Contract notice: Lifting and handling equipment Tender - 23265170
Tender notice from Poland, published on 14 May 2018.
Executive Summary
The PGE ENERGIA CIEPLA S.A. has issued a Tender notice for the procurement of a Contract notice: Lifting and handling equipment and parts in the Poland. This Tender notice was published on 14 May 2018 and is scheduled to close on 08 Jun 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 23265170, while the tender notice number is 205071-2018 and Register on the platform.
Key facts
Summary
Contract notice: Lifting and handling equipment and parts
Object of the contract Lifting and handling equipment and parts Description: Contract notice: Lifting and handling equipment and parts Authority Type: Utilities entity Contact Nature: Services Procedure: Negotiated procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 42400000, 42414210, 42411000, 42416300, 42141410, 42414100, 42400000, 42414210, 42411000, 42416300, 42141410, 42414100 CPV Description: Lifting and handling equipment and parts. Traveling crane. Pulley tackle and hoists. Hoists. Winches. Cranes. Execution of current overhauls, emergency repairs and maintenance service consisting in the maintenance of lifting equipment The subject of the order is Execution of overhauls, repairs Emergency and maintenance service consisting in the maintenance of lifting equipment as described belowlocations. The subject of the orders includes in particular: Main Site: PGE EC S.A. Branch No. 1 in Krakow, ul. Ciepłownicza 1, 31 587 Krakow. Execution of ongoing repairs, emergency repairs and maintenance services consisting in the maintenance of lifting equipment installed in PGE EC S.A. Branch No. 1 in Krakow. The devices covered by the scope include: • • overhead cranes • • winches. • hoists, • cranes. • cranes. Both electric and manual. In addition, the range includes slings. The detailed list of devices will be provided along with the technical specification. The list gives details about individual devices. 1. Contractors who are not subject to exclusion and meet the conditions for participation in the procedure may apply for the award of the contract. With a postThe contractor is excluded from the contract, in respect of which any of the circumstances referred to in Article 24 sec. 1 item 12-23 of the PPL, with the exception of art. 24 sec. 1 point 13 lit. d PPL, and in the case referred to in art. 24 sec. 1 point 14 of the PPL, if the person referred to in this provision has been convicted of an offense listed in art. 24 sec. 1 point 13 lit. d Pzp, staplenot to the provisions of art. 133 ust. 4 PzP. 3. The Employer does not enter a reservation indicating the obligation of the Contractor to perform part of the work on his own. 4. The Employer does not provide for the conclusion of a framework contract. In addition, the Contracting Authority will exclude the Contractor: 1) in relation to which the liquidation has been opened, the court approved in the restructuring proceedings is expected to satisfycreditors by the liquidation of their property or the court ordered the liquidation of its assets in accordance with art. 332 par. 1 of the Act of 15.5.2015. Restructuring law (Journal of Laws of 2015, item 978, 1259, 1513, 1830 and 1844 and of 2016 item 615) or whose bankruptcy was announced, except for the contractor, which after the declaration of bankruptcy, he concluded a system approved by a valid court order, if the agreement does not-provides for the satisfaction of creditors by liquidation of the assets of the bankrupt, unless the court ordered the liquidation of its assets in accordance with art. 366 para. 1 of the Act of 28.2.2003 Bankruptcy Law (Journal of Laws of 2015, item 233, 978, 1166, 1259 and 1844 and of 2016 item 615), 2) who in the manner of a serious offense breached professional duties, which undermines his integrity, in particular when the contractor as a result-deliberate act or gross negligence did not perform or improperly performed the order, which the contracting authority is able to prove by means of appropriate evidence; 3) who, for reasons attributable to him, did not perform or did not properly execute the prior public procurement contract or a concession contract, concluded with the ordering party mentioned in art. 3 ust. 1 point 1 4 Pzp, which led to the termination of the contract or award damages; 4) who violated obligations relating to payment of taxes, fees or social security or health insurance contributions, which the contracting authority is able to demonstrate by means of appropriate evidence, except the case referred to in art. 24 sec. 1 point 15 Pzp, unless the contractor has paid the taxes duesocial security, or health and social security contributions, including interest or fines, or have entered into a binding agreement on the repayment of these amounts. 5. The Contracting Authority shall withdraw from the obligation to exclude from the contractor's conduct, on the basis of the conditions set out in Art. 24 sec. 1 point 22 of the PPL if the ban on applying for public orders has expired. Contractor is insuredfrom civil liability in respect of conducted activities related to the subject of the order, in the amount of: - - PLN 2 million for PART I, II and IV, ie: PGE EC SA Branch No. 1 in Krak-w, PGE EC SA Oddział Wybrzeże, KOGENERACJA SA, - PLN 5 million for PART III, ie: PGE EC SA Branch in Rybnik, - PLN 1 million for PART V, VI, ie: PGE Toruń SA, Elektrociepłownia "Zielona Gora" SA.-submitting an application for admission to participate in more than one part of the order, the Employer allows the Contractor to submit copies of documents confirming the possession of insurance for an amount constituting at least the sum of the amounts required for each part of the contract, which he is interested in. 1. The Contractor may submit offers for selected parts of the order. 2. The ordering party does not ogrenumber of offers submitted by one Contractor. 3. Together with the invitation to submit the initial bid, the Contractor will receive a Catalog of activities for the valuation of the Part of the order, on which he declared submission of the offer in the application for admission to participate in the proceedings. The ordering party will require the Contractor to complete a catalog of activities, in particular by indicating the expenditures-work and initial application, one (1) processing rate for all activities covered by the catalog and the indication of the amount of purchase costs (KZ). In the case of the catalog of activities for PART III, the branch in Rybnik, the amount of the processing rate should include costs related to securing the roster performed by the Contractor's employees. 4. Employer based on the initial offers received, and on-based on the negotiations, using the median method will determine the final workload for these locations (Parts of the order), in which a minimum of 2 offers will be submitted, and as a consequence, if deemed necessary, it will modify the provisions of the Technical Specification and the draft contract. Contractor in the final offer, based on the expenditures specified by the Ordering Party in the catalogwork will determine the final processing rate as one for all catalog items and mark-up on the cost of delivered materials (purchase costs). In the case when the Contractor's application is submitted by a proxy with an electronic signature, the Ordering Party requires that the original power of attorney to submit electronic signature has been sent to the address: Jolanta Szuba-Bartoszek. PGE Energia Ciepła S.A. Branch No. 2 CUW in Krakow. 31-587 Krakow ul. Ciepłownicza 1. The above provision concerns the case when the file with the power of attorney does not bear secure electronic signatures of the Contractor's representation resulting from the register. Internet address (URL): https://www.pgeenergiaciepla.pl Directive: Classical Directive (2014/25/EU)
The bid deadline for Contract notice: Lifting and handling equipment and parts was 08 Jun 2018. Bidding is closed.
This tender has been issued by PGE ENERGIA CIEPLA S.A. in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 42400000 - Lifting and handling equipment and parts, 42414210 - Travelling crane, 42411000 - Pulley tackle and hoists, 42416300 - Hoists, 42141410 - Winches, 42414100 - Cranes.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 23265170. The purchaser document reference is 205071-2018.