Contract notice: Machinery for working rubber or Tender - 20340256
Tender notice from Poland, published on 05 Feb 2018.
Executive Summary
The LARKIS SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ has issued a Tender notice for the procurement of a Contract notice: Machinery for working rubber or plastics in the Poland. This Tender notice was published on 05 Feb 2018 and is scheduled to close on 13 Mar 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 20340256, while the tender notice number is 045746-2018 and Register on the platform.
Key facts
Summary
Contract notice: Machinery for working rubber or plastics
Object of the contract Machinery for working rubber or plastics Description: Contract notice: Machinery for working rubber or plastics Authority Type: Body governed by public law Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 42994000, 42994000, 42994000 CPV Description: Machinery for working rubber or plastics. Choosing a contractor for the delivery and installation of a brand new device, i.e. a multi-component (two-component) injection molding machine with full accessories, equipment and software The procedure is carried out in the request for proposal with the estimated value of the so-called order. above the EU thresholds, which exceeds the PLN equivalentthe net amount of EUR 221 000.00, i.e. excluding tax on goods and services (VAT). A. Multi-component injection molding machine with clamping force min. 50t- max. 160t * Min. tool height - 250 mm. * * Distance between plates: min. 500mm - max. 1000mm. * Opening stroke: min. 300 mm - max. 600 mm. B. The injection molding machine must have at least the following equipment: * Rotary table: min. 0 items max. 4 items - the item will adddotted, it is not absolutely required. * * Heating zones divided by half: min.12 - max 16 - Euromap 14. * Control in the form of nozzles - pneumatic closing: min. 2 max. 8 circuits - element in the range of circuits additionally scored, absolute minimum required two circuits. * * Central computer enabling control of all processes on the device along with the software.* Central ejector control of ejectors on both moving table stations causing automation of the process. * Interface between the injection molding machine and the peripheral device EUROMAP 67.1 / AN-146. * Modern injection molding machine, with touch panel, enabling graphs and analyzes. * * Possibility of programming movements and parameters graphically and parametrically. * * Service in Polish, ddocumentation in Polish, documentation of peripheries in Polish. * Hydraulic injection - with energy saving system / pump controlled with servo drives /. Cooling system consisting of 8 rotameters. Injection molding machine equipped with water cooling system. * Possibility of injection in a hinged form - an additionally scored item, it is not absolutely required. * * Toolede for injection molding in the mold dividing plane, with manual lifting and leveling of the injection unit level. * Injection machine equipped with a programmable vacuum sensor and a controllable valve for the vacuum, with the possibility of monitoring during operation. * Injection molding machine; in Ethernet, USB ports, LPT port. * Thermostat for selected technologies. / LSR, Termoplasty, Guma /.8 x inputs and 8 outputs. * * The ability to control the handling. * * The extensive version of the software with the ejector control after opening the mold / the ability to perform differentiated sequences of ejector movements /. The ability to control the process depending on technology / LSR, Thermoplasts, Rubber /. * Possibility of connecting the injection pressure sensor in the mold with the possibility of pressure control-injection to selected technologies / LSR, Thermoplasts, Rubber. * * The ability to perform simultaneous movements on the machine. C. The injection molding machine must be equipped with three technologies (LSR, Thermoplasts, Rubber). Any of the technologies may be the basic system of the injection molding machine, while the other ones may be supplied. 1 Technology of thermoplastics * The plasticizing system resistant to abrasion and corrosion when using filled materialsabove 30% glass fiber. * Screw diameter min. 20 - max 55mm. * Temperature control range up to 420 - C. * * Technology covering the entire thermoplastic range - programming and control. * * Automatic feed delivery, * Process control in the program. 2 LSR technology * Resistant plasticizing system for abrasion and corrosion when using high filling materials, eg with silicates. * Diameter of the screw min. 20 max 55mm. * Technology covering the entire range to LSR - programming and control. * Temperature control range compatible with technology. * Static mixer. * Block for connection of dispensing valve. Dye additives. - Material pressure regulator. Dispensing valve. * Nozzle Herzog pneumatically closed with the nozzle tip unscrewed for seal replacement, cooled. * * Feeding aautomatic raw material additions in percentage according to technology. * process control in the program. 3) Rubber technology * Plasticizing system resistant to abrasion of abrasion and corrosion when using high filling materials eg; silicates. * Diameter of the screw min. 20 max -55mm. * Snail made in bimetallic technology, Sleeve made in bimetallic technology. * Technology covering the wholestop to Rubber software and control. * * Automatic delivery. raw material. * Process control in the program. Contractors may participate in the proceedings, who are not subject to exclusion from the procurement procedure, and contractors are excluded from the contract award procedure, who are related by capital or person to the ordering party, but through capital links or personal feeunderstand the interrelationship between the orderer or persons authorized to incur obligations on behalf of the contracting authority or persons acting on behalf of the contracting party related to the preparation and conduct of the contractor selection procedure and the Contractor, consisting in particular of: * * participating in the company, as a civil partnership or company personal, * having, at least10% of shares or shares, * acting as a member of the supervisory or management body, proxy, plenipotentiary, * * remaining in a marriage, in a straight or in relationship relation, second degree affinity or second degree affinity in a sideline or relationship adoption, care or guardianship. The contractor must be in an economic situationor financial means allowing for the execution of orders Internet address (URL): www.larkis.pl Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Machinery for working rubber or plastics was 13 Mar 2018. Bidding is closed.
This tender has been issued by LARKIS SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 42994000 - Machinery for working rubber or plastics.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 20340256. The purchaser document reference is 045746-2018.