Expired Tender Poland ICB TOT Ref. 31472858

Contract notice: Machine tools operated by laser Tender - 31472858

Tender notice from Poland, published on 12 Mar 2019.

Executive Summary

The POLITECHNIKA WROC?AWSKA has issued a Tender notice for the procurement of a Contract notice: Machine tools operated by laser and machining centres in the Poland. This Tender notice was published on 12 Mar 2019 and is scheduled to close on 12 Apr 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 31472858, while the tender notice number is 114224-2019 and Register on the platform.

Key facts

Summary
Contract notice: Machine tools operated by laser and machining centres
TOT Ref. No.
31472858
Document Ref. No.
114224-2019
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
12 Mar 2019
Bid deadline
12 Apr 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Machine tools operated by laser and machining centres
Description: Contract notice: Machine tools operated by laser and machining centres
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 42610000, 42610000
CPV Description: Machine tools operated by laser and machining centers.
ZP / BZP / 042/2019, Supply of high power laser system for remote machining, large-scale
Reference Number: ZP / BZP / 042/2019
1. The subject of the order is the delivery of high-power laser system for remote large-scale processing as part of the needs of the "International Center for Excellence in Manufacturing Technologies and Applica" project.tions (ICEMTA) International Center for Excellence in Manufacturing Technology and their Applications. "The system includes: - Process cabin, - 6-axis robot, - Laser generator, - Galvoskaner head, - Welding head with weld depth sensor, - 3D scanner for robot navigation.
Main Site: Place of delivery: Building B4, Łukasiewicza street 5, Wrocław, POLAND
1.1 The subject of the orders includes:delivery, assembly, installation, commissioning and instruction and validation of operation at the Employer's office.
1.2. CPV code: 42610000-5 laser-controlled machine tools or machining centers
1.3. A detailed description of the subject of the order can be found in Attachment No. 3 to the OP OP.
The detailed scope of the subject of the order is included in the contract template, constituting Annex No. 2 of the ToR.
2. The required deadline for the implementation of the subject of the contract is up to 24 weeks from the date of the contract, as the starting date of delivery. The ordering party prefers to shorten this period in the tender evaluation criteria.
2. 1. The details regarding the date and conditions of the subject matter of the order can be found in the model contract, constituting Annex 2 to the SETC 3. The Contracting Party declares that the subject of thisthe order was co-financed from the European Regional Development Fund under the Regional Operational Program of the Lower Silesian Voivodship 2014-2020 project: "International Center for Excellence in Manufacturing Technologies and Applications (ICEMTA) International Center of Excellence in Manufacturing Technology and their Applications", No. project: RPDS.01.01. 00-02-0002 / 18.
4. In accordance with Article 93paragraph. 1a uPzp, the Awarding Entity foresees the possibility of cancellation of this tender procedure if the funds coming from the European Union budget and non-recoverable funds from the European Free Trade Agreement (EFTA) Member States, which the Employer intended to allocate for the whole or part of the order, have not been granted hime.
1.O Contractors may apply for the order, who: 1) are not subject to exclusion based on art. 24 sec. 1 point 12-23 and (additionally, the Contracting Authority foresees the exclusion of the Contractor) art. 24 sec. 5 points 1 and 8 uPzp, ie: 1.1. in relation to which the liquidation was opened, in the system approved by the court. In the restructuring proceedings, the creditors are expected to meet the liquidationhis estate or the court ordered the liquidation of his property in accordance with art. 332 par. 1 of the Act of 15/05/2015 Restructuring Law (Journal of Laws of 2018 item 149 with later amendments) or whose bankruptcy was announced, with the exception of the Contractor who, after the bankruptcy, concluded an arrangement approved by a valid court order, if the arrangement does not provide for satisfying creditors by liquidating assetsbankrupt, unless the court ordered the liquidation of his property in accordance with art. 366 para. 1 of the Act of 28 February 2003 Bankruptcy Law (Journal of Laws of 2018, item 398, as amended),
1.2. which has violated obligations regarding tax payments, fees or social security or health insurance premiums, which the Employer is able to demonstrate by means of appropriate evidence, except in the case of whichreferred to in paragraph 1 point 15, unless the Contractor has paid the tax due, fees or social security or health insurance contributions with interest or fines or has entered into a binding agreement regarding the repayment of these receivables.
2) meet the conditions for participation in the proceedings regarding: 2.1. competence or entitlements to conduct a specific professional activity, if it results from separate przepisow. The ordering party does not set a specific condition in this respect.
2.2. economic or financial situation. The ordering party does not set a specific condition in this respect.
2.3. technical or professional capacity. The Ordering Party sets a non-standard condition in this respect. The Ordering Party considers the condition to be fulfilled if the Contractor demonstrates that:
2.3.1 has implemented duly completed inlast 3 years before the deadline for submission of bids, and if the period of business is shorter in this period, at least 2 supplies of high-power laser system with a value of minimum PLN 1 500 000.00 * gross each delivery. * * in the event that the value of the order (contract) is specified in a different currency than in Polish zlotys, the Ordering Party will convert this value into PLNon the basis of the average exchange rate of the zloty in relation to foreign currencies specified in Table A of the National Bank of Poland exchange rates as of the date of publication of the Contract notice in the Official Journal of the European Union. The average exchange rates are available at the following Internet address: http://www.nbp.pl/.
2. The Contractor may, in order to confirm compliance with the conditions referred to in point 1.2) sub-item2.3. of this chapter, where appropriate and in relation to a specific order, or a part thereof, rely on the technical or professional capacity or financial or economic standing of other entities, regardless of the legal nature of the legal relationship he has with it. The Employer at the same time informs that the "relevant situation" referred to above will occur only inif the Contractor, which relies on the abilities or situation of other entities, proves to the Ordering Party that, when performing the order, it will have the necessary resources of these entities, in particular presenting the commitment of these entities to give him the necessary resources for the needs of the order. The Contracting Authority will assess whether it is made available to the Contractor by other entitiestechnical or professional capacity or their financial or economic situation, allow the contractor to demonstrate compliance with the conditions for participation in the proceedings and examine whether there is any grounds for exclusion referred to in art. 24 sec. 1 item 13 22 and par. 5 points 1 and 8.
cont.
If the technical or professional capacity or economic or financial situation of the entity making availableego resources, do not confirm the Contractor's compliance with the conditions of participation in the proceedings or are subject to the exclusion grounds for these entities, the Employer will demand that the Contractor, within the time limit specified by the Employer:
1. replaced this entity with another entity or entities or
2. undertook to personally perform the relevant part of the order, if it shows technical capabilities or fromor the financial or economic situation referred to in point 1.2) of section 2.3 of this chapter, respectively.
List of declarations or documents. Submitted documents with an offer:
1. To confirm the fulfillment of the conditions for participation in the proceedings and the lack of grounds for exclusion, the Contractor together with the offer should submit the below-mentioned statements and documents valid as of the date of the submission of offers
1.1. A statement in the form of a single European order document, hereinafter referred to as an EED made in accordance with the standard standard form specified in the European Commission executive regulation only in electronic form with a qualified electronic signature (according to Annex 4 to the ToR). The information contained in the EAT is a preliminary confirmation that youthe Contractor is not subject to exclusion and meets the conditions for participation in the proceedings.
1.1.1. The contractor fills up the EMS by creating an electronic document.
1.1.2. The Employer makes available to EED prepared on the basis of the ESPD (European Single Procurement Document) tool, constituting Annex 4 to this SIWZ (.zip file).
1.1.3. The contractor on the website https://ec.europa.eu/tools/espd uses serwisu enabling the EED to be prepared by the Ordering Party.
1.1.4. In order to create an electronic EAT - Contractor:
- selects the appropriate country / language,
- selects "I am a contractor",
- selects the option "import ESPD" and reads the ESPD file (from Annex 4 to the SIWZ - EAT - .zip) - .xml file,
- proceeds further in accordance with the instructions provided on the site that allows you to fillreuse and re-use of ESPD.
1.2. In the case of reliance on the resources of other entities, referred to in art. 22a uPzp the Employer in order to assess whether the Contractor, relying on the capacities or situation of other entities - will have the necessary resources to the extent that allows proper execution of the public order and assess whether the relationship between the Contractor and these entities is guaranteedreal access to their resources, the Ordering Party requests documents (in particular by presenting the commitment of these entities to provide him with the necessary resources for the order), which specify in particular: the scope of resources of another entity available to the Contractor, the manner of using resources of another entity, by the Contractor, when executing a public order and fromaccor and period of participation of another entity when performing public order.
1.3. Contractor who refers to the resources of other entities referred to in art. 22a uPzp in order to demonstrate the absence of grounds for exclusion against them and fulfillment in the scope in which their conditions of participation in the proceedings are referred to as submitting to JEDZ regarding these entities
1.4. In the case of co-applying for orders by the Contractors, EAT is submitted by each of the Contractors applying for the order. These documents confirm compliance with the conditions for participation in the procedure and no grounds for exclusion to the extent that each of the Contractors demonstrates compliance with the conditions for participation in the proceedings and no grounds for exclusion. The Contractor remains bound by the submitted offer for 60 days.The period of being bound by the offer starts as soon as the deadline for submission of tenders expires.
2. Form of the offer:
2.1. the offer will be prepared in Polish language,
2.2. the offer and the statement referred to in art. 25a uPzp, including a single document (EAT), shall be drawn up, under pain of nullity, in electronic form and shall be provided with a qualified electronic signature. The offer must be submittedwith:
3.1. documents and statements referred to in Chapter VI point 1 of the ToR (with the electronic form and bearing a qualified electronic signature) and respectively in the announcement - chapter III.1.2) point 1 of the List of Documents;
3.2. Contractor's tender form filled out in electronic form and bearing a qualified electronic signature Annex No. 1 to the ToR;
3.3. demonstrating the reservation of information constituting company secret in accordance with point 10 ch. XI SIWZ (if applicable), retaining the electronic form and bearing a qualified electronic signature;
3.4. power of attorney (if applicable). The power of attorney must be submitted in electronic form bearing an electronic qualified signature. However, if the Contractorand will have only a power of attorney in writing, he submits them in the form of an electronic statement of conformity of a copy, excerpt or copy with the document presented, which the notary provides with a qualified electronic signature (Article 97 - 2 of the Notary Public). Then an offer in electronic form should be accompanied by a copy of the power of attorney prepared by a notary public in electronic form.
3.5. description of the subject of the order of the technical specification allowing to determine compliance with the requirements of the Employer presented in Annex 3 to the Terms of Reference, together with any Information for Contractors filled out in electronic form and bearing a qualified electronic signature Enclosure No. 3 to SIWZ OPZ.
Internet address (URL): http://przetargi.pwr.edu.pl/

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Machine tools operated by laser and machining centres was 12 Apr 2019. Bidding is closed.

This tender has been issued by POLITECHNIKA WROC?AWSKA in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 42610000 - Machine tools operated by laser and machining centres.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 31472858. The purchaser document reference is 114224-2019.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Technology and Equipment in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.