Object of the contractMarine patrol vessels
Description: Contract notice: Marine patrol vessels
Authority Type: Regional or local authority
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 34511100, 34511100
CPV Description: Marine patrol vessels.
Delivery of one brand new vessel with a length of 15.0-20.0 m. - Reference Number: 3 / ZP / 2019
The subject of the order is to build and deliver one brand new vessel with a length of 15.0-20, 0 m with equipment, according to the description of the subject of the order constituting Annex No. 1 to the Terms of Reference.
Main Site: KaszubskiSquadron of the Border Guard in Gdańsk - Westerplatte, ul. Sucharskiego 1, POLAND.
The subject of the order is the construction and delivery of one brand new vessel with the length of 15.0-20.0 m with equipment, in accordance with the description of the subject of the order constituting Annex 1 to the Terms of Reference. The unit will be designated for: performing the regulatory service, fullBorder guard duty, escorting vessels with dangerous goods, carrying out activities related to critical infrastructure of the state, conducting intervention and patrol activities, conducting search and rescue operations within the SAR service, supporting fire fighting operations of other units, supporting firefighting activities of port facilities and carrying out related activities with protectionsea).
1) The Contractor shall submit a statement, valid as of the day of submitting bids, in the form of a single document drawn up in accordance with the specimen of the standard form set out in the European Commission's implementing regulation issued on the basis of art. 59 par. 2 of Directive 2014/24 / EU and art. 80 par. 3 of Directive 2014/25 / EU, referred to as the Single European Order Document (EAT). 2) The Contractor must submit a bid bond in the amount of PLN 65, 000 before the deadline for submission of tenders. 3) The Ordering Party does not anticipate the orders referred to in art. 67 sec. 1 point 7 of the Public Procurement Law Act 4) The contractor, which relies on the abilities or situation of other entities, must submit together with the offer an obligation of these entities to give him the necessary resources for the needs of the order. Underthe third litter must meet the condition of participation in full and not be subject to exclusion from the proceedings. 5) According to art. 13 para. 1 and 2 of Regulation (EU) 2016/679 of the European Parliament and of the Council of 27.4.2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data and the repeal of Directive 95/46 / EC (General shielding anglno data) (Official Journal L 119 of 04.05.2016, page 1), hereinafter referred to as "RODO", the Contracting Authority informs that: a) the administrator of personal data obtained in the proceedings in question from physical persons is the Chief of the Maritime Department of the Border Guard, 80-563 Gdańsk, 35 Oliwska St., POLAND;
b) the inspector of personal data protection in the Maritime Border Guard Unit is the Head of the Security Departmentformacji,
[email protected], phone 48 585242060;
c) above personal data will be processed on the basis of art. 6 par. 1 lit. c OF THE ROPE for the purpose related to the proceedings for the said public order; - d) recipients of the above-mentioned personal data will be persons or entities to whom the documentation of proceedings based on art. 8 and art. 96 para. 3 of the Pzp;
e) Acts datapersonal data will be stored, in accordance with art. 97 par. 1 of the Act, for a period of 4 years from the date of completion of the contract award procedure, and if the duration of the contract exceeds 4 years, the retention period covers the entire duration of the contract;
f) the obligation to provide personal data of natural persons participating in the proceedings directly related to these persons is a statutory requirement of approxin the provisions of the Act, related to participation in the public procurement procedure; the consequences of failure to provide specified data result from the Public Procurement Law.
Other information required by the RODO can be found in the Terms of Reference.
6) Ordering party based on art. 93 par. 1a of the Public Procurement Law, provides for the possibility of annulment of proceedings in the event of not convening an avgdeductions that were to be used to finance all or part of the order.
Internet address (URL): http://www.morski.strazgraniczna.pl/mor/zamowienia-publiczne-1/zamowienia-publiczne