Contract notice: Lift installation work Tender in Bulgaria - 21911736
Tender notice from Bulgaria, published on 27 Mar 2018.
Executive Summary
The ??????? ?? ????????, ??????????? ? ???????? has issued a Tender notice for the procurement of a Contract notice: Lift installation work in the Bulgaria. This Tender notice was published on 27 Mar 2018 and is scheduled to close on 04 May 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 21911736, while the tender notice number is 131686-2018 and Register on the platform.
Object of the contract Lift installation work Description: Contract notice: Lift installation work Authority Type: Ministry or any other national or federal authority Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: Mixed CPV code: 45313100, 45000000, 45313100, 45000000, 71521000 CPV Description: Construction, installation, installation and installation of elevators in SGKK - Sofia, SGKK - Silistra and SGKK - Lovech and construction supervision " The subject of the public procurement is "Design, production, supply and installation of elevators in SGKK - Sofia, SGKK - Silistra and SGKK - Lovech and implementation of construction supervision"in six separate lots and has as object the execution of construction in the meaning of Art. 3, para. 1, item 1, b. (A) of the Public Procurement Act (PPA), as well as the related services and supplies related to it.The public procurement is assigned under the procedure applicable to construction as this is the object which characterizes the activities - the main subject of the procurement. Main Site: Sofia, Musala Str.-No. 1. Delivery of 1 (one) number of new passenger electric lift with collective control in both directions and load capacity of at least 350 kg payload for a public building with administrative address in Sofia, 1 Musala Str., Including its certification. Design and execution of all the accompanying construction, assembly, commissioning and registration of the new liftq Deadline for performance of the contract up to 6 (six) months from signing the contract and providing output data. Activities: 1. Project documentation of a new lift system - all costs of approving the design documentation are at the expense of the contractor. The prepared design should meet the requirements of the Ordinance on Essential Requirements and Assessment of Lift Complianceand the safety devices of elevators, adopted by a Decree of the Council of Ministers, in force on April 20, 2016, the Regulation on the Safe Operation and Technical Supervision of Elevators (promulgated in SG 33 / 11.04.2003, ed. and supplemented SG No. 88 of 24.10.2014), the Bulgarian and European standards and directives; Preparation by the contractor of a plan - schedule for types of works and deadlines nand their implementation; Preparation of a quantitative cost account for delivery, the construction works and the equipment of the elevator; Preparation of a Safety and Health Plan (BSS) according to Ordinance № 2 of 22.03.2004 on the minimum requirements for health and safety at work for construction and installation works, chosen by the contractor, who holds a certificate of fulland designer competence by the Chamber of Engineers in Investment Design; Delivery of 1 (one) number of passenger lift according to technical requirements and kit; Installation of the new elevator Performing the necessary construction and installation works, correcting the defects in the walls and the lining of the elevator shafts resulting from the installation of the new elevator and /7; After the completion of the installation activities, according to the provision of Art. 21 of the Ordinance on the Safe Operation and Technical Supervision of Elevators, the Contractor shall provide to the Assignor all the accounting documentation (in duplicate) described in Art. 20, para. 3, item 2-7 of the same Regulation, including the technical data and characteristics of the lift, its components and the itemauditing devices, auditing book, certificates for inputs, etc .; Drawing up a declaration of compliance with the essential requirements set out in the Ordinance on the Essential Requirements and Assessment of the Conformity of Lifts and their Safety Devices, on the Basis and After Testing and Conformity Assessment by a Notifying Body, selected by the Assignor at his own expensemarking the mark in a prominent position in the lift cab or safety device; The Contractor shall perform all necessary actions and draw up all required documents for the registration of elevators under the procedure of Art. 20 of the Regulation for the Safe Operation and Technical Supervision of Lifts; Warranty Period: not less than the warranty period provided in thethe territory and Ordinance № 2 of 31 July 2003 for the commissioning of the construction works in the Republic of Bulgaria and minimum guarantee periods for completed construction and assembly works, facilities and construction sites issued by the Ministry of Regional Development and Public Works. servicing the elevator system within the guarantors proposed by himmaximum period of reaction time for the release of passengers and emergency stop of the system within 1 (one) hour from the notification. The service is carried out in accordance with the requirements of the Regulation on the Safe Operation and Technical Supervision of Lifts 1.1. For OP 1, 3 and 5: 1.1.1. Participants should have rights to carry out maintenance, repairs and maintenanceand reconstruction of facilities with increased danger, according to Art. 36, para. 1 of the Technical Requirements to Products Act and are entered in the Register of the persons undergoing maintenance, repairs and reconstruction of facilities with increased danger or equivalent according to the legislation of the State in which the participant is registered in the State Agency for Metrological and Technical Surveillance (SAMTN) Where the participant is a grouping which is not a legal entity, at least one of the participants in the grouping who will carry out the installation of the lift according to the distribution of the activities in the pooling agreement must be entered in the register according to Art. 36, para. 1 of the Technical Requirements to Products Act. Where a participant provides for the participation of a subcontractor (s), a requirementit applies to the subcontractor (s) who will perform the installation of the lift according to the distribution of the activities he / she will undertake. 1.1.2. When submitting a tender, participants declare compliance with this selection criterion by completing Part IV, Section A, point 1 of the EEDOP, 1.1.3. To prove the fitness (capacity) under item 1.1.1 the participant selected as contractor, the conclusion of a contract, respectively a participant, from whom it is requested in the course of the procedure under Art. 67, para. 5 of the Public Procurement Act shall indicate his / her registration in a Register of the State Agency for Metrological and Technical Surveillance or equivalent under the legislation of the state in which the participant is established, which has not been terminated, respectively present a document for performed-registration where this can not be established by a public register with free access or the participant has not indicated the institution providing access or another means of establishing that circumstance 1.2. For OP No 2, No 4 and No 6: 1.2.1. A participant in the procedure must hold a valid license for exercising the activities under Art. 166, para. 1, item 1 of the Territory Arrangement pursuant to - 128 of the Transitionaland final provisions of the Law for amendment and supplement to the TDA, respectively a valid certificate under Art. 166, para. 2 of the TDA and Ordinance RD-02-20-25 dated 3.12.2012 on the conditions and the procedure for issuance of a certificate for entry in the Register of the consultants for the assessment of the conformity of the investment projects and / or the exercising of the construction supervision issued / o by the Chief of the Directorate for Nationals(NCSG) and foreign persons - have equivalent certificates / licenses or other documents according to the law of the country where they are established 1.2.2. When submitting a tender, participants declare compliance with this selection criterion by completing Section IV, Section A, point 2 of the EEDOP; In order to prove the requirement, the participant designated to be executedthe participant, from whom it is requested in the course of the procedure under Art. 67, para. 5 and 6 of the Public Procurement Act, a valid certificate / license for exercising the activities under Art. 166, para. 1, item 1 of the TDA. Where a participant is a non-resident, he shall provide a copy of a document certifying the right to perform construction supervision issued by a competent authority of a Member Stateof the European Union or of another country party to the Agreement on the European Economic Area. In the event that a specific permit or membership of a particular organization is required for the execution of the relevant service (exercise of supervision) under the law of the State in which the participant is established, the participant must prove the existence of such a permitwe have the following requirements for economic and financial standing and for six lots: - the participants have achieved a minimum total turnover, - the participants have realized a minimum turnover in the scope covered by the contract, - the participants to have professional liability insurance only for lot 2, 4 and 6. For a foreign participantthe general and specialized turnover is calculated in BGN at the official exchange rate of the BNB for the respective currency at the date of submission of the tender. Participants should provide the information for total turnover in Part IV, Section B, item 1a) of EEDOP, and for specialized turnover - in Part IV, Section B, item 2a) of EEDOP. In case there is no information on general or special turnover for the entire 3-year period, the Participants shall complete Part IV, Section B, Item 3, indicating the date on which they were established or started their activities Participant - a non-resident shall have valid equivalent professional indemnity insurance in another Member State of the European Union or in a Party to the Agreement on the European Economic Area Participants should declarecompliance with the professional liability insurance requirement by completing the required information (policy number, date of conclusion, insurer, insurance risks, insurance amount) in Part IV, Section B, item 5 of EEDOP. To prove your compliance with the minimum requirements regarding the economic and financial status of the respective lottery participant, designated as a contractor, shall submit one or more of the following documents: - a bank statement, - proof of the professional liability insurance of the builder, the annual financial statements or their components when required by law of the country in which the participant is established, - a statement of the total turnover and the turnover in the spherein the scope of the order. When the document (s) under item 2.3.1. are accessible via a public free registry or the information is accessed or provided by the respective competent authority of the contracting authority on an official basis, the participant shall indicate the necessary information for the Internet address or the authority issuing the information document in Part IV, Section B, ), 1b) and 5) from EEDOPthat due to a good reason the participant designated as contractor is unable to submit the document under item 2.3.1, it can prove its economic and financial condition with any other official document issued by a bank, financial institution or a state body showing compliance with the minimum requirements for general and specialized (specific) turnover. ot III 1.3: "Tech. Sciences "with Prof." Architecture, Construction and Geodesy "according to Classif. the areas of a higher image. and Professor, Prof. with Decree of the Council of Ministers No 125 of 2002, Prof. "Architect", or equivalent, with equivalent professional qualifications and specialty acquired abroad, in an area equal to the above mentioned, - Full design qualification, - Minimum professional experience in the specialty - 5 years. b)Constructor - 1 piece: - finish. a higher image. in the field of "Technical sciences", with Prof. "Architecture, Civil Engineering and Geodesy" according to Classif. the areas of a higher image. and Professor, Prof. with Decree of the Council of Ministers No 125 of 2002, Prof. "Construction engineer" or "engineer", special "construction of buildings and facilities" or "industrial and civil construction" or equivalent. image. with equiv. Prof Qualu. and specialty acquired abroad, in the field, equiv. of the above-mentioned, - full designer capacity, c) engineer - 1 pc. - Finish. a higher image. in the field of "Technical sciences", with Prof. "Electrical engineering, electronics and automation" according to Classif. the areas of a higher image. and Professor, Prof. with Decree of the Council of Ministers No 125 of 2002, Prof. "Electrician", or equivalent, with an equivalent. Professional Qualification. and specialty acquired abroad, in an equivalent area. Note: The same person can not match two or more positions The participant under OP no 1 can not be the same as the one for OP no 2. The participant under OP no 3 can not be the same as this one for OP No 4. The participant under OP no. 5 can not be the same as the one for OP no 6. The open procedure is a type of procedure for assignment. of volpublic procurement under PPA, which is freely chosen by the public contracting authorities and in which all interested parties. Individuals can submit bids. procedure can be any Bulgarian or foreign. Phys. or legal. a person or their groupings, as well as any other entity that has the right to perform an activity under the subject of the order according to art. legislation. of the country in which it is established, it complies with the pre-announced requirements of the contracting authority specified in the notice and in this document, and the requirements of the PPA and the PPPP. Participants are obliged to observe the terms and conditions stated in the notice and documents. for the public procurement and specifically for the vol. position, where available. The participants are represented by the persons representing them by law or by persons, -explicitly authorized for this procedure, for which a notary is expressly presented. certified power of attorney - original or notary. certified branch. Branch of a foreigner. a person may be loneliness. a participant in the procedure if it can solitary. to submit an offer and to contract according to law. of the country in which the branch is located. Basic. for removal according to Art. 54, para. 1 of the PPL (for compulsory removal) and Art. 55, para. 1, items 1, 2 and 4 of the PPL: 5.1.3. A participant in the procedure is also removed - a union of businessmen. and / or legal. when a member of the grouping has one of the foundations. under 5.1. 5.2. Dr. basic. for removal: - Connect. persons within the meaning of - 2, item 45 of the PP to the Public Procurement Act, - a participant who is not entitled to participate in a public. orders under Art. 3, item 8 in relation to Art. 5, para. 1, p. 3 of ЗИФОДРУПДRCRTDS unless they are available under Art. 4 of the same law, - Participant who does not meet the selection criteria set for vol. position or does not fulfill another condition specified in the public notice. order or in this documentation, - A participant who submitted a tender that does not correspond to: - advance. the announced terms of the order, incl. tech. for respectively. vol. position, - rightvilla and requirements, connect. with preservation. the environment, social and labor law, applied. collective agreements and / or international regulations. environmental law, social and labor law listed in Annex 10 of the PPA, - Participant who has not submitted a reasoned opinion on time. under Art. 72, para. 1 of the Public Procurement Act or whose offer has not been accepted according to Art. 72, para. 3-5 of the PPL. The other conditions for participation are set out in the documentetc. for the public. order. Internet address (URL): www.cadastre.bg Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Lift installation work was 04 May 2018. Bidding is closed.
This tender has been issued by ??????? ?? ????????, ??????????? ? ???????? in Bulgaria.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45313100 - Lift installation work, 45000000 - Construction work, 71521000 - Construction-site supervision services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 21911736. The purchaser document reference is 131686-2018.
This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.