Object of the contractMemory-expansion equipment
Description: Contract notice: Memory-expansion equipment
Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 30236100, 30236100, 30236100
CPV Description:
Main site: Budapest
On the metro line M2 there are 22 pieces of 5 carriages to be installed on the M2 metro line. AM type mounting bracket. There are two internal cameras on this metro car, and a driver-driven motorTwo more rear-facing cameras are located next to the driver's cab. In the case of 22 subway carriers (110 cars), there are 308 cameras. By installing a new camera system on the M2 metro line, installing a new camera system that has a charging capacity of 15 days.
Kizaro Causes: There is no time scheduler in the system, it can not be useda commercially-owned entity with whom the Kbt. Section 62 (1) - (2) the limited number of excluded reasons will survive. Section 74 (1) (b) of the Rules of Procedure must exclude from time to time a borrower, a subcontractor, a prospective economic operator against whom the above-mentioned exclusionary reasons cause the same.a: The applicant shall, in the meantime, prove in advance that he or she is not a party to the one-off European Deed Records Document. Section 62 (1) to (2) For the exclusionary reasons, please see the Kbt. Section 69. (4) to (7) shall be based on the basis of the application for a periodic part-session. [321/2015 (X.30.) K. r. 1-8, 10 and 12-16.-]. The justifications for exclusionary grounds shall be valid if thea registered economic operator shall certify that he or she is in compliance with the requirements of the test. [321/2015 (X.30.) K. r. 27-44.] A 321/2015 (X.30.) K. r. Article 15 (1) stipulates that only the one-off European Case Study Document shall be submitted by the Provider in a suitably substantiated sub-business or mass organizationand Kbt. The reasons for the exclusion of the reasons set forth in Article 62 (1) to (2) are in the affirmative.
A 321/2015 (X.30.) K. r. According to Section 15 (2) of the Act, the Applicant shall only disclose the validity of the subcontractors who are not eligible for legal aid. - 67. - If the name of the economic operator named above is changedthe application must be accompanied by a copy of the bill of lading filed with the bill of lading and the certificate stamped from the building of the building, in a simple parcel of land [321/2015. (X. 30) K. r. Section 13]. A 321/2015. (X. 30) K. r. In the case of Section 6 (1), the economic operator must provide the appropriate European co-authoring document form-in the case of exclusionary grounds, a set of databases may be granted, which are subject to verification of the exclusionary grounds, the date of this decree. (X. 30) K. r. Article 6 (2) of the basic document of the European co-authoring document must be supported by the body which is entitled to issue the certificate. Who isFor reasons of unsatisfactory statements, the date of validation must not be earlier than the present date. Section 65 (1) (c)]:
The contractor shall not be able to complete the contract if he / she does not have the CXIII. toerveny altal, with police permission issued by the author of the GTO.
Preliminaryverifies: with the introduction of a one-off European Dealership Document. The economic operator must only declare himself in the one-eyed European Dealership Document that he or she is in compliance with the applicable requirements, and the appropriate test procedures shall not be required to be heard or resumed, that is to say, the one-off European Compendium Document IV. You just have to put an alpha point on it, tno more than this.
Verified mode for the time spent in the chat room (to be a guest in the chat room): you must submit the permission. If you are able to obtain a license for a free electronic database, you can check the appropriate online subscription license in the one-time European Case Study Document
Verify the mod_update for the caller:
P1: A 321/2015. (1) (c) of the Decree of the Minister of Finance (X.30.) Of the Government of the Republic of Hungary on the basis of the total turnover of the subsector on the basis of the previous three merger revolutions, Ajanwhen the data was sent to the letter or when it started to work when these data were available. (1) to (3) of Article 67, it shall be required to prove in advance that it complies with the requirements of the cash and cash equivalents set out in the license.-The Provider will accept a simple statement from the host, ie it must indicate in the european coercion document form that it complies with the requirements of the test or not, as indicated in the form IV. you will not be able to provide the correct information.-the Kbt. Section (4) - (8) of Section 69 shall be based on the basis of his / her application pursuant to Article 19 of Decree 321/2015 (X.30.) Korm. The P1 suitability test applies to 321/2015. (X. 30.) Korm. Order Section 19 (3). The Applicant is eligible as the Applicant. According to - 65 (7) - (8), the capacity of an organization may also be reduced.
1.The submitting document(with the contents of this leaflet): Kbt. Section 66 (2), (4), (6) (a), (b) (including in the case of non-content), (5) (Section 68, Subsection (4)), Kbt. Section 65 (7) (including in the case of non-content), in case of an organization requesting the capacity, the resources are available to the crew, cego people, the right of the right holder, the co-workers from time to time of the Kbt. 35, as well as the one-sided European Dealership Document. It is also necessary to attach a statement to the contents of this handbook.2. The brochure provides the complete documentation of the co-procurement documents electronically, unlimitedly and completely free of charge, free of charge (www.bkv.hu/ Purchasers). Documentation is subject to the terms of this document, and the deadline for submitting the documents to the lowest number of users or the subcontractor named in the timeframe must be electronically up to the time limit set. The expedition to find the documents is a pocket-sized touchscreen. The documents of the buyer's documents and the confirmation caseyes, I.1. or the accompanying attachment of the aforementioned items described in clause I.1 shall be set out in the foregoing. in the fullest extent possible, it can be made without restriction.3 If a new entrant draws a new economic operator into the scheme, please read the following terms and conditions. Section 71 (6) based on the basis of this economic operator's view of full-fledged Hionypotlasi potential.4. The offeror shall complete the contractual fullment of the Penzuegyes and the economic, technical and professional qualifications and proof of the 321/2015 (X.30.) Korm. Paragraph 28 (3) has been strictly defined by the 5th timeand at work weekdays from 8:00 pm to 8:00 pm onwards, from 8:00 to 14:00 hours. The BKV Zrt.Strategiai and Beszerzesi Igazgatosag, Beszerzesi Főoszt-ly, Department of Iranyitasi Budapest, VII. kerkaelet, Akacfa utca 15. III. floor B303. room.6.When the time limit is given in all days, the time limit specified in each orab will be set at koezep-european time.7.AK does not impose a time limit. Section 81 (4) - (5) .9. The local consultant may provide the opportunity to dispose of the appropriate time schedules. The Qualifier requests this application to the e-mail at
[email protected], up to the 5th working day before the deadline. 10.A IV.2.6. 30 days per day shall be paid during the 1st month of the month-does not apply the Kb. Section 75 (2) .b. e) point 12.FAKSZ: dr. Gara Richard (registration number: 00041) .13.AK will raise awareness of the Kb. (9) of the CC, according to which the winning bidder will be released from the contract of probation (released from the probationary period) if the probation period has elbiralasarolI do not expose you to an unexpected or unexpected event because of the fact that the author's wish or completeness would not be fun or because of such a charity you would have the right to resign or terminate your contract. If the winner is unable to prove the pool specified in the present point, the betting backer of the contractor will be entitled to unlawful armsand as stated in the Civil Code, the winning bidder is trying to put the full karate of the time-winner - resulting from the controversial obedience - 144. We would like to point out that due to the characterization of the TED character, the co-author's utmutato contains further conjunctions related to the commotion that ignores letting the weather turn out to be annoyingguilty.
Internet address (URL): http://www.bkv.hu
Directive: Classical Directive (2014/25/EU)