Expired Tender Bulgaria ICB TOT Ref. 29903272

Contract notice: Installation of outdoor Tender - 29903272

Tender notice from Bulgaria, published on 17 Jan 2019.

Executive Summary

The ?????? ????? has issued a Tender notice for the procurement of a Contract notice: Installation of outdoor illumination equipment in the Bulgaria. This Tender notice was published on 17 Jan 2019 and is scheduled to close on 19 Feb 2019, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 29903272, while the tender notice number is 022851-2019 and Register on the platform.

Key facts

Summary
Contract notice: Installation of outdoor illumination equipment
TOT Ref. No.
29903272
Document Ref. No.
022851-2019
Country
Bulgaria
Notice type
Tender
Competition
ICB
Publication date
17 Jan 2019
Bid deadline
19 Feb 2019
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Installation of outdoor illumination equipment
Description: Contract notice: Installation of outdoor illumination equipment
Authority Type: Regional or local authority
Contact Nature: Works
Procedure: Competitive procedure with negotiation
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 45316100, 45316100, 45316100
CPV Description: Installation of outdoor lighting equipment
Implementation of energy saving measures, modernization and repair of street lighting on the territory of Municipality of Devnya through a contract with a guaranteed result
The following is envisaged:
Main Site: The territory of Devnya Municipality
Is envisaged:
Replace street and park lighting with new energy-efficient. In implementing this measure, replacement of lighting is foreseenwith modern energy-efficient lighting fixtures in order to ensure the regulatory requirements for the respective class of streets and park areas. The technical decisions of the participants should be tailored to the specific architectural and cultural features of certain areas of the city and / or the existing luminaries, without altering their design. The participants do not have tokeep the number of functioning luminaires on, and the streets and park areas are lit according to the normative requirements, ie. may provide for the installation of the same number of smaller or larger number of luminaires as long as the appropriate illumination and the realization of the energy savings are achieved. According to the energy audit performed, construction / installation should be carried outof new street light cassettes in a suitable place. Remedy of faults on the supply network for the duration of the contract. Energy management of the lighting system of the municipality. Devnya;
New intelligent system for control, monitoring and control of street and park lighting. When implementing this energy-saving measure, the new management system is envisagedat least the functions described in the technical specification
3.1.1. The applicant or participant in the present procedure must be entered in the Central Professional Register of Constructors for the execution of construction works of the 3rd, 3rd or higher category. The certificate must be accompanied by a valid coupon under Art. 23, para. 1 of the Rules for the procedure for entry and maintenance of the Central Professional Registrybuilder or a valid equivalent document issued by a competent authority to foreign candidates or participants. It is proved by the presentation of: a copy of the document for registration in the CPSR to the Chamber of Builders of the Republic of Bulgaria, according to art. 3, para. 2 of the CPA, and for foreign persons an analogous document proving such registration in a similar register, according to the legislationo of the country in which they are established. The applicant should have a ratio of assets and liabilities for the last 3 (three) financial years (2015, 2016 and 2017), depending on the date on which the participant is established or commenced its business, at the rate of not less than 1 At the stage of entering into a contract, the participant selected for the contractor shall submit one or more of the following documents, in therelation to set requirements:
certificates from banks; annual financial statements or their components when required to be published; reference for total turnover. 3.2.2. Candidates and participants must hold a valid professional liability insurance under Article 171 (1) of the TDA in order to carry out construction works for sites of Group III, III or IIIhigher category, or equivalent insurance under the national law of the participant if he is a non-resident, with a term of validity not less than the validity of the offer. At the stage of entering into a contract, the participant selected as contractor shall submit: a certified copy of a valid insurance policy under Art. 171, para. 1 of the TDA for Professional Responsibility in Constructionture. Foreign persons submit an equivalent document of the insurance under Art. 171, para. 1 of the TDA, issued by the competent authorities of the state in which they are established
(continued from II.1.4.): Place
3 / Remedying of accidents occurring during the supply chain during the term of the contract
4 / Energy Management of The total lighting system Devnya; 5 / New Intelligent Control, Surveillance and Monitoring Systemstreet and park lighting management. When implementing this energy saving measure, a new management system is foreseen which has at least the functions specified in the technical specification of the order. Requirements for personal status. The Contracting Authority shall remove from participation in the procedure a participant for whom at least one of the circumstances referred to in Art. 54, para. 1, items 1-7 of the HOPs, namely convictions for crimes under Art. 194-208, Art. 213a-217, Art. 219-252 and Art. 254a-255a and Art. 256-260 of NC; violations under Art. 61, para. 1, Art. 62, para. 1 or 3, Art. 63, para. 1 or 2, Art. 228, para. 3 of the Labor Code; violations under Art. 13 para. 1 of the Labor Migration and Labor Mobility Act; circumstances under Art. 3, item 8 of ЗИФОДРУПДРКЛТДС, if the exceptions under Art. 4; thoroughlyunder Art. 69 of the Law on Protection of Competition; as well as participants representing related parties pursuant to - 2, item 45 of the Law on State Ownership. The absence of these circumstances is evidenced by the completion of Part III of the EUEDOP in the applicable fields according to the documentation in the documentation. The Contracting Authority shall require from the participant selected for execution a declaration under Art. 59, para. 1, item 3 of the LMML. Other axes. for removal. - according to Art. 107 of the Public Procurement Act. The warrantyfor the execution of the contract, the contractor shall submit, at the signing of the contract, 5% of the value of the contract without VAT. The guarantee is provided in one of the following forms: cash amount; Bank guarantee; insurance. If a bank guarantee is presented, it must be unconditional and irrevocable, the name of the contract must be recorded and thefor a period of validity of at least 30 days after the end of the contract, insurance covering performance by covering the contractor's liability. The insurance can not be used to secure the contractor's liability under another contract. Conditions and detention period. or release. of the performance guarantee shall be governed by the contract. Source of funding: national donorecological fund.
4. The contracting authority does not require that the groupings have a specific legal form in order to be able to submit a bid. Where the designated contractor is an unincorporated association of natural and / or legal entities, the public procurement contract shall be concluded after the contractor submits to the contracting entity a certified copy of a certificate for tax registration and registration under BULSTATin accordance with the law of the State in which the grouping is established
Internet address (URL): www.devnya.bg

Documents

Tender Notice
Login to view

Similar tenders

Bulgaria Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Installation of outdoor illumination equipment was 19 Feb 2019. Bidding is closed.

This tender has been issued by ?????? ????? in Bulgaria.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45316100 - Installation of outdoor illumination equipment.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 29903272. The purchaser document reference is 022851-2019.

See the Similar Tenders section on this page or browse other tenders from Bulgaria.

This tender falls under Construction and Real Estate in Bulgaria. Suppliers in these sectors can track similar Bulgaria tenders using CPV-based alerts.