Expired Tender Romania ICB TOT Ref. 39197609

Contract notice: Installation of pipe system Tender - 39197609

Tender notice from Romania, published on 23 Dec 2019.

Executive Summary

The S.C. RAJA S.A. CONSTANȚA has issued a Tender notice for the procurement of a Contract notice: Installation of pipe system in the Romania. This Tender notice was published on 23 Dec 2019 and is scheduled to close on 28 Feb 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 39197609, while the tender notice number is 610762-2019 and Register on the platform.

Key facts

Summary
Contract notice: Installation of pipe system
TOT Ref. No.
39197609
Document Ref. No.
610762-2019
Country
Romania
Notice type
Tender
Competition
ICB
Publication date
23 Dec 2019
Bid deadline
28 Feb 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Installation of pipe system
Description: Contract notice: Installation of pipe system
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45231112, 45232400, 45231112, 45232400
CPV Description: Installation of pipe system.
Sewer construction work.
Main collectors in Constanța municipality
Reference Number: 1890420/2019/25 / CL 49 POIM
The execution activities for the contract for main collector works in Constanța municipality are grouped as follows:
Main Site: Constanta County
The execution activities for the Works Contract Water and sewerage networks in the central area aConstanta municipality is grouped as follows:
Object 1 Unloading pipe U6 contains 3 sections as follows:
• Existing section 1 Ovoid Concrete 2500/3750, L = 115 m
• Transition room Existing reinforced concrete room
• Existing section 2 Conduit OL DN1600, L = 60m
• Section 3 Existing pipe DN1600 Concrete, L = 750 m
Object 2 Discharge pipe U2
• Section 1 Existing pipe DN1600 OL, L = 138 m
• Upstream chimney CN1
• Existing section 2 DN1600 OL, L = 26 m
• Downstream chimney CN2
• Section 3
• Center CN3
• Section 4
• Connection to existing pipe - pipe
Object 3 Collector U3 Aurel Vlaicu Boulevard
Object 4 Collector Ion Cassian
Section 1 Existing Ovoid 800/1200, L = 97 m
Existing section 2 Ovoid 1100/1650, L = 270 m
Object 5 - Vacuum excavator with capacity8 mc.
The duration provided in Section II.2.7 represents the period of execution of the works and does not include the guarantee period of 1095 days
Requirement no. 1.
The bidders, associations, third-party supporters and subcontractors must not find themselves in the situations provided for in art.177, art.178 and art.180 of the Law 99/2016 regarding sectoral procurement.Requirement initiation: The DUAE will be completed by all operators participating in the procedure (Bidders, associations, third parties and subcontractors), with the information related to their situation. contracting, only by the bidder ranked first. Informatiile of the aforementioned certificates must be real / valid at the time of their presentation. power of representation, decision or control within it, as it results from the certificate constatator issued by the ONRC / the constitutive document;
A Certificate confirming the lack of outstanding debts regarding the payment of taxes, taxes or contributions to the consolidated general budget at the time of their presentation.
O If applicable, documents proving that the economic operator can benefit from the derogations provided in art. 179 para. (2), art.180 para. (2), art. 184 of Law 99/2016 on sectoral procurement;
O Other edifying documents, as the case may be.
Non-resident economic operators (foreigners) have the right to present any edifying documents to prove that they have fulfilled their obligations to pay taxes, taxes and contributions to the general consolidated budget, in accordance with the requirements of the country of origin or the country inwhich the bidder / candidate is established, issued by the competent authorities of the country of origin (such as certificates, tax filings or other equivalent documents). The documents will be presented with the authorized translation into Romanian.
Note 1: Any economic operator in any of the situations provided in art. 177, 178 and 180 of Law 99/2016, which attract exclusionsthe area in the award procedure may provide evidence to show that the measures taken by it are sufficient to demonstrate in particular its credibility by reference to the reasons for exclusion in accordance with the provisions of art 184 of law 99 / 2016.
Note 2: The forms and / or the documents requested above, will be presented by the bidder ranked first, by each member of the association(in the case of an association), and, if applicable, by the subcontractor and the third party supporter.
Requirement no. 2- Avoidance of conflict of interests
The bidders, associations, third parties and subcontractors must not find themselves in the situations provided in art. 72 and 73 of Law no.99 / 2016 on sectoral acquisitions updated.
The manner in which the fulfillment can be demonstratedRequirement: The DUAE will be presented completed by the bidder / candidate, third party supporter and subcontractor, as the case may be, with relevant information, according to art. 202-204 of Law no. 99/2016 updated.
The persons with decision functions within the contracting entity regarding the organization, the development and the completion of the award procedure are presented in the statement of the head of the contracting entityaunts, part of the public procurement file and are the following:
1. Felix Stroe General Manager;
2. Aurel Presura - Deputy General Manager;
3. Tereza Baranescu - Economic Director;
4. Elena Sfrija - Legal Director;
5. Ion Preda - Director of External Development and Finance;
6. Stelian Budes - Deputy Director of External Development and Finance;
7. Rodica Mihai - Adj. Director of Development and FinanceForeign air;
8. Adriana Lascu - Adj. Director of Development and External Finance
9. Antoniu George ... details on www.e-licitatie.ro
General annual turnover The minimum annual turnover, achieved in each of the last three years (2016, 2017, 2018) must be greater than or equal to 18, 000. 000.00 RON. If more economic operators jointly participate in the award procedureyea, the fulfillment of the criteria regarding the economic and financial situation is demonstrated by taking into account the resources of all the members of the group. Each economic operator (single bidder / associated bidder) will complete the corresponding fields in the DUAE regarding economic and financial capacity. Third Party Supporter If the tenderer demonstrates his economic and fine situationthe contractor also invoking the support granted by one or more third parties, then the tenderer has the obligation to prove to the contracting entity that he has taken all the necessary measures to have access at any time to the necessary resources, presenting a commitment in this regard from the third party / third parties . According to art. 198 of Law no. 99/2016 economic operator third party / third party supporter/ the supporters will answer jointly and severally for the execution of the sectoral contract. By the firm commitment, the third party / third party will confirm that they will support the tenderer in order to fulfill the contractual obligations, either by specifying the way in which they will / will intervene concretely in order to fulfill the respective obligations for which he has provided the support, either by indicating resourcestheir financials that they will make available to the tenderer (describing the concrete way in which he will do this). With the support commitment, the bidder has the obligation to present documents transmitted to it by the third party (s), from which it will be shown the way of fulfillment by which the third party (s) the supporter (s) will / will ensure the fulfillment of his / her support commitment.comments that will be annexed to the respective commitment. The supporting third party will respond in solidarity with the bidder, unconditionally, to the contracting entity for not fulfilling any obligation assumed by the bidder, based on the sectoral contract, and for which the latter has received the economic and financial support according to this commitment, renouncing in this sense, definitive and irrevocable, when invoking the benefit of division and discussion. Each third party supporter will complete the appropriate fields in the DUAE regarding economic and financial capacity. The third party must not be in the situation provided by art. 177, 178 and 180 of Law 99/2016, under the sanction of exclusion from the award procedure.
- See Suspension Clause - ANNEX toYES,
- The bidders have the obligation to carefully analyze the Attribution Documentation and to prepare the tender according to all the instructions, forms, contractual provisions and technical specifications contained in this Documentation,
- The bidders are recommended to inspect the project location and the surroundings to evaluate, at your own risk, expense and risk, the necessary data for pentru to prepare the offer,
- We mention that to view the award documentation uploaded in SICAP, the economic operators must have a program necessary to view the electronically signed files, this program being available free of charge on the websites of the electronic signature providers,
- One economic operator can only participate in the procedure if it is registered in SICAP,
- Corethe spouse and all the documents submitted by the economic operators will be in Romanian, or accompanied by an authorized translation in Romanian,
- The award documentation is posted in full within the participation announcement published on the site www.e-licitatie.ro,
- Requests for clarification of potential bidders will be addressed exclusively in SICAP to the "Questions" section within the prthe award proceedings carried out by electronic means,
- The answers to the requests for clarifications will be posted in legal term under the "Documentations, clarifications and decisions" section of the participation announcement published on the website www.e-licitatie.ro,
- The Commission of evaluation will send clarification requests regarding the submitted offers, in SICAP to the "Questions" section. Economic operators vor sends the answers to clarifications and any documents requested during the evaluation of the offers through the SICAP ("Questions" section), fully in the section corresponding to the respective request, in the form of one or more distinct documents / files signed with the valid extended electronic signature, based on a qualified certificate not suspended or revoked at the momentsigning of the offer in accordance with the legal provisions regarding the electronic signature,
- In the case of the bidders (natural or legal persons) of a nationality other than the Romanian one, the documents will be transmitted in the language in which they were issued, accompanied by their authorized translation into the language Romanian,
- In case two or more offers ranked first have equal scores, bidders will be asked for a new financial proposal, in which case the contract will be awarded to the bidder whose new financial proposal has the lowest price and obtains the highest total score,
- The duration of the execution contract is 547 days (from the date of issue the order for the start of the works).
The duration of the warranty period is 1095 days.
NOTE
Given the fact that it startsnd with the date of 08.04.2019, the Single European Procurement Document (DUAE) was integrated in the SICAP, the bidders, associations, third-party supporters and subcontractors will individually complete the DUAE in the SICAP, according to the instructions given by ANAP and the User`s Guide.
Internet address (URL): http://www.rajac.ro/

Documents

Tender Notice
Login to view

Similar tenders

Romania Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Installation of pipe system was 28 Feb 2020. Bidding is closed.

This tender has been issued by S.C. RAJA S.A. CONSTANȚA in Romania.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45231112 - Installation of pipe system, 45232400 - Sewer construction work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 39197609. The purchaser document reference is 610762-2019.

See the Similar Tenders section on this page or browse other tenders from Romania.

This tender falls under Construction and Real Estate in Romania. Suppliers in these sectors can track similar Romania tenders using CPV-based alerts.