Expired Tender Romania ICB TOT Ref. 36952322

Contract notice: Landscaping work for green areas Tender - 36952322

Tender notice from Romania, published on 09 Oct 2019.

Executive Summary

The SECTOR 5 (PRIM?RIA SECTORULUI 5 BUCURE?TI) has issued a Tender notice for the procurement of a Contract notice: Landscaping work for green areas in the Romania. This Tender notice was published on 09 Oct 2019 and is scheduled to close on 08 Nov 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 36952322, while the tender notice number is 470479-2019 and Register on the platform.

Key facts

Summary
Contract notice: Landscaping work for green areas
TOT Ref. No.
36952322
Document Ref. No.
470479-2019
Country
Romania
Notice type
Tender
Competition
ICB
Publication date
09 Oct 2019
Bid deadline
08 Nov 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Landscaping work for green areas
Description: Contract notice: Landscaping work for green areas
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45112710, 45112710, 45112711, 71220000, 71322000, 71356200, 77310000, 45112710, 45112711, 71220000, 71322000, 71356200, 77310000
CPV Description: Landscaping work for green areas.
Landscaping work for parks.
Architectural design services.
Engineering design services for the construction of civil engineering works.
Technical assistance services.
Planting and maintenance services of green areas.
Technical design, technical assistance and execution of works on the arrangement of green spaces 3 lots, as follows: Lot 1 Parks and green space locurious to play [...] details on www.e-licitatie.ro
Reference Number: 4433953/2019/21
Technical design, technical assistance and execution works on green space development 3 lots, as follows:
Main Site: Sector 5, Bucharest,
Technical design, technical assistance and execution works on the arrangement of green spaces 3 lots, as follows:
- lot 2 Lawns, squares, alignments 227 065.20 m2 (technical design, technical assistance and works execution)
The estimated value of the framework agreement lot 1, lot 2 and lot 3 is in the range: RON 10 503 752.25 excl. VAT and RON 820 938 812.10 excl. thus:
For lot 2 the range 3 884 802.25 RON excluding VAT and 177 038 344.95 RON excluding VAT, detailed as follows:
- services for carrying out the technical project and technical assistance from the prto the plaintiff, the range 116 544.06 RON excluding VAT and 5 311 150.35 RON excluding VAT,
- works execution interval 3 768 258.18 RON excluding VAT and 171 727 194.50 RON excluding VAT.
Estimated area of the smallest framework agreement lot 2: 16 707 m2.
Estimated value of the smallest framework agreement lot 2: 3 884 802, 25 RON excluding VAT, of which:
- design services = 116 544.06 RON excluding VAT (3% estimated value),
- works and materials = RON 3, 768, 258.18 excluding VAT.
Estimated surface of the smallest subsequent contract lot 2: 16 707 m2.
Estimated value of the smallest subsequent contract lot 2: 3 884 802, 25 RON excluding VAT, of which:
- design services = 116 544.06 RON excluding VAT (3% of estimated value),
- works and materials = 3 768 258.18 RON excluding VAT.
Estimated area of the largest contract sSubsequent lot 2: 200 000 m2.
Estimated value of the largest sub-contract following lot 2: 46 505 532, 20 RON excluding VAT, of which:
- design services = 1 395 165, 96 RON excluding VAT (3% estimated value ),
- works and materials = 45 110 366.23 RON excluding VAT
Largest framework agreement for lot 2.
Total estimated framework agreement for lot 2 = 227 065.2 m2.
Total estimated value of the framework agreement lotul 2 = 177 038 344.95 RON excluding VAT, of which:
- design services = 5 311 150.35 RON excluding VAT (3% of estimated value),
- works and materials = 171 727 194.60 RON excluding VAT.
Information and formalities necessary for the assessment of compliance with the mentioned requirements
The bidders, third-party supporters and subcontractors must not be found in the situations provided for in articles 164, 165, 167 of Law no.98/2016. The way in which the requirement can be demonstrated: the DUAE will be completed in accordance with art. 193 para. 1 of Law 98 / 2016.
The supporting documents proving the fulfillment of those assumed by completing the DUAE will be presented, at the request of the contracting authority, only by the tenderer ranked first in the ranking prepared at the end of the evaluation o
These documents are:
Certificates confirming the lack of outstanding debts, regarding the payment of taxes, taxes or contributions to the general consolidated budget (local budget, state budget) at the time of presentation;
The criminal record of the economic operator and members the administrative, management or supervisory body of the respective economic operator, or ato those who have power of representation, decision or control within it, as it results from the certifying certificate issued by the ONRC / the constitutive act; 166 para. (2), art. 167 para. (2), art. 171 of Law 98/2016 on public procurement; other documents editedif appropriate
If the country of origin or the country where the tenderer / supporting third party / subcontractor is established, documents of the nature mentioned above are not issued or the respective documents do not cover all the situations referred to in articles 164, 165 and 167, the contracting authority has the obligation to accept a declaration on its own responsibility or, if there is nolegal remarks regarding the declaration on its own responsibility, an authentic statement given in front of a notary, an administrative or judicial authority or a professional association that has competence in this regard.
Persons with decision function within the contracting authority regarding the organization, the execution and completion of the award procedure are: FLOREA DANIEL, ȚIGĂNUȘ MARIAN, HOPINCĂ RAREȘ, DRAGNEA FLORINA, DISAGGES ISABELA NICOLETA, NEAGU ALINA CRISTINA, BLACK AURELIA, VASILIU MIHAELA, TICIA MARIA, GHERGHE MARINELA, JOLDEȘ DAN DRAGOȘ, ION MARIETA, ELA MARIAETA, BALAEL, MAGNE URLAN FLORINA, TURTUREANU DANIEL, MARIN LUCIAN, VĂCĂRIU GABRIELA, NICULAE FLORINA, PETRE MIRCEA AUGUSTIN, ANDREI MARIANA, GHEORGHE LAURA SOFICA.
Regarding the supporting associations / third parties and / or the subcontractors, the method of fulfillment can be found in the ANNEX - INSTRUCTIONS FOR THE OFFERS. registration according to the law of the country of residence, stating that opthe economic error is legally constituted, that it is not in any of the situations of cancellation of its constitution, as well as the fact that it has the professional capacity to carry out the activities that are the subject of the contract. by the economic operators participating in the award procedure with the related informationis their situation
The supporting document proving the fulfillment of those assumed by completing the DUAE, respectively the certifying certificate issued by the ONRC, or in the case of the foreign legal / natural persons bidders, the equivalent documents issued in the country of residence, translated into Romanian, will be presented, at the request of the contracting authority, only by the tenderer ranked firstplace in the ranking prepared at the end of the evaluation of the offers. The activity must be authorized according to Art.15 of the law 359/2 ... details on www.e-licitatie.ro
Lots: 1, 2, 3. The average annual turnover. The minimum level of the annual turnover must be at least equal to:
- lot 1 Parks and green space playgrounds and leisure = 161 693 RON 189.14, in relation to the mosthas a subsequent contract,
- lot 2 Lawns, squares, alignments = 93 011 064.40 RON, in relation to the largest subsequent contract,
- lot 3 Blocks gardens = 122 468 000.00 RON, in relation to the largest Subsequent contract.
Of which:
I. The minimum level of annual turnover for design services must be at least equal to:
- lot 1 Parks and green spaces places ofplay and leisure 651 537.47 m2 = 4 850 795.66 RON without VAT, by reference to the largest subsequent contract,
- lot 2 Lawns, squares, alignments 227 065.20 m2 = 2 790 331.92 RON without VAT, by reference to the largest subsequent contract,
- lot 3 Block gardens 580 759.00 m2 = 3 674 040.00 RON excluding VAT, by reference to the largest subsequent contract.
II. Minimum level of figuresi annual business for execution works must be at least equal to: the bidder must have performed similar works in the last 5 years in the cumulative value of at least:
- lot 1 Parks and green space playgrounds and leisure = 156 842 393, 46 RON without VAT, by reference to the largest subsequent contract,
- lot 2 Lawns, squares, alignments = 90 220 732, 46 RON without VAT, priin relation to the largest subsequent contract,
- lot 3 Gardens blocks = 118 793 960.00 RON excluding VAT, by reference to the largest subsequent contract.
Interaction with the offer, respectively the evaluation process of the offer will be followed reg: Pt visual document of attribute uploaded in SEAP, it is necessary to have a visual program necessary for the electronically signed files. Communication and data transmission rules: request ofclarif ref to this attribution document will be addressed exclusively in SEAP to the "Questions" section, and answer to these will be published in the SEAP section "Documentation, clarifications and decisions". In order to request clarifications regarding the attribution document, op ec will be registered in SEAP as an op ec cf according to art.5 paragraph (1) of the GD395 / 2016 and will request in the light of the response terms of the aut. 160-161 ofn Lg 98/2016 as well as those from art. 103 (2) of GD 395/2016. For the final offer: the evaluation committee will send a request for clarification regarding the offer through the technical facilities available in SEAP. The evaluation commission will analyze the DUAE in correlation with the stab requirements through the procurement data sheet.you of the financial aspects that they involve.Op ec will send a reply to the clarification and the eventual ground documents during the evaluation offered through SEAP, in electronic format, signed with electronic signature, cf Lg no. 455 / 2001.Op ec will respect the model of framework agreement and for the subsequent annexed forms. The offer will present the framework agreement and for the subsequent proposed, signed and stamped by ofefrequently, accompanied by possible prop of modification of the clauses as specific, proposals that will be accepted only insofar as they will not, obviously, be disadvantageous for others. Aut to the info each bidder regarding the decisions taken regarding the proc proc res, respectively attribution / conclusion of the pub acquisition, including regarding the reasons underlying any decision not to awardctr, or to resume the procurement process, as soon as possible, but not later than 3 days from the issuing of the respective decision. it does exclusively according to the price and not by quantifying other elements of a technical nature or other advantages that result from the mode of performance of ctr by op ec in vthe release of the offer deferral, aut ctr will land on new financially improved prop and op ec will send their answer in closed envelope (until the creation of the technical facility of new recruitment offered through SEAP) case in which the contract will be awarded to the tenderer who presented the price In view of the recommendations of the Deputy Prime Minister, expressed in the address no. 25074 / 19.02.2019, City Hall S 5 al municpiului București introduces the following suspension clause, cond of causes independent of its will: The procurement procedure for the procurement of pub is initiated under the incidence of suspensive clauses, in the sense that the conclusion of the framework agreement / ctr of subsequent public procurement is the cond of the allocation of budgetary credits with this destination, the signing of the agreement - a framework being made with the respect of the employerit to the expenditures from the budgets that fall under the legislation on public finances. Aut specifies that it will conclude the framework agreement and with subsequent ones with a declared declared winner only insofar as the non-purchased funds will be assured by some way I think bug with this destination. In case, for whatever reasons, the budget credits will not be allocated, aut ctr, after receiving the notification with prev in not granting the Financing, reserves the right to cancel the procurement deed, in the condition that there is no other source of fin, in accordance with prev. 212 al. (1) letter c) of Lg 98/2016 being impossible to conclude the framework agreement / ctr of subsequent pub acquisition. I offer from this proc I understand and agree that aut ctr cannot be considered responsible for any damage in case of cancellation of the proc proc, regardless of the nature of the damage and whether the car was notifiable. Offer procedure accepts the use of the above spec spec assuming full responsibility
Internet address (URL): www.sector5.ro

Documents

Tender Notice
Login to view

Similar tenders

Romania Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Landscaping work for green areas was 08 Nov 2019. Bidding is closed.

This tender has been issued by SECTOR 5 (PRIM?RIA SECTORULUI 5 BUCURE?TI) in Romania.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45112710 - Landscaping work for green areas, 45112711 - Landscaping work for parks, 71220000 - Architectural design services, 71322000 - Engineering design services for the construction of civil engineering works, 71356200 - Technical assistance services, 77310000 - Planting and maintenance services of green areas.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 36952322. The purchaser document reference is 470479-2019.

See the Similar Tenders section on this page or browse other tenders from Romania.

This tender falls under Construction and Real Estate, Agriculture and Foods in Romania. Suppliers in these sectors can track similar Romania tenders using CPV-based alerts.