways (AM) and /or on Roads and / or on Roads and / or Roads from the Municipal Road Network (TSM) and / or road facilities to them in the country and / or on roads, and / or of road facilities to them with equivalent characteristics outside the country. The required turnovers shall be realized in the last 3 completed financial years, depending on the date on which the participanthas been or has begun its activities In the case of unions that are not legal entities, the compliance with the selection criterion is evidenced by the participating grouping and not by any of the persons included in it. Where the participant envisages subcontracting, the compliance the selection criterion is also proved by them according to the type and the share of the order they will perform and should not be• Where the participant foresees the participation of third parties, they must meet the relevant requirements of the selection criterion for the proof of which the participant refers to their capacity and for them there are no grounds for removal from the procedure . When submitting a tender, the information on the requirement is indicated by the participant in EEDOP, cin accordance with the instructions for its completion enclosed with the documentation. 67, para. 5 of the PPA, the contracting authority may require the participants at any time to submit all or part of the documents proving the information specified in the EEDOP when necessary for the lawful conduct of the procedure In these cases, as well as at the conclusion of performance contract nand the order, the compliance with the requirement is proved by the presentation of: 1. bank statements or 2. annual financial statements or components when required to be published, and 3. reference for the total turnover and the turnover in the sphere falling within the scope of the contract (in free text) When, for a good reason, a participant is not able to submit the requests requested by the contracting authority-it may prove its economic and financial standing by means of any other document the contracting authority considers appropriate. Continued by field III.1.3) List and short description of the selection criteria: When submitting a tender, the information requirements is stated by the teacher in EEDOP, in accordance with the instructions for its completion, app. to the Doc. According to Art. 67, para. 5 of the Public Procurement Act, the lecturer may require teachers to present at any time all or part of the documents proving the information specified in the EEDOP when necessary for the lawful conduct of the procedure In these cases, as well as upon the conclusion of a contract for the execution of the order, the requirement is proved by the presentation of: * under item 1-List of services that are identical or similar to theone-to-one order, indicating the values, dates and recipients, together with a report for execution. service * according to item 2-List of the site (s) identical with or similar to the subject of the order, accompanied by good performance certificates containing the value, the date on which the posting was completed, location, type and volume, and whether it is complied with in accordance with norm. Required. * under 3-Valid Certificates, Ed. from-accredited persons for quality control certifying the conformity of the goods with the respective products. The standard assigned to the contractor must have a valid certificate for the whole duration of the dog's application and, where applicable, apply equiv. Measures * according to item 4-List of the personnel who will execute the order and / or the members of the managerial staff who will be responsible for the performance, PROCUREMENT III.3) CONTRACT RELATED TO A PROJECT AND / OR PROGRAM FINANCED BY COMMUNITY FUNDS: No. III.1.3) level (s): and / or roads and / or roadways to them with eq. harps out of the country. B.5.Projectant on part "Tunnels" -1pc: Prof. district (quad-j): p. engineer. experience: to have been a designer of min 1 prepared inv. project for new road on the road, railway station. or metro tunnel. C. Raw material in the execution of the site: C.1.Engineer on the part "Road"-1br.: Professor. Area (Qualifiers th): p. Engineer. Special. Experience: participation in team associated with implementing activities in part" Road "in min. One filled object to a new page and st or / or rehabilitation and / or rehabilitation and / or overhaul of AM and / or Roads and / or Roads and / or Roads and / or Roads to them in the country and / or roads and / or road saor th them with eq. Paper-ki outside sides. V.2.Inzhener in part "Construction" -1br.: Professor. area (Qualifiers th): p. engineer. Special. Experience: participation in team associated with implementing activities in part "Construction" in min. 1 completed site for new site and / or rehabilitation and / or rehabilitation and / or overhaul of AM and / or Roads and / or streets and / and / or road saor th to them in the country and / or roads, and / or pplace them together with eq. (Cz): Higher education in Geodesy or Marquis and geodesy, or equivalent - Specialization in Geodesy - Experiences: participation in a team related to the performance of the field measurement works in min 1 completed site for new site and / or reconstruction, and / or rehabilitation and / or major repairs of AM and / or roads from the FPM and / or on streets and / or on roads and / or on roads and / or roads to and / or on roads and / or on roads to them with equiv. paperwork: Special experience: participation in a team involved in quality control and acceptance of page work in min 1 completed project for new site and / or reconstruction, and / or rehabilitation and / or overhaul-AM and / or Roads and / or Roads and / or Roads and / or Roads and / or Roads to Roads and / or Roads and / or Roads to them with equiv. harnesses outside the country. В.5.Engineer on part "Tunnels" -1pc: Prof. district (quad-j): p. engineer. experience: to have performed the functions of expert "Tunnels" of min. 1 completed site for a new road, rail or subway tunnel. Internet address (URL): www.api.bg
The bid deadline for Contract notice: Motorway construction works was 15 Nov 2018. Bidding is closed.
This tender has been issued by ??????? „????? ??????????????“ in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45233110 - Motorway construction works, 71311220 - Highways engineering services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 26305015. The purchaser document reference is 377887-2018.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.