MTA ENERGIATUDOMÁNYI KUTATÓKÖZPONT has floated a tender for Contract notice: Machines and apparatus with individual functions. The project location is Hungary and the tender is closing on 06 Jan 2020. The tender notice number is 578181-2019, while the TOT Ref Number is 38694326. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Machines and apparatus with individual functions

Deadline : 06 Jan 2020

Other Information

Notice Type : Tender

TOT Ref.No.: 38694326

Document Ref. No. : 578181-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : MTA ENERGIATUDOMÁNYI KUTATÓKÖZPONT
Office Name: MTA Energiatudományi Kutatóközpont
Address: Konkoly-Thege Miklós út 29-33.
Town: Budapest
Postal Code: 1121
Contact Point: Kovács Zsuzsanna

Phone: +36 13959159
Fax: +36 13959293
Hungary
Email :kozbeszerzes@energia.mta.hu
URL :http://www.energia.mta.hu

Tender Details

Object of the contract
Machines and apparatus with individual functions

Description: Contract notice: Machines and apparatus with individual functions

Authority Type: Regional or local Agency/Office
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 31640000, 31640000, 31640000, 31643100
CPV Description: Machines and Apparatus with Individual Functions

Linear Accelerators

Ion Source Accelerator in 2 Pieces - GINOP

Reference Number: EKR001308462019

1 (one) new particle accelerator system (ion source accelerator) is procured and installed by the MTA Energy Science Research Center. In-service training of equipment use on-site trainingstaff, conducting my probe session, and co-op testing in retaliation

Main Site: 2462 Martonvasar, Hrsz. 1715/14

Adaptation Contract Purchase of 1 (one) new, 35-70 keV rectified output energy proton ion source (Proton Ion Source, PIS) with Low Energy Beam Transport (LEBT) systemof the MTA Energy Science Research Center, main parameters:

- 35-70 keV corrugated output energy proton ion source (PIS)

- low energy beacon conducting system (LEBT), normalized total beams emittance should not exceed 1 π mm.mrad, the non-normalized beacon emittance should not exceed 200 π mm.mrad

- max. 3x600A Tapegyseg

- 1 klt. Isolatorsronika with controller

- closed system cooling system (with optimized power for the part assigned)

- vacuum system (10-5 mbar)

AT is responsible for the factory process, ber. on-site delivery, on-site installation, on-site training for use (2 persons / 8 o / 7 pm), conducting my probation session [7 (week) days], co-op testing in the process of submitting.The technical description should be included in the Co-Procurement Documents (KD)., activity, person, type, or origin or production processReference is made exclusively to Koezb. for the purpose of defining the unambiguous nature of the term toertent, the term "or equivalent" must always be understood in addition to the pronoun!

.) Article 46 (3) of Government Decree (KR) hIn addition to the designation of a referenced standard, technical license, technical prescription, technical journal, the term "or equivalent" must be understood at all times. under the power of time (AK)In the case of demonstrating non-specific products, tools, or solutions, any demonstration of equivalence by appropriate means shall be the responsibility of the AT. doc., description of the products, tools, images ortechnical description, which contains all the data and information on the basis of which AK can determine the suitability of all products, tools, solutions contained in the technical description, properties. Any doubts about specific products, tools, or solutions must be fully disseminated by the AT to prove equivalence.it should provide clear and verifiable evidence of which I am submitting.

I can only suggest new tools, in the case of used tools the suggestion is Kbt. Section 73 (1) (e) is fundamentally volatile. The rooms must be licensed and certified for Mo to be marketed and must comply with applicable legal requirements.

You must declare that any work, supplies, services or any work performed by or on your AT or any VAT (s) thereof is to be accepted by any third party . copyright, patent, trademark, industrial design, or any other form of industrial property protection.

The economic operator against whom the Kbt. is not eligible may not be an AT, a sub-contractor, or a certificate of suitability. There are any of the grounds for exclusion set forth in - 62 (1) and (2).asi mod:

1. For AT:

Preliminary certification: on 321/2015. Pursuant to Article 1 (1) of Government Decree (X. 30.), AT, upon submission of the offer, AT must confirm in advance by attaching a single European Co-Procurement Document (EEKD) made available to the electronic form. Article 62 (1) and (2) are subject to the exclusion grounds. Koezoes timelattetin case of all cases, the EEKD for each koezoes AT, and the name kueloen-kueloen in the electronic form will be added by the authorized AT afterwards.

Confirmation of Kizaro Reasons: prior to making solo doentes, AK shall, within a reasonable time, KR - 8, - 10 es 12-13. By submitting certificates, declarations in accordance with -- 1 and 2 of this Act, that they are not subject to the provisions of the Civil Code. Exclusion reasons specified in - 62 (1) - (2). For the organization (s) providing the capacity (including sub-contracting entities in the certificate of aptitude):organizations. In the case of a Koezoes suggestion, this statement must be made in the name of all koezoes AT, kueloen-kueloen, in the EEKD for that koezoes AT. - 67 (3) or - 3 (2) of the CR, if the required qualifying requirements are waived (also) based on the capacity of the body (s) or person (s) )to be found, the EEKD must also be associated kueloen-kueloen for each of the affected organism (s) or individual (s). In this case, the declaration (s) shall be attached to the organization or person concerned, and more specifically, kueloen-kueloen, in the event of a change in the electronic form at any time during the course of the AT koezoe suggestion.Pursuant to paragraph (1), in respect of a sub-contractor or other entity (person) who certifies the suitability, AT is only able to submit the KD in the offer at the time of the offer. The grounds for exclusion listed in Article 62 (1) to (2) are inappropriate and no further justification is sought. For subcontractors not certifying suitability:

AT to declare koe in EEKDIt shall include any subcontractor (s) already known at the time the offer is submitted, which does not rely on the capacities of the subcontractor (s), but which shall be excluded from performance. In the case of Koezoes suggestion, this statement must be made in respect of all koezoes AT, and more specifically kueloen-kueloen, in the EEKD for that koezoes AT. In terms of subcontractors that do not take the opportunityin ssag certification, AK does not pass EECD II.

Preliminary justification: AT must, at the time of the offer, attach Article 15 (2) of the KR to Kbt. (4) of Article 67 that he does not take into account the performance of the contract in accordance with the Kbt. Article 62 (1) and (2) exclude sub-contractors. In Koezoes suggestion, the statement is from the visualsAuthorized AT makes the electronic form validation form, while the other koezoes AT statement must be attached to the KD resume model declaration form, it must be accompanied by an electronic smear sheet. According to Article 69 (4):

1. The procedure is 424/2017. (XII. 19.) On the basis of KR, there was a start-upATAS.

2nd The official language is Hungarian: KD point 8

3. Administrator. organ. letreh .: KD point 9

4. Koezoes Door .: KD Point 10

5. Business secret: KD point 12

6. Non-Hungarian Doc .: KD Point 13

7. Hianypotlas: KD Point 21

8. Data not available in garden currency: KD item 29

9. K AT - and any capacity organization (s) - verifies the details on www.e-cegezetzek.hu. No Mo. lthatched farmer. In the case of operators, the offer shall be accompanied by an AT extract and a summary of the company (s), or the host organization (s). The legal system of the country of residence of the resident company is based on an equivalent document: KD -32

10. Attached are statements in the offer Alairo, alimony eligible person (s), alimony or chamber lawyeralairas countersigned with os: Item 33 KD

11. Variable entry or data entry: KD item 34

12. Copyright: KD Point 37

13. Form Coevs: KD 42 points

14. Site Beat: KD Point 53

15. Additional information: KD Item 55

16. Professional Advice: KD Point 56

17. AK calls attention to Kbt. Section 36 (1).

18. AT must declare the Kbt. According to Article 65 (7), AK calls attention to Kbt. Article 65, paragraph 7, last sentence. AT must declare the Kbt. 66 (2).

20. Kb must be marked in aj. 66 (6) (a) and (b). Statements must also be made explicitly in the case of negative content. AT must declare the Kbt. According to Article 67 (4).

22. For the quote, Felolmust contain a sheet of iron on which Kb must be provided. Information pursuant to Article 68 (4). AK a Kbt. With regard to Article 73 (6) (c), he shall prescribe in this call for proposals, in respect of each item, to specify in advance an offer (s) exceeding the net offer price for the particular item - for the particular item -This item is:

- for item 01, net 300, 000, 000 HUF, that is, Net Thousand Million HUF

- for item 02, net 430, 000, 000 HUF, or net Naughty Thirty Thousand Million HUF

for the given item - the above is above the bid, AK for the offer - for the given item - Kbt. Section 73 (1)(e) would be fundamentally unpublished. AK does not apply Kb. Section 75 (2) (e) and the Kbt. -- 81 (4) to (5)

25. For AT, the Kbt. Section 134 para. Knife. test: base: net aj. ar, dare: 0.5% / day, max. 30 days, max: 15%

Meghius. testb: base: net aj. ar, because they are: 10%

Jogkoev: stand up, up

Yeah. security: dares: 5%

27. K draws attention to the fact that the conditions of eligibility and their attestation have been more strictly defined (P / 1 and M / 1) by official tenderers. All koelts that arise in connection with the offer are charged to AT. In point IV.2.6), the duration of the periodic test allowance is 60 calendar daysFAX 0: dr. Suevoeltős Andras (00170)

III.1.1) continued:

AK calls attention to Kbt. Section 74 (2) para. see also KR 1-16. -. For the exclusion reasons, Koezb. certificates created prior to the commencement may be retrieved (used) for as long as the contents of the certificates and data contained therein are valid. AK - Unless proven otherwise - Data is ATrelevant kueloen arrow.-nelkelel charged



III.2.2) continued: AT the contracted full body min. 24 months to see a full-fledged cuddly cat. FU. (5%) of the project (Article 8 of the draft), and in the case of bitter performance or non-performance. affordable (article 7 of the draft) is proven.


Internet address (URL): http://www.energia.mta.hu

Documents

 Tender Notice