Procurement Summary
Country: Poland
Summary: Contract notice: Metal-spraying machinery
Deadline: 04 Feb 2019
Posting Date: 24 Dec 2018
Other Information
Notice Type: Tender
TOT Ref.No.: 29430089
Document Ref. No.: 568027-2018
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
42665000 - Metal-spraying machinery
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Metal-spraying machinery
Description: Contract notice: Metal-spraying machinery
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 42665000, 42665000
CPV Description: Metal-spraying machinery.
Stand for thermal spraying with assembly and commissioning.
The subject of the order is the purchase of a thermal spraying station with assembly and commissioning of 1 item, with the following parameters and equipment:
Main Site: ul. Romana Rybarskiego 1, 32-640 Zator, POLAND.
1. Shot blasting cabin:
- housing of the machining chamber and engine room
- lining of the cab interioriny a protective lining, eg rubber plates,
- blasting and dust removal chamber in one device:
vertical air intake with pneumatic feeder,
rubber suction hose,
separator with charging hopper
high pressure diesel filter for dust and abrasive suction and abrasive cleaning, made on the basis of patron filter cartridges regenerated with impulses of compressed airAir, air capacity max 11, 000 m / h, dust removal efficiency on new cartridges min. 37 m / s,
Collector of compressed air min. 0.3 m / min
Jet cleaning machine with automatic control unit for abrasive blasting
Abrasive tank capacity min 10 dm
Estimated time of processing from one hopper maximum max. Not less than 40 min
Electrical installation: lightingengine room lighting, emergency lighting circuit, additional cabinet supplying these circuits
Compressed air installation for chamber operation
Gun for blowing cleaned objects
Needle-diaphragm abrasive valve,
Pneumatic control valve,
Filter-compressed air reducer,
Pressure head with boron or silicon carbide nozzle,
Reducer of compressed air from the drainage- Abrasive type: one of the above - corundum, glass beads, shot,
Amount of abrasive in the circulation min.8 l
2. Robot with manipulator 1 set - number of axes 6
- horizontal range: min 2.0 m
- cabin dimensions min. L x B x H: 5.0 x 2.5 x 2.5 m
- repeatability of the position: / -0.07 mm,
- load capacity: min. 70 kg,
- operator panel,
- security module,
- communication interface,
- protective coverallsealing against external working conditions
- 2-axis tilt and turn positioner, capacity min. 500 kg
- adjustment of the partition (endstops, safety / emergency switches),
- control system of 1 piece (control cabinet controlling the operation of all devices included in the station, safety system and circuit breaker system, ability to manage and programall peripheral devices included in the station, the ability to program process parameters from the robot's touch panel,
- start-up and configuration
3. Thermal arc spray device - a system for applying metal coatings from metal alloys by thermal spraying 1 kpl
- power min. 400 A
- wire feeding system located insidethe control panel, instead of the spray gun head, whose construction and equipment with special nozzles allows the spray jet to concentrate and give suitable velocity to the molten particles,
- wire cleaning function from dust and dust before entering coaxial cables
- measurement indicators: E-Stop- stopping, feeding to the initial state of power (resetting), pwire sluice without arc ignition, switches for maintaining and dropping compressed air in circulation,
- power controllers: voltage control, current control
- digital LED displays - light emitting diode indicating arc voltage and arc current also after the spraying process
- controls and switches : measurement of wire speed during spraying, shower timevoltage control switch, current control switch, setting the airflow before arc ignition, setting the air flow after turning off the arc, adjusting the display image stop current values after turning off the arc,
- - power source - 3 phase DC power source, voltage between 18-40 V, intensity min. 100 - max 400 A
- possibilitycontrol and setting of all functions from the wire feeder panel
- a cooling fan built into the power supply with a function of automatic switching on only when the device requires it.
4. Ventilation system
- filter device
evaluation criteria
1. The maximum number of points possible to get 100.
2. During the examination and evaluation of the offer, the Contracting Party may request explanations from the tenderersregarding the content of submitted offers.
The Awarding Entity shall consider the offer that is not subject to rejection and obtain the highest number of points awarded within the framework set out of criteria No. 1 and 2.
Evaluation method:
1. The most advantageous offer in the price range (the lowest price) = 80 points
2. The most advantageous offer in the scope of the guarantee (the longest guarantee) = 20 points
3. Sum of criterion 1 and kryterium No. 2 will be the decisive factor.
Criterion and evaluation method
Criterion price - 80%
Evaluation method: price ratio of the lowest offer to the price of the tested offer, we multiply by 80
Criterion: guarantee - 20%
Evaluation method: ratio of the test offer's guarantee to We multiply the guarantee for the longest by 20
The order can not be given to entities affiliated personally or capitalally with the Ordering Party.a personal or capital related litter means the interrelationship between the beneficiary or persons authorized to incur liabilities on behalf of the beneficiary. activities related to the preparation and conduct of the contractor selection procedure and the contractor, in particular: a) participating in the company as a civil partnership or a company partner,
b) having at least 10%shares or shares, unless the lower threshold is not required by the law or has not been determined by the MA of the CEA; c) acting as a member of the supervisory or management body, proxy, plenipotent, d) remaining in a marriage, in a relation of kinship or affinity in a line straight line, second degree affinity or second degree affinity in the lateral line or in an adoption ratiocare, guardianship or guardianship.
1) In case of doubts and the need for making inquiries clear, please send an email to:
[email protected]. Each query and the right answer will be made public via the website: www.bazakonkurencyjności.gov.pl
2) The Ordering Party reserves the right to annul this procedure regarding the selection of the supplier without giving a reason3) It is envisaged the possibility of introducing significant changes to the contract concluded as a result of the contract award procedure in the scope of the order delivery date, in the case of unexpected circumstances preventing the order from being processed within the deadline indicated in this inquiry.
4) No supplementary procurement is planned .
5) Not expectedsubmitting partial offers.
Internet address (URL): www.protech-wkg.pl
Documents
Tender Notice