Expired Tender Hungary ICB TOT Ref. 19381911

Contract notice: Installation of cable Tender in Hungary - 19381911

Tender notice from Hungary, published on 26 Dec 2017.

Executive Summary

The GYŐR-SOPRON-EBENFURTI VASÚT ZRT. has issued a Tender notice for the procurement of a Contract notice: Installation of cable infrastructure in the Hungary. This Tender notice was published on 26 Dec 2017 and is scheduled to close on 29 Jan 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 19381911, while the tender notice number is 516024-2017 and Register on the platform.

Key facts

Summary
Contract notice: Installation of cable infrastructure
TOT Ref. No.
19381911
Document Ref. No.
516024-2017
Country
Hungary
Notice type
Tender
Competition
ICB
Publication date
26 Dec 2017
Bid deadline
29 Jan 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Installation of cable infrastructure
Description: Contract notice: Installation of cable infrastructure
Authority Type: Utilities entity
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45314300, 45314300, 45316200, 45314310, 45231000, 45112500, 45112200, 45112320, 45314300, 45316200, 45314310, 45231000, 45112500, 45112200, 45112320
CPV Description: Installation of cable infrastructure.
Installation of signalling equipment.
Installation of cable laying.
Construction work for pipelines, communication and power lines.
Earthmoving work.
Soil-stripping work.
Land-reclamation work.
Porpac Csorna szakaszon vonal- es erősaramu kabel csereje, a lejart koezmű- es koezut keresztezesi engedelyek megujitasa, megvalosulasi tervek keszitese.
Kivitelezesi-contractual Porpac Csorna section, replacing a strong line of cable, allowing the driver to cross the crossroads, and to create a plan for realization.
Main Site: Railway of GYSEV Zrt., Porpac Csorna line section according to the technical content of the Koezbeszerzesi Documents
Porpac Replacement of a strong cable cable line at the core section, the extended test driveThe 16-hour railroad line with Porpac Csorna line, B7H line bar or with it is a universal plastic cable, SZAMKAVM (4x25) strong cable cable and 4 LPE40 drawbars, with the help of the following design work: the construction of a roadside trajectory by GYSEV Zrt
The complete start time: the cables for the line sections have an early purchase time (according to a given contractor's request for a maximum of 3 months), as indicated in the contractor's terms. The craftsmanship of the craftsmanship commissioned by atadasara is the subject of the authoritarian power to be sought• The technical content of the purchase is contained in the Koezbeszerzesi Dokumentumok (KD). Provider in the technical estate gives the taxpayers the basis on which the winning bidder will be executed on the basis of the relevant standards and six-pronged contracts.
The Auction Manager reminds us that:
- 321/2015. (X. 30.), Insofar as the documentary (technical translation) refers to a limited number of articles or works of art or a particular type of product that characterizes the products or services of a particular economic operator or for a trademark, patent, activity, for a person, a type or to a given or a production process, more standard, Technical Approval, Technical Approvals, Technical Datasheets, is referred to only in the wording of the wording of the wording of the wording, and in addition to the title, the word "or equivalent" must also be used on the basis of which the Trustee is approved to accept a uniform or documented roaming also for a solution.
II.1.6): "The epithet beruhazas framein order to ensure the timely availability of working time, and to ensure the timing of the work-related time-frame, the need for human resources (eg organizational co-ordination). There is a need for co-ordinate tasks to be performed by a timer. The epithets are a major issue of cable lossThe customer of the touring is a significant arboreal bearer. The junctions of the individual sections are justified, and they are the same in terms of craftsmanship, providing the same technical and relevant qualitative criteria. The exact fit of the cables and the same quality of the cables are provided with the continuous supply of the following service, which is the reason for the effective use of the coefficientthe principle of the principle of salvation is to ensure the safety of the ladder. In the case of the same contractor, the liability of the guarantor can not be taken into account both in material and workmanship. An additional advantage is the formation of a homogenous system (using the same technology, technical language for all the constructional stages), which can lead ton. (the content of the works of the same type makes it easy to use the results)
The construction works are made of an oesszofuge unit, which, in view of the order of the executives for each line segment (atadasa of the working room) they are not at the same time hand the sublime is always in the order created under the authorship's power. In the case of the Beled-Szil-Sopronnemeti project, the first full-time uetemkent gives the workforce a list of the author's exams. eyethe Kbt. Section 62 para. (1) to (2) exclusionary grounds have been exhausted. The Auction Manager (AK) excludes the AT, AV, or EF from the list, who are excluded from the exclusion of the above mentioned criteria (see Section 74 (1) (b)). Article 64.
Verification mod:
A) First (in advance):
In the case of the 321/2015. (X.30.) Korm. (Hereinafter: Korm.r.), the one-eared one(ESPD) must be pre-certified, h. AT does not belong to the root cause of exclusion. The ESPD was approved by the Korm.r. Section 1 (1), -------------------------------------------------------------------------------------------------------------------------- AK in Koezbeszezős Dokumentumok (KD) Provides an indication of the ESPD crusher. (1) and Section 3 (2) of the Government of the Republic of Croatia.
In the context of the AVs that are not in forcein the appropriate verdict: iranyado: Korm.r. Article 15 (2).
In the field of data bases: Kbt.69. - (11), Korm.r.6.- B) Igazolasi mod (AK Kbt. 69 (4) - (6) in the previous section):
AK prior to the performance of the previous performance the most favorable can be considered as AT, if appropriate, with additional timescales, with appropriate time limitshivni and excluded reasons of hianyanak a Korm.r III. of the Korm.r. Pursuant to - 8
(b) a non-resident member of the Korm.r. According to - 10, statements and confirmations (eg ESPDs) attached to exclusionary reasons may not be more timely than those of the present European Union Unio Official Journal (TED) lightthe day of unraveling. mods are good if the distinguished host player is certified to AT-i's namesake with a true actor to confirm that he meets the rules of the comic book.
2. Professional qualifications for professional activities:
A 322/2015. (1) c) of the Kbt. (1) (c) is that the construction work of the epitheting industry according to the 1997.eviLXVII.toerveny (Etv.)the AT tester is to be included in the names of the epitoping contractors. An AT based on non-Hungary must be registered in the country of resident or must be licensed, legitimate, or member of the organizational, or chambers in the resident country.
In the case of Hianya, AT is deemed to be incomplete by the contractor. away(ATTACHMENT): - AT - in the case of the Kbt. 65 (7), the organization providing the capacity must - by means of a statement in the ESPD - confirm that it complies with Section 65 (1) (c) for a minimum experimental test. AK accepts a simple declaration by the economic operator, ie the ESPD IV.Reset α (alpha) section must be coated, (B) For the Guest: Authentication Mod (Kbt.69. (1), if the certificate database can be submitted to the certificate, AT must provide the database with ESPD_. 4) - (6) at a later stage): - in the case of economic operators established in Hungary, the data of the names of the businessmen of the epithetics industryhe is the founder of MKIK's website. If AT is not listed in its Registered System (http://registrracio.kivreg.hu/web/index.phpframe=Search), you may be required to provide proof of the role of the registrars in the names of non-Hungarians. Section 69 para. (11), if such records are not available in AT country(aptitude or legal status) or a charter of an organizational or chamber member (s) must be submitted.
A) Pre-attestation mod (by date):
Provider of the pre-requisite for economic and pennies provided light is adequately provided by the Korm. r. Section 1 (1) and Section 5 (1) bbased on ESPD's submission. Promotion of the Korm.r. Section 2 (5) based economy, (ESPD Section IV of the ESPD, if any of the following sections are to be completed). Section 65 (6) based on the economic, penzuegy's experimental trialthey can meet the same requirements. The Kbt. Section 65 (7) based on the economic, Penzuegy's suitability to meet the needs of any body or person can meet the needs of those who have survived the legal relationship. Attendance Attorney calls the attention of the Attorneys. Section 65 para. (8), according to which the organization whose data is-the prospectus uses the economic and pensioners to justify it appropriately, 6: 419th The responsible person shall be liable for the failure of the person who has completed the service or has failed to complete the service. Section 65 (6) - (7) In the case of its application, we call the attention of the Government of the Republic of Hungary. Section 3 (2) - (3) Appropriate Application!in the light of its modus, accepts the 321 / 2015.Korm. (6) of Section 19. In this case, according to - 19 (10) of the Government Decree, the most appropriate document must be filled in by the economic operator in the Form.
B) For the Appointment: (Kb.69. (6) at a later stage):
The date of the application is the Kbt. Section 69 (4), paragraph 6-prior to the completion of the eljarast lezaro doentes, in the light of the considerations of reference, According to the following:
P.1.) Provider of the 321/2015. (X.30.) On the basis of Article 19 (1) (c) of the Act on the basis of the time preceding the deadline(for a coexistence and / or for a cable exchange), a statement (even if disaggregated) about the date when the letter was sent to the letter and when it started to work when these data were available. If the timer is 321/2015. (X.30) Gov. r. Article 19 (1) (c), noyou do not have a copy of the document because it is in a legal form in which you can not make a statement about the arbevetel, and you can justify a penzuai and a farm allowance with any other statement or document considered appropriate, instead of the appropriate test and evidence modalities. That's fineprior to the time limit, it shall be determined that it is in a legal form in which it is not possible to make a declaration of a claim on the basis of the arbitration clause, and shall not justify any modalities of proof and modalities in relation to this point. (Governmental DecreeSection 19 subsection (3).).
The line does not have forints allo information must be given in the original currency. given the foreign currency value of HUF koezzetett data using currency exchange rates koezep toertenő conversion from Soran contracting Contract notice koezzetetelenek day of validity of the Hungarian National Bank.
1st AK in the preparation of offers on the detailed koevetelmenyeket contains Koe(KD) registers can be downloaded electronically, unobtrusively, fully loaded, free of terrestrial transmissions. /Kbt.39.-(1)/
2. AK hianypotlast Kbt.71. - in accordance with the KD. AT first apply Section Kbt.81 -5.
3. All of the sub-test methods and verifiable mods have been added to the list of qualified ATs for more strictly enforced limits.
4. M.2.1. and M.2.2. point should be made available to the specialist at the time of the contractual surrender of 266/2013. (VII.11.) Government Decree (or equivalent) with the relevant technical manager's authority in the matter of the relevant professional, and the right holder shall be kept up to the end of the term of the contract. It shall enclose a statement, in which case the professionalblood vessels in chamber records, and h. the rejection of the list in the Register will result in a slight reversal of the basis of Kbt.131 (4), and in the case where the CA is the second most favorable AT. AK does not have a consular nature seatbelt. Ideas: 2018.01.15. 10:00 am, location: Beled Allomas Traffic Office. Bejaras with the secret info:KD.
6th In the present case, in a non-regulated manner, please refer to the applicable regulations of the Kbt., Pursuant to Regulations (321 / 2015.K., 322 / 2015.K.r., 307 / 2015.Korm.r.)
7. In this present form, CA proposes to designate additional epithets that closely adhere to these works, in the context of which it is indicated in the present description of the present invention, to withdraw the above-mentioned framework clause of Section 98 (3)-Please provide the information below according to Kbt98 (3):
- planned epithet beruh.targya: 20 tram line line Porpac Szombathely line line, line and strong cable cable and 4 LPE40 drainage tubes with new cables in the test track was invested by GYSEV Zrt. in accordance with the export plans, Porpac (989 79 hm) Vep (1072 50 hm) Vep (1072 50 hmsz) Sat(1149 50 hmsz) line section,
- designed epitesi beruh.shop.fjellele: succulent forras possessed allasa,
- AK is epithet beruh. when it came to the limitations of the later epithet. (with regard to the limitation of the uniformity of the force), for which, in view of the above, (P.1, M.1, M.2.1, M.2.2, M.2.3) with hM1.alk Ak 12kabelkm ref- at ir i will be forthcoming.Fiz's terms: in the same way as in this test: export from 2 to 2. The reasons related to the present-day approach will not be secured.
8. Timekeeper with the content frame is in denial-netto respectability is borne by the biralati szempontok koezoett.
9. Eljaro is responsible for accreditation. Korenyi Sarolta (registration number: 00193) deputy: Anita Toth (00927).
10. The winning bidder must have a liability insurance contractor during the execution of the contract as stipulated in the contractor and KD. Tenderer uses the Kbt.75 in the justification.- (2) bek.e) of
. 13th The Kbt.138.- (1), (5) the fulfillment oesszaranya AV i can not be toebb than 65%, and v not permitted to use 65% excess of the Another koezreműkoedőt
14th. The Bid component koeteles attached professional offers (arazott koeltsegvetes) according to the KD.
15th szuekseges enclose and (according KD)
bidder - felolvasolapot PPA. According to Section 68 (4); advance payment, taccept / disable the approval / declaration of approval arrows, arrows. (cf. Section 66 (6) a), b); alairo alairasi cimpld.v.aliirasi sample v. one-off document, authorized person: authorized.
Other verifications / declarations: by KD.
Internet address (URL): http://www.gysev.hu
Directive: Classical Directive (2014/25/EU)

Documents

Tender Notice
Login to view

Similar tenders

Tender Country TOT Ref. No. Bid deadline
Csongrad Sgt. Road Development, Bicycle Path Construction Hungary 152587320 03 Dec 2026
Complex Renovation of Municipal Apartments / 2026. Hungary 152582982 23 Nov 2026
Execution - Rozsa U. Renovation 2026 Hungary 152551822 17 Dec 2026
Building a Solar System in 2 Parts Hungary 152540975 14 Dec 2026
56-56 Accessibility of Tram Line Platforms Hungary 152540740 01 Dec 2026

Hungary Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Installation of cable infrastructure was 29 Jan 2018. Bidding is closed.

This tender has been issued by GYŐR-SOPRON-EBENFURTI VASÚT ZRT. in Hungary.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45314300 - Installation of cable infrastructure, 45316200 - Installation of signalling equipment, 45314310 - Installation of cable laying, 45231000 - Construction work for pipelines, communication and power lines, 45112500 - Earthmoving work, 45112200 - Soil-stripping work, 45112320 - Land-reclamation work.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 19381911. The purchaser document reference is 516024-2017.

See the Similar Tenders section on this page or browse other tenders from Hungary.

This tender falls under Construction and Real Estate in Hungary. Suppliers in these sectors can track similar Hungary tenders using CPV-based alerts.