Contract notice: Laboratory building construction Tender - 29424135
Tender notice from Hungary, published on 22 Dec 2018.
Exeutive Summary
The DEBRECENI EGYETEM has issued a Tender notice for the procurement of a Contract notice: Laboratory building construction work in the Hungary. This Tender notice was published on 22 Dec 2018 and is scheduled to close on 29 Jan 2019, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 29424135, while the tender notice number is 567063-2018 and Register on the platform.
Key facts
Summary
Contract notice: Laboratory building construction work
Object of the contract Laboratory building construction work Description: Contract notice: Laboratory building construction work Authority Type: Other Contact Nature: Works Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 45214610, 45214610, 45214610 CPV Description: Laboratory building construction work. DEK-554 Vall. authors. PILOT Kutatolabor. References: EKR000281922018 DEK-554 Carried out by the author PILOT Research Laboratory of Vallalkozasi at Debrecen, Vezer Street Agrar Innovacios Park (GINOP-2.3.4-15-2016-00002). Main Site: 4032 Debrecen, Vezer Street Agrar Innovacios Park (cf. 0204/36) The down-to-the-minute set-uprelated physical parameters: Plot size: 7153.00 m2 Plot area of the planned Research Laboratory: 1247.96 m2 Foeld Level: 1057.60 m2 Grade level: 1094.44 m2 Roof Surface: 16.55 m2 Planned Research Laboratory netto (useful ) Ground floor space: 2168.59 m2 Entrance floor: 17.45% Roads, paved decking: 1259.51 m2 Oessze enclosed and covered terrain: 2507.47 m2 Zoeldteruelet gold: 63, 62% Epitometric Moisture: 8.27 m Sterile Clean Room Produce: 13300 * 31315 * 3200 mm with a 100 mm Thickness PIR Smooth Upper Wall, 100 mm Thickness PIR Smoothed Ceiling, All Side RAL9002 Dust Covered, Folded plate feluelet all side: 0.6 mm, 25my thickness thick, wall and ceiling constructions nutos In the epuel, there are 386.21 m2 net floor space with sterile clean room space. In the sterile clean room, clean room doors with kerosene for 2 x 750 x 2100 mm, 28 x 1000 x 2100 mm, 4 x 1400 x 2400 mm for keruel. 60 mm door leaf with thick thickness, anodised aluminum finish, with profile frame attached to clean room wall, allotable in 3 materialsminium-structured cleanroom hinges, automatic movable louvre, 24V electric tap-in spigot in the top position of the door leafs, normally open in the bottom, zinc-red sub-indicator and winning with pushbuttons. x 800 x 800 mm in size, 50 mm in thickness, PIR kemenyhab toeltet insulated, anodised aluminum door leaf, safe flame, top sterile filter box, 100 mm leg, HEPA H14 sterilized filter (150 mm), ISO14644 clean room space. with a 50 mm thickness, with PIR heat insulation to be insulated, anodised aluminum Inside the front facades of the epuelet is 791.22 m2 upstairs in a pile with a grain of 1 mm grain-like grout. 592.37 m2 on the front (of which 386.21 m2 feluelete in sterile clean room areas) 0.5 cmanti-static, mechanical and chemical-resistant, anti-corrosive, with epoxy resin coating system for industrial floor coverings. The sterile technological space (clean room) ventilation and air conditioning base is based on the lower range: On the sterile technological space, the full temperature is min. 20C, summer heat max. 24C, a relativ parity of 40-60% koezoett. The controller of the most advanced equipment is suicidal. The suicidal purse grade on the chamfer area is A-B-C and D or. NC and CNC are functionally active. The deciduous squadron-like squares should be kept and registered. These bumpers must also appear on local display instruments.These spaces provide heating and cooling with ventilation air, which is solved by the most up-to-date operators in the floor. The exquisitely ventilated tongue and groove is the 20-30-fold change in the technology fields. The top handlers with 100% fresh air for the artwork with a heat exchanger with heat exchanger on the suction side. Pre-heaters, heaters, heaters, frequency fansozatu filter and motorized shutter. The server room for sterile technology consumed in the gephaz and on the roof is a split-system flow cooler, which is served by the content management by the cooler cooler on the server flow cooler, so that the server of sterile technology always takes priority. It is not possible to have a timer, an underdog or a rin the right case book is a farmer with whom Kbt. Section 62 para. (1) and Kbt. The exclusions listed in Section 62 para. (2) apply. The Kbt. On the basis of Section 74 para. (1) (b), the timeliness excludes the subscriber, sub-subcontractor or organization which retains the appropriate reader's certificate from the record of the expulsion in the first place.True Mod: The Kbt. Article 67 (1) and Article 321/2015. (X. 30.) of the Government Decree on the grounds of economic activity, the reasons for the exclusion are not taken into account in the statement of the unified european co-procurement document. Pursuant to Article 3 (3) of Government Decree 321/2015 (X.30.), In the case of koezoes, the chancellors of the koezoes are allit must present a single european co-procurement document. The subscriber will introduce the unified European co-production document to Kbt. The reasons for exclusion in section 62 are not valid in forests. I am subordinate to those who do not take the correct reader in their masterbooks. Section 67(4) to submit a statement in the schedule. The statement must also be entered if the timeliness has not been specified by the subcontractors known in the past. Kbt. Section 69 (4) - (7) of this Act, in respect of which the relevant officer shall be subject to the provisions of Article 8, Section 10, Section 12, Article 12 of Government Decree 321/2015 (X.30.). -, 14th -, 16th - must certify whozaro causes not above pool. Opaque clarifier according to - 64. The Kbt. Article 69 (4) of the Rev. Addendum to Article 62 (1) (k) (c) (c) shall be accompanied by a statement containing the contents of the declaration form issued by the President. registry courtIn the case of an enrolled, but not exhausted, registry entry, it must be disposed of in accordance with Section 13 of Government Decree 321/2015 (X.30.). If you do not have any variables in your bidding process, you should declare this in your current schedule. NY.1.) NY.1.) Kbt. Section 65 (1). point c) and 322/2015. (X.30.) KR. Article 21 (1). base on AK Predict that the industry isi Hosts involved in construction work should be included in the epitesiberuhazas link to the Etv. in the case of non-Hungarian economic operators established in Hungary, or in the case of non-Hungarian economic operators established in the country of residence, or have the permission granted in the country of establishment, or legal organization, chamber tagsagag. Appropriate proof of professional activity vegzesere: Preliminary certificate: AT has to submit the EECD, in which AK accepts the preliminary proof of suitability of the case, the simple statement of the AT is given in Form IV. "alpha" section. Recent Igazolasimod: In case of a hunter who is established in Hungary, AK checks the case of a suitable personEljesueleset of the available electronic register. epithelialnone of the host companies engaged in industrial engineering activities are listed in Etv. in the case of non-Hungarian economic operators established in Hungary, or in the case of non-Hungarian economic operators established in the country of residence. Section 67 (1) - (3) and Section 1 (1) of the Cr. and Article 2 (5). appropriately - A statement by the farmer (newsletter, koezoes, capacitor, capacity) is also acceptable, stating that in the EECD it is sufficient to have the IV. z ozott a ag o o o o o o umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok umok Article 69 (4) fundJan P.1) About Kbt. Section 65 (1). (a) and Article 19 (1) of the Cr. c) the subscriber attaches a statement of the last 3 rows of days before the end of the day, from the date of the last 3 roles of the kennel colleague (high-stakes) - AFA nelkuel samitott - arbeveteler, refusing to tell when the timer started to drink or when he startedaction, [Continued with the appropriate minimum rate] 1. The news of the news is available in the Kaiserbahn doc. The announcements must be submitted electronically on the EKR system with a cross. 2. If there are any documents, certificates, statements, etc. attached to the newsletter. it is not Hungarian in Keruel, so the AT is responsible for the Hungarian translation. The correctness of the translation is the responsibility of AT. AT and optionally al. the organization that retrieved the certificate must attach to the report the alphabetical order of the AEC and the capacity organization. alairas pattern. If the person who is eligible for the note and the person of the co-driver has a chelated blade, it is at least complete 4.AT introduces a unified European co-operative document in its schedule. Government Decree 321/2015 (X.30.) Subject to Section 2 (5) AK roegziti, h. the preliminary proof sheet of the appropriate counterparts accepts the simple statement of the hosted farmer. In the newsletter you have to comment on Kbt. Article 66 (2) and Kbt. Article 67 (4). trainkozasaban. 7th The Kbt. Section 65 (7). statement-if relevant-attachment 8. Hianypotlas: the Kbt. Article 71 e 424/2017. (XII. 19.) Government Decree Article 11 (2) and (3). According to. 9th Koezoes In the event of an admission, the beggars of the Kezoes ATs (Kbt. 35 -) will be introduced by the beggars 10. The Docks are Kbt. In accordance with Article 47 para. 6Section 6 (2). to make the statement according to the electronic form, please make sure you do the following. The Kbt. On the basis of Section 66 para. (5), the report shall contain a read-out sheet that will authenticate the Kbt. Article 68 (4) (o). The Kbt. Article 66 (6). to declare sub-subcontractors (also with negative content). Proponent of the proponent's reportIt must be made clear by the quality of the qualifier, which makes it suitable for the right aspects. In this dog, the Proponent must be able to: - unleash the unearthed coel of the bulletin with the proprietor; The timelines are guaranteed by the net: 20, 000, 000Ft. the bankruptcy of a bank account with the same bankruptcy insurance company, Penzuegyi intezmeny v insurance company with the same bail-out, or vice versa of the insurance company, has been issued - with a pay-as-you-go guarantor. The timeThe commissioners will have six times the time limit for issuing the sixth. In the case of an ordinary case, the payment order is to be checked on the court. An attaal tertiary certificate must be attached to the schedule. In this unclean case, the announcement of the early announcement is made by the powerful Kbt, Ptk and the law of relationship. 16. AK with Kbt. Section 81 (4) - (5), the agendas are valzatat, which is also vulgarly vulgar in terms of its goldsmith's low price. K's project team excludes both AT and Kezoes ATs. 19. AK informs hosts to apply Kbt in the present case. Article 75 (2)paragraph 18 (e). FAKSZ: dr. Elek Nagy-Stieber (OO892); dr. Judit Csepregi (registration number: 01020) 19. In the newsletter you have to declare the technical documentation Internet address (URL): https://unideb.hu/
The bid deadline for Contract notice: Laboratory building construction work was 29 Jan 2019. Bidding is closed.
This tender has been issued by DEBRECENI EGYETEM in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45214610 - Laboratory building construction work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 29424135. The purchaser document reference is 567063-2018.