Expired Tender Poland ICB TOT Ref. 39055489

Contract notice: Installation of road lighting Tender - 39055489

Tender notice from Poland, published on 18 Dec 2019.

Executive Summary

The GMINA MIASTO AUGUSTÓW has issued a Tender notice for the procurement of a Contract notice: Installation of road lighting equipment in the Poland. This Tender notice was published on 18 Dec 2019 and is scheduled to close on 28 Jan 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 39055489, while the tender notice number is 599634-2019 and Register on the platform.

Key facts

Summary
Contract notice: Installation of road lighting equipment
TOT Ref. No.
39055489
Document Ref. No.
599634-2019
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
18 Dec 2019
Bid deadline
28 Jan 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Installation of road lighting equipment
Description: Contract notice: Installation of road lighting equipment
Authority Type: Regional or local authority
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45316110, 45316100, 45310000, 31520000, 71355200, 45316110, 45316100, 45310000, 31520000, 71355200
CPV Description: Installation of road lighting equipment.
Installation of outdoor illumination equipment.
Electrical installation work.
Lamps and light fittings.
Ordnance surveying.
Improving energy efficiency by modernizing street lighting infrastructure in the city of Augustow
Reference Number: ZP.271.36.2019
1. 1. Description of LED luminaires
Main Site: Area of the Municipality of Augustow
The contract includes:
a) replacing existing lighting fittings and extension arms with modern fittings
In LED technology meeting the PN-EN 13201 standard, on supporting structures of power lines and separate lighting lines, in the amount of 2037 pcs (Annex 8 - Technical inventory and table of luminaires),
b) replacing existing park luminaires with modern luminaires in LED technology in quantity334 pcs (Annex 8 - Technical Inventory and table of luminaires),
c) RES installation, i.e. 5 street lighting luminaires supplied from a photovoltaic installation,
d) replacement and installation of booms for arc,
e) existing control and energy measurement points electric road lighting in case of installation in LV switchgears. At the station, it is possible to build control and SO boxesmeasuring road lighting by attaching it to existing stations and supply it with an ASXSn cable from a fuse switch disconnector. Number of measuring and control systems subject to modernization 77 units,
f) application and installation of an intelligent energy control and management system (hereinafter referred to as the "System"), which will allow automatic change of lighting parameters, comparing them to current requirements resulting from changing traffic situations. It is also a solution informing the lighting manager about work and lighting failures,
g) carrying out tests, measurements and photometric calculations (in accordance with PN-EN13201 or equivalent) for the entire scope of the contract,
h) technical design,
i) making available Employer of IT systemlighting control with the possibility of remote monitoring of the built infrastructure,
j) granting the Ordering Party an unlimited territorial free license to use the system for remote monitoring of the built infrastructure for a minimum of 10 years,
k) technical support and constant system software update during the warranty period,
l) The contractor must adapt the existing onesstreet lighting circuits for the newly built control system. Newly rebuilt lighting circuits after modernization must be able to control existing circuits,
m) The Contractor will install bucket type fuse connectors on all lighting poles and replace power cables to all replaced luminaires,
n) Achieving an ecological effect at annual levelreduction of greenhouse gas emissions (CO2 equivalent) in the amount of 660.95 Mg / year during the full five calendar years after the order has been completed, which will be confirmed by reports prepared by the Contractor for each year of operation of modernized street lighting, with the Contractor being part of the order will obtain acceptance of submission on its own and at its own expenseh Employer reports by the Verifier. A verifier may be a person with the power of an energy auditor in the form of a certificate of completion of a qualification course or postgraduate studies, entered on the list of auditors of the Ministry of Infrastructure and Development or belonging to the Association of Energy Auditors or being a certified energy auditor / expert entered in the registerru PolSEFF,
o) other works and works necessary for the proper performance of the subject of the contract, including, inter alia:
- developing a traffic organization design for the duration of the work, (...)
The detailed scope of work (Description of the Subject of the Order) is included in Annex 1 to the ToR Description of the subject of the order.
6.1. Contractors who are not subject to exclusion may apply for awarding the contractmeet the conditions of participation specified in the contracting authority
In the proceedings.
6.2. Contractors who meet the conditions relating to:
6.2.1 may apply for the contract. competences or authorizations to conduct a specific professional activity, provided that it results from separate provisions:
The Employer does not specify the condition in the abovementioned range.
7.1. Contractors are excluded from the contract award procedurein relation to which any of the circumstances referred to in art. 24 paragraph 1 point 12 23 of the PPL Act
7.2. The contracting authority additionally provides for the grounds for exclusion specified in art. 24 paragraph 5 points 1, 2, 4 and 8 of the PPL Act
8.1. The Contractor is obliged to submit along with the offer, via the miniPortal: https://miniportal.uzp.gov.pl, current statement as at the date of submission of offerswith preliminary confirmation that the Contractor:
a) is not subject to exclusion,
b) meets the conditions for participation in the procedure.
8.2. The statement referred to in point 8.1 of the ToR the Contractor is obliged to submit in the form of a uniform document drawn up in accordance with the template of the standard form set out in the Implementing Regulation of the European Commission 2016/7 of 5 January 2016 issued on the basis ofrt. 59 clause 2 of Directive 2014/24 / EU, hereinafter referred to as the "Single Document" or "EAT". according to Annex 4 to the ToR.
8.3. The Contractor within 3 days from the date of posting on the Employer's website information referred to in art. 86 section 5 of the Act (information
From the opening of offers), is obliged to provide the Ordering Party with a declaration of belonging or not belonging to the samej of the capital group referred to in art. 24 paragraph 1 point 23 of the PPL Act. In the case of belonging to the same capital group, the Contractor may submit, together with a statement, documents or information confirming that links with another Contractor do not lead to distortion of competition in the proceedings. A specimen declaration is attached as Annex 5 to the ToR.
9.6. The contracting authority demands from the contractor that it consistson the abilities or situation of other entities on the principles set out in art. 22a of the Public Procurement Law, submitting documents referred to in point 8.7.2 SIWZ.
9.7. In order to assess whether the contractor relying on the capabilities or situation of other entities on the principles set out in art. 22a of the Act, will have the necessary resources to the extent necessary for proper implementation ofpublic speaking and assessing whether the relationship between the contractor and these entities guarantees real access to their resources, the contracting authority may request documents that specify in particular: the scope of resources available to the contractor of another entity; the way the contractor uses the resources of another entity when performing a public contract; scope and period of participation of another entity in the implementation ofpublic procurement; whether the entity, on the abilities of which the contractor relies in relation to the conditions of participation in the proceedings regarding experience, will carry out the works or services to which the abovementioned capacities relate.
9.8. Contractor, which refers to the resources of other entities, in order to demonstrate the absence of grounds for exclusion and fulfillment, in the scopethem refers to their resources, the terms of participation in the proceedings are also submitted by JEDZ regarding these entities.
9.9. Subcontractors.
The contractor who intends to entrust the performance of part of the contract to subcontractors, at the stage of the procurement procedure:
a) is required to complete Part II, Section D EAT and, if known, provide subcontractor companies,
b) is not obliged to pprovide for each subcontractor the information required in Part II section A and B and part III EAT, (the Employer also does not request submission of documents specified in point 8.7.2 of the Terms of Reference to subcontractors indicated in part II of section D EAT)
c) is required to indicate in the form offer Annex 3
Document confirming that the contractor is insured against civil liability in respect of provisionsperformed activities related to the subject of the contract for a guarantee sum specified by the Employer - for an amount of not less than PLN 3, 000, 000.00.
Continuation of section: III.1.3) ... social or health insurance or that it has entered into an agreement with the competent repayment authority these receivables, together with any interest or fines, in particular, he obtained the exempted by lawe, deferment or installment of overdue payments or withholding in full the execution of the decision of the competent authority issued not earlier than 3 months before the deadline for submission of bids,
- its liquidation has not been opened or bankruptcy has been announced - issued earlier than 6 months before the deadline submitting bids.
8.11. The documents referred to in item 8.10 of the Terms of Reference should beissued not earlier than 6 months before the offer submission deadline.
12.1. The Contractor is obliged to lodge a security deposit of PLN 120, 000.00 (say: one hundred and twenty thousand zlotys).
12.2. The bid bond may be lodged in one or several of the following forms:
a) money;
b) bank guarantees or cooperative sureties from the savings and credit union, provided that the guaranteesy is always a financial guarantee;
c) bank guarantees;
d) insurance guarantees;
e) guarantees granted by entities referred to in art. 6b paragraph 5 points 2 of the Act of November 9, 2000 on the establishment of the Polish Agency for Enterprise Development (Journal of Laws of 2019, item 310 as amended).
12.3. The deposit made in cash should be paid by bank transfer to the following bank accountEmployer:
87 1240 5211 1111 0000 4921 6440 with the annotation "Bid bond Case mark: ZP.271.36.2019 - Improvement of energy efficiency by modernizing street lighting infrastructure in the city of Augustow"
12.4. The deposit will be considered effective by paying the deposit, which will be on the client's bank account before the deadline for submitting bids.
12.5In the event of a deposit in the form of a bank or insurance guarantee, the guarantee must be an irrevocable, unconditional guarantee
and payable at the first written request of the contracting authority, drawn up in accordance with the applicable provisions and should contain the following elements:
a) the name of the principal (contractor), the beneficiary of the guarantee (contracting authority), guarantor (bank or insurance institution withdividing guarantees) and an indication of their registered offices,
b) amount of the guarantee,
c) the term of validity of the guarantee in the formula: "from ....... to .......",
d) commitment guarantor to pay the amount of the guarantee at the first request of the awarding entity in the situations specified in Article 46 paragraph 4a and paragraph 5 of the Act of 29 January 2004 Public Procurement Law.
12.6. The bid bond paid in the form specified inpoint. 12.5 above may not contain information that "the warranty expires when the original document is returned." .rtf, .xps, .odt and signed with a qualified electronic signature under pain of nullity. Method of submitting the offer, including encryption oferty is described in the Regulations of using the miniPortal (https://miniportal.uzp.gov.pl/WarunkiUslugi.aspx),
—21.1. The contractor whose offer is considered the most advantageous will be required to provide a security on due performance of the contract in the amount of 10% of the gross price of the offer (including VAT) in respect of each part of the contract,
referred to in art. 67 section 1 point 6 and 7 of the Public Procurement Law,
- The two-month period specified in Section IV.2.6) shall be understood as 60 days calculated from the set date for submission of bids,
- Detailed information on the conditions of participation in the proceedings is included in Chapters 6, 7 and 8 SIWZ,
- Due to the limited number of characters that can be entered into the content of the advertisement, other information is includedin the ToR available together with this announcement on the Awarding Entity's website at: http: //bip.um.augustow.pl
Internet address (URL): http://www.urzad.augustow.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Installation of road lighting equipment was 28 Jan 2020. Bidding is closed.

This tender has been issued by GMINA MIASTO AUGUSTÓW in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45316110 - Installation of road lighting equipment, 45316100 - Installation of outdoor illumination equipment, 45310000 - Electrical installation work, 31520000 - Lamps and light fittings, 71355200 - Ordnance surveying.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 39055489. The purchaser document reference is 599634-2019.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate, Defence and Security in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.