The PGE GÓRNICTWO I ENERGETYKA KONWENCJONALNA S.A. has issued a Tender notice for the procurement of a Contract notice: Installation services of transformers in the Poland. This Tender notice was published on 22 Aug 2019 and is scheduled to close on 30 Sep 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 35698727, while the tender notice number is 397357-2019 and Register on the platform.

Key facts

Summary
Contract notice: Installation services of transformers
TOT Ref. No.
35698727
Document Ref. No.
397357-2019
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
22 Aug 2019
Bid deadline
30 Sep 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Installation services of transformers
Description: Contract notice: Installation services of transformers
Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 51111300, 51111100, 31174000, 31218000, 31230000, 31110000, 45317300, 51111300, 51111100, 31174000, 31218000, 31230000, 31110000, 45317300
CPV Description: Installation services of transformers.
Installation services of electric motors.
Power supply transformers.
Busbars.
Parts of electricity distribution or control apparatus.
Electric motors.
Electrical installation work of electrical distribution apparatus.
Reconstruction of the power supply system of the auxiliary boiler room in scope of execution of executive designs and their implementation for P.GE GiEK S.A. Opole Power Plant Department
Reference Number: POST / GEK / GEK / PMR-ELO / 05538/2019
Reconstruction of the power supply system of the auxiliary boiler room in the scope of execution of executive designs and their implementation for PGE GiEK S.A. Opole Power Plant Branch.
Main Site: PGE GiEK S.A. Branch Opole Power Plant, ul. Elektrowniana 25, 45-920 Opole, POLAND
Reconstruction of the power supply systemauxiliary power boiler room in the scope of execution of executive designs and their implementation for PGE GiEK S.A. Branch Opole Power Plant.
Implementation (design and implementation) of a new power supply system including:
1) new 6 / 0.4 kV distribution system in the form of: two transf. 6 / 0.4 kV with a capacity of not less than 2, 000 kVA each and two chapters 0.4 kV;
2) remote supervision in the field of visualization and pin the SOP pol system in chapter RR1 feeding transf. and the new transf system. and switchgear along with the SZR / PPZ automation system;
3) changing the power supply method and capacity of 3 network pumps;
4) introducing and connecting to all switchgears all existing cables connected to the existing switchgears.
Liquidation of chapter 6 kV and 0.4 kV with all cables and controls associated with them: dismantling, dismantling and segregation as well as transport to a scrap warehouse or appropriate dump, depending on the type of waste.
Construction repair of 0.4 kV switchgear rooms, transfer chamber. and cable.
Post-assembly measurements and reports.
As-built documentation of the new power supply system.
Detailed Description of the Object of the Order is included in Annex 1 to the ToR.
Contractors who are not subject to exclusion pursuant to art. May apply for the Contract. 24 paragraph 1 (subject to Article 133 (4)) and Article 24 paragraph 5 item 1 of the Public Procurement Law
the Contractor is obliged to submit, together with the offer, the declaration valid for the day of submitting the offers, regardingmentioned in art. 25a section 2 of the Public Procurement Law, in the form of a single European order document, hereinafter referred to as "EAT", and the file must be provided with an Electronic Signature in accordance with the provisions described in point 17 of the ToR.
in the proceedings.
Contractor who refers to the resources of others afterentities, in order to demonstrate the absence of grounds for exclusion and compliance with them, to the extent that their resources are referred to, the conditions for participation in the Proceedings, is also submitted by the JEDZ regarding these entities in electronic form in accordance with the provisions described in point 16 of the ToR. in the event of joint application by the Contractors, JEDZ shall be submitted by each of the Contractors jointly applyingh for Order. These documents confirm the fulfillment of the conditions for participation in the procedure and the lack of grounds for exclusion to the extent in which each of the Contractors demonstrates that they meet the conditions for participation in the Procedure and no grounds for exclusion. Public Procurement Law Acts), and in the absence of grounds to apologizeconducting an electronic auction, prior to the award of the contract (pursuant to Article 26 (1) of the Public Procurement Law), to confirm compliance with the conditions for participation in the procedure and the lack of grounds for exclusion from the procedure, call Contractors whose offers are not subject to rejection, to submit the following statements and documents (confirming the lack of grounds for excluding the Contractor from participation inproceedings):
- information from the National Criminal Register in the scope specified in art. 24 paragraph 1 item 13 14 of the PPL Act, subject to Art. 133 section 4 of the Public Procurement Law (applies to: natural persons, a member of the management board, a member of supervisory boards, proxies, associates of public and partner companies, general partners in a limited partnership or limited joint-stock partnership) issued not earlier than 6 months byd the deadline for submitting bids,
- information from the National Criminal Register in the scope specified in art. 24 paragraph 1 point 21 of the Public Procurement Law (information should relate to collective entities) issued not earlier than 6 months before the deadline for submitting bids,
- an extract from the relevant register or from the Central Register and Information on Economic Activity, if separate provisions requireisu to the register or records in order to demonstrate the lack of grounds for exclusion pursuant to art. 24 paragraph 5 item 1 of the Public Procurement Law,
- in order to demonstrate the lack of grounds for exclusion based on art. 24 paragraph 1 point 15 of the Public Procurement Law, in the event of a final court judgment being issued to the Contractor or a final administrative decision on arrears in the payment of taxes, fees or social security contributions lHealth insurance - documents confirming the payment of these debts together with any interest or fines or conclusion of a binding agreement on the repayment of these debts,
- the Ordering Party will assess the conditions for exclusion from the procedure, including in art. 24 paragraph 1 point 22 of the PPL Act on the basis of information contained in JEDZ.
In the case of joint application for the contract prwith two or more Contractors, the documents are submitted separately by each Contractor.
If the Contractor uses the resources of another entity under the conditions set out in art. 22a of the PPL, these documents are submitted by each of these entities.
Note: Documents referred to in item 12.5.1. ToR submitted at the request of the Ordering Party, must be valid as at the date of their submission.
1. Purchaserinforms that the public procurement procedure will be conducted using the PGE CG Purchasing System. To make an offer in the procedure, the Contractor is required to register in the PGE CG Purchasing System available at: https://swpp2.gkpge.pl. Other information regarding the PGE CG Purchasing System and submission of bids is contained in the ToR.
2. Contractor, within 3 days fromplacing on the website information from the opening of offers, referred to in art. 86 section 5 of the Public Procurement Law, provides the Employer with a declaration of belonging or not belonging to the same capital group as referred to in art. 24 paragraph 1 point 23 of the PPL Act. together with the submission of the statement, the Contractor may provide evidence that links with another Contractor do not lead to disruption ofcompetition in the procurement procedure. A model statement will be made available to Contractors on the Employer's website along with the information referred to in art. 86 section 5 of the Public Procurement Law
Each of the Contractors jointly applying for the award of the contract should separately submit a declaration of belonging or not belonging to the same capital group.
3. Ordering partyeża the requirements related to the implementation of the contract pursuant to art. 29 paragraph 3a of the PPL Act:
3.1. The Contractor, accepting the order for implementation, will ensure that among persons directly participating in the performance of the contract they are employed on the basis of an employment contract (in accordance with Article 22 -1 and Article 25 -1 of the Labor Code, Journal of Laws of 2018, item 917, as amended) persons:
- performing activities related to the work of mo- performing activities related to post-assembly tests and commissioning works.
3.2. In the case of hiring a new person performing the above-mentioned order activities in the mode referred to in item 10.3.1. ToR, employment should take place within a maximum of 7 calendar days from the date of commencement of the contract and should be continuous throughout the entire period of performanceagreement. In the event of termination of employment of a person employed by the Contractor or Subcontractor before the end of this period, the Contractor shall be obliged to employ within 7 calendar days (counting from the date of termination of employment) for the place of another person, in the manner referred to in point 10.3. 1. Terms of Reference.
4. In connection with the entry into force of the Regulation of the European Parliament and of the Council (EU) 2016/ 679 of 27.4.2016 on the protection of individuals with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46 / EC (general regulation on data protection) (hereinafter the "GDPR") we inform that a message regarding the processing of personal data, available on the website https://pgegiek.pl/Przetargi/Przetargi-zakupowe.are required to read the content of this message.
5. All other information not included in this announcement is described in detail in the ToR with attachments, which is available on the Awarding Entity's website: https://swpp2.gkpge.pl → Public and non-public procurement as well as Technical Dialogue / Competition / RFX, Dynamic System Purchasing Companies PGE Group → Current → Rekodescription of the power supply system of the auxiliary boiler room in the scope of execution of executive designs and their implementation for PGE GiEK S.A. Branch Opole Power Plant.
Internet address (URL): www.pgegiek.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Installation services of transformers was 30 Sep 2019. Bidding is closed.

This tender has been issued by PGE GÓRNICTWO I ENERGETYKA KONWENCJONALNA S.A. in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 51111300 - Installation services of transformers, 51111100 - Installation services of electric motors, 31174000 - Power supply transformers, 31218000 - Busbars, 31230000 - Parts of electricity distribution or control apparatus, 31110000 - Electric motors, 45317300 - Electrical installation work of electrical distribution apparatus.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 35698727. The purchaser document reference is 397357-2019.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Defence and Security, Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.