Expired Tender Hungary ICB TOT Ref. 29475399

Contract notice: Lighting equipment and electric Tender - 29475399

Tender notice from Hungary, published on 26 Dec 2018.

Executive Summary

The MAGYAR ÁLLAMI OPERAHÁZ has issued a Tender notice for the procurement of a Contract notice: Lighting equipment and electric lamps in the Hungary. This Tender notice was published on 26 Dec 2018 and is scheduled to close on 21 Jan 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 29475399, while the tender notice number is 572820-2018 and Register on the platform.

Key facts

Summary
Contract notice: Lighting equipment and electric lamps
TOT Ref. No.
29475399
Document Ref. No.
572820-2018
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
26 Dec 2018
Bid deadline
21 Jan 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Lighting equipment and electric lamps
Description: Contract notice: Lighting equipment and electric lamps
Authority Type: Other
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 31500000, 31500000, 31532000, 38562000, 31500000, 31532000, 38562000
CPV Description:
Parts of lamps and light fittings.
Stroboscopes.
Acquisition of wool technology designers_Eiffel
Reference Number: EKR000929482018
Purchase of stage wool technology designs by Hungarian Allami Opera House and Erkel Synthesis workshop and probacentrum resz
Main Site: 1101 Budapest, X. keruelet Kőbanyai ut 30.
A fictional synagogue of wool technicianseslamezos would be purchased by the Hungarian Allami Opera House and Erkel Szinhaz's new workshop and probacentre in the framework of the six-year data drafting agreement, according to the terms and technical specifications stipulated in the Kezzeszerzesi documents. handling units, Betaplalas cabineteny, Lighter LED LED AS RGBAW, LED Light Profile Robotic Lamp, LED Coloring Rotofoam Wash Wash, Connectors, Projectors, Work Signals, Digital Signage Monitor
Varying Timer for Echoezezers, Connecting Workshops at the scheduled time - to hold an instructorl, with vealite beallitas. The flip flops are not suffocated by the prophetic eschat. It is up to 3 people in the insurance room to give up the waiting time for up to two working days, at 8:00 am and 16:00 pm for the duration of the event. Article 65 (10), paragraph based on the prophecy presupposes that fIn the case of enti products, you should wait for the tutor (koezoes scheduler) to teach you. The appropriate conditions for these tasks should not be compromised by the capacity of the organization or person in charge, and these tasks should not be subordinated to the full set.
A 321/2015. (X. 30.) on the basis of Article 46 paraor (c) an item of goods or origin specified in a commodity code or an artefact of a particular farmer, or a reference to a ticket, patent, activity, person, type, or specific origin or manufacturing process; besides the phrase,
In the case of equal-sized solution, the equivalence of the equivalence of the equation is the task of the timekeeper. The equator must be certified by any appropriate eschat. Any pertinent ideos can be in kueloenoese on the technical dossier, statement, certificate, or any of the instructionsn, technical documentation, statement from a recognized accredited certification body / audit organization. The snippet of snippets associated with the current news items must be distributed by the timekeeper to the entire dog, which must be accompanied by unambiguous and verifiable evidence that aldasas of allitias.n the alpha must be scaled up with the name, type, production, place, and the data from which the equation can be found. the files are in the form of a coezeboardthat a subscriber, sub-subcontractor, and not eligible for a proper real-time certificate is a farmer with whom Kbt. Article 62 (1), and (2), excludes any of the grounds listed in paragraph (2) above.(Ver. 74 (1) (b) of the CCP).
True Modal:
In the case of the Kezzeszerzesi, the appropriate and the expulsive reasons are confirmed, and the technical description of the Kezzeszerzes is defined by the Act 321/2015. (X. 30.) Government Decree (hereinafter: Government Decree) Section 1 (1) and Section 3 para. (2) (3) of the Governmental Decree on the timing of the Kbt. Masodik ReszeIn the case of a particularly complicated case, it is anticipated that it will be implemented at the time when the Government Decree II. In accordance with the chapters, the Unified Europe Koezbekerzesi Document must be submitted in advance to prove that it does not belong to Kbt. Article 62 (1) (a) (q), and (2) (a) (b), as well as the grounds for exclusion. Article 69 (4) (7) FundAn introduction to the exclusions for exclusions is the Kbt. The exclusions listed in Section 62 para. (1) (2) are not covered by Section 8 of the Government Decree - with the exception of Section 8 (i) (ib) -, - 10 - Exemption - 10 (g) gb It must be certified in accordance with Article 12, Section 16, Sub-section 12, Sub-section 12, Sub-section 12 of the Code of Conduct.In the case of zemely, only the Uniform European Coalition Document is introduced into Kbt. - 62 (1) (2) excludes grounds for exclusion. "In the Single European Document, the host entity (the organizer or, where appropriate, the capacity of the organization / person) declares that the reasons for the exclusion are not met. give me masresyour garden information. The statement shall include a statement that the Kbt. Article 69 (4), paragraph 4, which body is authorized and which Kbt. Article 69 (11), section on the use of database data and - in the case of sexual abuse - a statement. - 64. Includes oe
In the case of expulsion reasons, the authenticated documents issued before the start of the co-operation can be presented (used) as long as the contents of the documents are true or false. The timeliness - to the contrary proof - the data content of the data is neglected by the notifier of the report, referring to it.In Italian dogs, the owner of a farm does not have the right to introduce a truth that was retrieved electronically in the EDF by the former journalist of the same journal for the same news record. In this case, the host participant declares that the earlier authenticated certificate will take the biralat line into consideration. Timeliness attol fueggetlenuelexamine whether the earlier truth is in line with the actual content of the real-life content that has been inserted into the given case, that the earlier truth may indicate that it has been expelled to a user cell that is in the first place. In accordance with the provisions of Section 65 para. (2), penzuegyi and hosts are not eligibleConditions as.
1st Kbt. Section 40 (1) and Section 41 para. (3) stipulates the level of the previous EDF in the case of the electronic codec sourcing 424/2017. (XII. 19.) Government Decree (e-Kr.).
2. Rewarding will make e-commerce documents electronically available on the EDF system when it starts. If any statementThe statement must be submitted in the language of the e-form, the declaration must be made in the electronic form. related statementsother leagues in the e-Kr. 10 of Article 10 of the Act. Forecasts are available for all the woods (such as kueloenoesen: notepad, hissing pottery, guesswork, whistle, oesszeszes) on the EDF cross-border. The most complicated formalities of the newsletter are contained in the documents of the Kezzeszerz-s. An up-and-coming commercial proposition - the whole dog shop has been sold outi artablazat - to attach your story to an excel tab. (Artablazat is considered to be a prophetic professional newsletter)
5. The professional journal is a copy of the documents attached to the newsletter at Koezbekerzesi Dokumentacio I./8.
6. Hoping for the wings potlasat for Kbt. Article 71 of the Act. Awareness of the news is that Kbt. Section 71 (6)in the case of a horsemanship that has not previously been featured in the hunt, the new hianypotla will not be ordered. Kobt does not apply Kbt. Article 75 (2) (e). The timeliness of the result could disclose the Kbt. Article 75 para. (2) also applies if the EDF artificial fault of the EDF comes from a legal personz, which cannot be remedied by the modus operandi of the principles set out in the Kbt.
8. Also the upper and lower limit of the scoring line of the content elements of the presentations according to the specific aspects of the presentations: 0 40 points. The modalities of the newsletter are described in Kerezerz- documents as keruel.
9. The 4-month full-time six-month period set out in point II.2.7) is 120 calendar daysp is equal to
10. The Kbt. Based on Section 61 para. (4), Reflection Force informs reporters that it does not provide the following information on the issues: with host essence, somethingnt, the technical compatibility of the rooms to be procured is not the same as the currently existing function of the same function of the Synagogue (system homogenity) (system homogeneity). The period of 2 months indicated in section IV.2.6) corresponds to 60 calendar days. It is up to dateattentors' attention to the fact that the Keztszerzja is getting rid of Kbt. Article 53 (6) is supposed to be carried out on the basis of an assumption. The collector's cover is provided if the Hungarian Allami Operahaz and Erkel Szinhaz workshops with modern web sites, the Kormany, and the collector of the targyi collec- tion will provide a cover for the doent. The doo-doentes will fall behindI would not be able to disclose the results of the Keszdeszerzesi or the authors of the contract, which did not succeed,
. Awakening force attracts the attention of journalists to the exclusion of a reporter who is not supposed to be a national speaker. FAKSZ: dr. Gergely Vincze-Pap (registration number: 00392)
Continued from section VI.4.3)
Internet address (URL): http://www.opera.hu

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Ajka-Local Energy Management Hungary 152591498 19 Nov 2026
Operation of Pantograph Control Equipment. Hungary 152439041 14 Dec 2026
Purchase of a Printing Press Hungary 152323244 19 Nov 2026
Main Technological Maintenance of Gt Power Plants Hungary 152283890 02 Dec 2026
Acquisition of Profession-Specific Training Tools Hungary 152267323 20 Nov 2026

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Lighting equipment and electric lamps was 21 Jan 2019. Bidding is closed.

This tender has been issued by MAGYAR ÁLLAMI OPERAHÁZ in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 31500000 - Lighting equipment and electric lamps, 31532000 - Parts of lamps and light fittings, 38562000 - Stroboscopes.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 29475399. The purchaser document reference is 572820-2018.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Defence and Security, Technology and Equipment in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.