NKM ÁRAMHÁLÓZATI KFT. has floated a tender for Contract notice: Lithium accumulators. The project location is Hungary and the tender is closing on 21 Oct 2019. The tender notice number is 444366-2019, while the TOT Ref Number is 36512500. Bidders can have further information about the Tender and can request the complete Tender document by Registering on the site.

Expired Tender

Procurement Summary

Country : Hungary

Summary : Contract notice: Lithium accumulators

Deadline : 21 Oct 2019

Other Information

Notice Type : Tender

TOT Ref.No.: 36512500

Document Ref. No. : 444366-2019

Competition : ICB

Financier : Self Financed

Purchaser Ownership : -

Tender Value : Refer Document

Purchaser's Detail

Purchaser : NKM ÁRAMHÁLÓZATI KFT.
Office Name: NKM Áramhálózati Kft.
Address: Kossuth Lajos sgt. 64-66.
Town: Szeged
Postal Code: 6724
Contact Point: Seres György

Phone: +36 625655652127
Fax: +36 62568000
Hungary
Email :seres.gyorgy@nkm.energy
URL :https://www.nemzetikozmuvek.hu/

Tender Details

Object of the contract
Lithium accumulators

Description: Contract notice: Lithium accumulators

Authority Type: Utilities entity
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 31434000, 31434000, 31155000, 31156000, 31200000, 51112000, 31434000, 31155000, 31156000, 31200000, 51112000
CPV Description: Lithium accumulators.

Inverters.

Interruptible power supplies.

Electricity distribution and control apparatus.

Installation services of electricity distribution and control equipment.

Litium-ion akkumulatoros energiatarolo letesitese

Reference Number : EKR001160332019

Litium-ion akkumulatoros energiatarolo letesitese Mako-Maroslele koezepfeszueltsegű halozat vegen a II.2.4) pontban, es a koezbeszeTechnical Documentation as per Technical Specification

Main Site: Foeldeak, kuelteruelet 0130/23



One (ie Quantity: 1) of 500 kVA power, with a minimum capacity of 1600 kWh (below, operating experience on power 250 kWh) capacity), lithium-ion batteries need to be validated to save energy, which is useful for solar energyito small-power plant to deal with subnet effects caused by power

The energy storage should be connected to a KOeF / KIF transformer slave KIF distributor

The most important parts of the energy storage:

- the base of the enclosed epuel (s)

- of the fire seal ek),

- cooling and heating climatic system,

- in the area of energy and 4 quartersadjustable inverter (s),

- batteries,

- auxiliary power supply system,

- drainage equipment, including property fire protection equipment,

- Central Controller along with custom hardware,

- software and hardware related licenses.

Bidding does not accept used or demo equipment royalties, ie the royalties must be newB.C. No demolished, used or seruated material or kessuels may be completed.

The contractor must provide the following documents during the contract performance period: - Certificates of the installed equipment,

- Installation in the installationprotocols for preventive testers,

- manuals for instructional personnel,

- manuals for manuals,

- installation, technical documentation,

- manuals for software,

- documentation and word

Operator`s Manual and Maintenance Manual.

Energy Saver must be suitable for the following manualModifying Modes: Disconnected Modes; Ideal uezemmod; 22 kV grid voltage regulation; Compensation for barrels; Line Load Balancing; Equalization of Small Power Plant Producers; Network Capacity Management; Possibility of system opening support; Opportunity for one-on-one work with smart grid equipment.

key in power saving and related systems, which includes:

- preparation of detailed design plans (including preparation of technical design documentation, obtaining of special permits, installation of data for recommendation), - installation of equipment the ground floor, the delivery of the kessuel shells, the befoplacement of glalo epuelet (s) and equipment, communication links and related documents, data on related documents Acceptance of bidding power,

- completion of your on-site tests test documents and notebooks atadasat Acceptance of the Bidder`s Capacity for Performance),

- provision of professional education (including organization of education, preparation of educational materials and manuals, proficiency in knowledge and certification of knowledge), - certification of knowledge Analyzing events related to artworkcase study, review of the needs and problems encountered in the support process, and the steps taken to manage and / or resolve them). (X.30.) Korm. R. - 46. (3)

The detailed technical description, quantityCo-procurement documents Technical description c.

In the process, there can be no promoter (AT) / koezoes AT /, sub-contractor (AV), and no economic operator against whom Kbt. Any of the exclusion grounds set forth in Article 62 (1) - (2) shall apply. Article 74 para. (1) excludes AT, AV, and / or AT from the procedure. thethe organization certifying its suitability, which is subject to the authority of exclusion grounds; who is excluded from the procedure in the course of the procedure.

The exclusion grounds are not subject to prior approval by the AT / koezoes ATs / and, where applicable, the economic operator certifying suitability in the form of the Single European Co-Procurement Document (EEKD - ECR form) ) to prove, aGovernment Decree 321/2015 (X.30) II. . Time Forces (AK) calls attention to Kbt. 41 / A. -- (1), (3) - (5), - 64, es a.

For AVs that do not take the certificate of aptitude, Kbt. Section 67 para. - 15 (2) of the Cr. Based on this, the AT has to declare that it does not accept the Kbt. 62. - (1) - (2) withoutAV (in the form of an ECR form). 64.

AK a Kbt. Paragraphs (4) - (6) of Article 69 are based on the AT, which is considered to be the most advantageous from the point of view of trade, with an appropriate time limit to fire, inviting the submission of non-substantiated certificates required by the procedure.

AK can doent before making the lezaro doentes procedure, not only the most favorable AT, but also the definite number of next most favorable ATs in the order of sales call the certificates in.

that he is not subject to any of the following grounds for exclusion:

- established in HungaryThe reasons for exclusion of T are contained in Act 321/2015. (X. 30.) (hereinafter referred to as "Kr.") Shall be justified in accordance with the provisions of Article 8,

The justification of the reasons for the exclusion is in accordance with Articles 12-16 of the Cr.nt gb), the Kbt. Section 62 (1) para. (k) Please provide with content as described in sub-paragraph (k) (AT) (or declare the owner of the property in accordance with - 3 (38) (a) to (b) or (d) of TVLIII of 2017) (in the form of an ECR). With regard to the exculpatory justifications, the provisions of - 1 (7) of the Cr.you must declare whether a variation registration procedure (in the form of a negative declaration) is in progress (in the form of an ECR). In the event of an ongoing listing procedure, please attach to the AT trial offer an admission request submitted to the company and a certificate of its registration by the company. 35th- (2a); 41 / A. - (1), (3), (4), (5); 69. (11a). 67. - (1) - (3), a 321/2015. (X.30.) Korm. R. In accordance with Sections 1 (1) and 2 (5), the AK also accepts the simple declaration of the economic operator (AT, the entity providing the capacity), stating that the provisions of Annex IV are sufficient in the EEKD.

Submission of the following documents is excludedarolag AK expressly related to this, Kbt. 69. -- (4) - (6) b. based on base:

P / 1. No. 321/2015. (X.30.) Korm. R. Section 19 (1) para. (b), AT attaches its own or its predecessor`s statement to the tender caller in accordance with the last 3 closed business year accounting laws (if the host country`s law requires the country of incorporation to be collated). IfAK garden reports are available on the Ceginformation Service website, AK reports are verified by AK, and reporting on the site is not required.

If AT is P / 1. he does not have the document referred to in point (c) because he has begun a test session after the beginning of that period, is entitled to certify. AK is required to establish the AT`s financial and economic capacity if the estimated net sales of the co-op supplies (energy storage equipment installation) are equal to or greater than the net investment of $ 250, 000, 000., installation and installation

AKdraws attention to Section 19 (3) of the Cr. 41 / A. -- (1), (4) - (5), - 65 (7) - (8), (11) - (12), - 67 (3), 69 (11) - ( 11a)

1) The offer must be submitted exclusively electronically via the EKR system (www.ekr.gov.hu) and crossed! Please note that in the EQF, simple electronic statements of documents / statements, ie non-electronic formsPlease submit all available statements in scanned .pdf file format! language is hungarian. If any doc. for non-Hungarian language linking, try to submit it in the AT Hungarian translation as well. K AT accepts translations.

3) Buckets for Koezoes suggestion. need a consortium endorsement for koezoes AT

4) Additional tales: Kbt. According to - 56.

5) AK does not require a commission commissioner. Article 74 (2) may exclude from the procedure an AT who does not need to provide a national banana. the AT who is suggesting a pedigree that does not need a national banana. No. 307/2015. (X.27.) Korm. R. Article 5 is also appropriate. need:

- Read Sheet (EKR Form)

- Kbt. Article 66 (2)Art. (EKR form)

- Kbt. Section 66 (6) para. (a) and (b) (Must also include a Neutral content arrow!)

- Kbt. Section 65 (7) para. arrow. (also with negative content) - underpinned by docs not required by Kbt., KD and Technical Specifications

- professional suggestion: xls. tablecloths and strips

- technical adDocs - Identification of Alairas Cimpeldany / Alairas (AT, Certificate of Suitability) train.)

- arrow for data management. 8) AK the Kbt. Section 71 of the Commission. hianypotlast and Kbt. Section 71 (6) para.

9) AK 30 days is written down in IV.2.6) in one monthtari for days. Provisional Test Benefit for the Provisional Case: 424/2017. (XII.19.) Korm.r. Section 31 (1) - (2) according to Article II.14.

10) Items III.1.2) and III.1.3) -P / 1, M / 1-M / 2. and eligibility criteria for inclusion in the official record of Qualified ATs.ubbak.

11) Refer to M.2.1. The professional referred to in point (a) above is required to communicate in Hungarian at the advanced or native language level both in writing and in the room, or to provide translators throughout this period of interpretation with the learner in question in the context of non-written and in-room communication. applicatio. Kbt. 75th- (2) (e) subject to paragraph II.14 (KD) of the KD

13) Time of delivery: CET

14) If the host of the AT, AV, as of Yes. Pursuant to Article 69 (11), if you choose to prove a breed, you have to declare which breed you want to justify and keep this breed. free in Hungarian available at11) Iranyado Legislation: Kbt., 307/2015. (X.27.) Korm.r., 321/2015. (X.30.) Korm.r., 424/2017. (XII.19.) Korm.r., Ptk., 266/2013. (VII.11.) Korm.r

16) Point Boundary: The upper limit of the points that can be awarded in order to evaluate the content of the reviews is also 0-10 points. Method: 1. flip-flip reverse gold flap, 2. flip-flopont: straight gold. Yes. Section 76 (10) para. on the basis of the detailed description of the methods the KD holds.

17) Reason for excluding: 1 piece of equipment for installation, it is very important to install the equipment properly, integrally and to guarantee and warranty claims, so the designer, wore responsibilitycannot be shared with suggestions

18) FAX: Vince Daka (ls: 01105)


Internet address (URL): https://www.nemzetikozmuvek.hu/

Documents

 Tender Notice