Expired Tender Poland ICB TOT Ref. 22586950

Contract notice: Machinery for working rubber or Tender - 22586950

Tender notice from Poland, published on 19 Apr 2018.

Executive Summary

The POLITECHNIKA WROC?AWSKA has issued a Tender notice for the procurement of a Contract notice: Machinery for working rubber or plastics in the Poland. This Tender notice was published on 19 Apr 2018 and is scheduled to close on 30 May 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22586950, while the tender notice number is 168834-2018 and Register on the platform.

Key facts

Summary
Contract notice: Machinery for working rubber or plastics
TOT Ref. No.
22586950
Document Ref. No.
168834-2018
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
19 Apr 2018
Bid deadline
30 May 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Machinery for working rubber or plastics
Description: Contract notice: Machinery for working rubber or plastics
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 42994000, 42994000, 42994000, 43415000
CPV Description: Machinery for working rubber or plastics.
Foundry moulds.
ZP / BZP / 122 / 2018-Zad.Nr 1 Injection station consisting of a computer-controlled injection molding machine; Zad-2 Injection station consisting of an injection mold.
Reference Number: ZP / BZP / 122/2018
The subject of the orders is the delivery of equipment for Polymer Materials Processing Laboratory as part of the project "Complex GEO-3EM Energia Ekologia Edukacja "Zad.Nr 1 Injection station consisting of a computer-controlled injection molding machine, Task No. 2 Injection station consisting of an injection mold. The object of the order includes: delivery, assembly, installation, commissioning and checking the correctness of operation at the place designated by the Ordering Party A detailed description of the subject of the order can be found in Annex 3 a / b to the ToR-- OPZ.Szczeg.zapres of performance Zał.Nr 2 model agreement.
Main Site: Building GEO-3EM, ul. Na Grobli 13, Wrocław.
The subject of the orders includes: delivery, assembly, installation, commissioning and checking the correctness of operation at the place designated by the Employer. CPV code: 42994000-0 Machines for processing rubber and plastics.
The detailed description of the order is in Appendix No. 3and to SIWZ OPZ.
The detailed scope of execution of the subject of the order can be found in the contract template, constituting Annex No. 2 of the ToR.
1. The Contractors, who:
1) can not be subject to exclusion, are not subject to exclusion based on art. 24 section 1 points 12-23 and (additionally, the Contracting Authority foresees the exclusion of the Contractor) art. 24 sec. 5 points 1 and 8 uPzp, ie: 1.1.with respect to which liquidation was opened, in the system approved by the court in the restructuring proceedings, it is foreseen that the creditors will be satisfied by the liquidation of their property or the court ordered the liquidation of its assets pursuant to art. 332 par. 1 of the Act of 15/15/2015 Restructuring Law (Journal of Laws of 2015, item 978, 1259, 1513, 1830 and 1844) or whose bankruptcy was announced, with the exception of the Contractor, who after the announcement of the bankruptcyhe has concluded an agreement approved by a final court order, if the agreement does not provide for the satisfaction of the creditors by liquidating the assets of the bankrupt, unless the court ordered the liquidation of his property in accordance with art. 366 para. 1 of the Act of 28 February 2003 Bankruptcy Law (Journal of Laws of 2015, item 233, 978, 1166, 1259 and 1844); 1.2. who violated obligations regarding tax payments, fees or contributions-for social or health insurance, which the Purchaser is able to demonstrate by means of appropriate evidence, except in the case referred to in paragraph 1 point 15, unless the Contractor has paid taxes, fees or social security or health insurance contributions with interest or fines or has entered into a binding agreement regarding the repayment of such receivables.
2) meetą conditions for participation in the proceedings regarding:
2.1. competences or entitlements to conduct a specific professional activity, if it results from separate provisions, the Ordering Party does not set a specific condition in this respect.
2.2. economic or financial situation, the Employer does not set a specific condition in this respect.
2.3. technical or professional ability The Ordering Party does not designate pan ignoble condition in this respect.
3. The Awarding Entity may at any stage of the proceedings consider that the Contractor does not have the required capacities if the involvement of the Contractor's technical or professional resources in other Economic Contractors' business may have a negative impact on the implementation of the order. Report of statements and documents:
1. To confirm compliance with the conditions for participation in the proceedingsu and no grounds for exclusion, the Contractor should submit the following statements and documents valid as at the date of submitting bids:
1.1. A statement in the form of a single European order document hereinafter referred to as "EED" drawn up in accordance with the standard form set out in the Implementing Regulation of the European Commission and completed in the places indicatedfrom the Employer in Annex 4. The information contained in the EED is a preliminary confirmation that the Contractor is not subject to exclusion and meets the conditions for participation in the procedure.
1.2. In case of reliance on resources of other entities referred to in art. 22a uPzp the Employer in order to assess whether the Contractor, relying on the abilities or situation of other entities, will have the necessary resourcesand to the extent enabling proper execution of the public order and assessment of whether the relationship between the Contractor and these entities guarantees effective access to their resources, the Ordering Party requests documents (in particular by presenting the commitment of these entities to provide him with the necessary resources to fulfill the order), which specify in specificity: range of available WContractors of the resources of another entity, the manner of using the resources of another entity, by the Contractor, while performing the public order, the scope and period of participation of another entity in the performance of the public contract.
1.3. Contractor who refers to the resources of other entities referred to in art. 22a uPzp in order to demonstrate the lack of grounds for exclusion and fulfillment - inthe extent to which they relate to their resources - the conditions for participation in the proceedings are submitted to EED regarding these entities. • Continued:
1.4. In the event of a joint application by the Contractors, the EAT shall be submitted by each of the contractors applying for the order. These documents confirm compliance with the conditions of participation in the proceedings and no grounds for exclusion to the extent that each of thenawcow shows compliance with the conditions for participation in the proceedings and no grounds for exclusion
3. The ordering party shall call the Contractor whose bid has been the highest rated, to submit within the prescribed, not shorter than 10 days, the current date as of the day of submitting the following declarations or documents: In order to confirm the lack of grounds for exclusion of the Contractor in the circumstancesthose referred to in Article 24 uPzp. The Employer requests the following documents:
3.1. Information from the National Criminal Register in the scope specified in art. 24 sec. 1 points 13, 14 and 21 of the Public Procurement Law, issued not earlier than 6 months before the deadline for submission of tenders.3.2. a certificate from the competent head of the tax office confirming that the Contractor is not in arrears with the payment of taxes issued nnot earlier than 3 months before the deadline for submission of bids, or other document confirming that the Contractor has entered into an agreement with the competent tax authority regarding repayment of such receivables with possible interest or fines, in particular obtained legally permissible, postponement or installment payment of overdue payments or suspension in full of the implementation of the decision-competent authority 3.3. certificate of the relevant organizational unit of the Social Insurance Institution or the Agricultural Social Insurance Fund or other document confirming that the Contractor is not in arrears with payment of social security or health insurance contributions issued no earlier than 3 months before the deadline for submission of offers or other documentthat the Contractor has entered into an agreement with the competent authority regarding the repayment of such receivables, together with any interest or fines, in particular obtained the legally required exemption, postponement or installment payment of overdue payments or suspension in its entirety of the decision of the competent authority.3.4. excerpt from the relevant register or from the Central Register and Information on Go Activitiesif separate regulations require an entry in the register or records, in order to confirm the absence of grounds for exclusion under Art. 24 sec. 5 point 1 of the Public Procurement Law
3.5. the Contractor's statement that he has not been the subject of a final court judgment, or a final administrative decision on default of taxes, fees or social security or health insurance premiums orto issue such a verdict or decision on documents confirming the payment of these claims together with any interest or fines or to enter into a binding agreement in repayment of these debts
3.6. the Contractor's statement about the lack of a decision against him as a preventive measure and a prohibition against applying for a public order 3.7. Contractor's statement about not being paidem taxes and local fees, referred to in the Act of 12.1.1991 on taxes and local fees (Journal of Laws of 2016, item 716);
4. The Employer demands from the Contractor, which relies on the abilities or situation of other entities on the terms specified in art. 22a uPzp, present for these entities documents referred to in items 3.1-3.7 of this chapter.
5. If the Contractor isand the registered office or place of residence outside the territory of the Republic of Poland, instead of the document referred to in point 3 items 3.1-3.4 of this chapter, submits:
1. The contractor remains bound by the submitted offer for 60 days. The period of being bound by the offer starts as soon as the deadline for submission of tenders expires.
2. The offer must consist of:
2.1. documents and statements referred to in Chapter VI pkt 1 SIWZ
2.2. the Contractor's tender form, attachment No. 1 to the ToR,
2.3. demonstrating the reservation of information constituting a trade secret in accordance with point 7 of chapter XI (if applicable),
2.4. power of attorney in accordance with point 3 of Chapter XI of the ToR (if applicable).
2.5. The Ordering Party requests, together with the offer, that the Contractor should provide a description of the offered item, specify the technic specificationthe offered equipment allowing to determine compliance with the requirements of the Employer completed and signed Annex 3a / b to the ToR.
3. Contractor within 3 days from the date of posting on the website the information referred to in Article 86 para. 3 uPzp, will provide the Employer with a declaration of belonging or non-affiliation to the same capital group as referred to in art. 24 usVol. 1 p. 23 of Polish law. Along with the submission of a statement, the contractor may provide evidence that links with another Contractor do not lead to distortion of competition in the procurement procedure (in the case of joint application for contracting by contractors) the statement shall be submitted by each of the contractors jointly applying for the order).
Internet address (URL): http://przetargi.pwr.edu.pl/
Directive: Classical Directive (2014/24/EU)

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Machinery for working rubber or plastics was 30 May 2018. Bidding is closed.

This tender has been issued by POLITECHNIKA WROC?AWSKA in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 42994000 - Machinery for working rubber or plastics, 43415000 - Foundry moulds.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 22586950. The purchaser document reference is 168834-2018.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Technology and Equipment in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.