Contract notice: Information panels Tender in Poland - 19639255
Tender notice from Poland, published on 09 Jan 2018.
Executive Summary
The GMINA POBIEDZISKA has issued a Tender notice for the procurement of a Contract notice: Information panels in the Poland. This Tender notice was published on 09 Jan 2018 and is scheduled to close on 14 Feb 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 19639255, while the tender notice number is 006565-2018 and Register on the platform.
Object of the contract Information panels Description: Contract notice: Information panels Authority Type: Regional or local authority Contact Nature: Supplies Procedure: Open procedure Document: Contract notice Regulation: European Union Award criteria: The most economic tender CPV code: 35261000, 35261100, 48813100, 31523200, 80500000, 51612000, 51300000, 51000000, 72000000, 45262210, 45310000, 35261000, 35261100, 48813100, 31523200, 80500000, 51612000, 51300000, 51000000, 72000000, 45262210, 45310000 CPV Description: Information panels. Changing message indicator panels. Electronic bulletin boards. Permanent message signs. Training services. Installation services of information-processing equipment. Installation services of communications equipment. Installation services (except software). IT services: consulting, software development, Internet and support. Foundation work. Electrical installation work. Przetarg unlimited. Delivery, assembly and installation of information and direction boards operating on the basis of the Public Transport subsystem ITS Poznań Reference Number: ZP.271.2.2018.NB Delivery, assembly and installation of information boards and direction boards operating on the basis of the Public Transport subsystem ITS Poznań ( Municom. Premium) owned by ZTM Poznań and apologiesimplementation of training in the use of tables and subsystem "under the Project" Supporting low-emission strategies in the Pobiedziska commune by creating a comprehensive Infrastructure of Integrated Transition Nodes in Biskupice, Pobiedziska and Pobiedziska Letnisko together with the purchase of public transport means . Main Site: Pobiedziska Commune. Unlimited tender. Subject of the contractand there is the delivery and installation of information and direction boards operating on the basis of the Public Transport subsystem ITS Poznań owned by ZTP Poznań and training in the use of tables and subsystem under the Project entitled "Supporting low-emission strategies in the Pobiedziska commune by creating a comprehensive Infrastructure of Integrated Pipelines in Biskupicach, Pobiedziska and Pobiedziska Letnisko along with the purchase of public transport means. The detailed description of the subject of the order was specified in the order description (OPZ) constituting Annex 2 to this SIWZ and template contract constituting Annexe No. 6 to the ToR. 3.3. Within the framework of this order, the Contractor is obliged to: a) Supply and install information boardsaccording to the description of the subject of the order (item 1 OPZ) in the following quantities: - for the task specified in point 2.7. SIWZ as a task 1.1. (ZWP Pobiedziska) -4 items, - for the task specified in point 2.7. SIWZ as a task 2.1. (ZWP Pobiedziska Letnisko) -2 items, - for the task specified in point 2.7. SIWZ as a task 3.1. (ZWP w Biskupicach) -2 items b) Deliveries and assembly of direction boards (point 2 OPZ)�bus stop: - for the task specified in point 2.7. SIWZ as a task 1.1. (ZWP Pobiedziska) -4 items, - for the task specified in point 2.7. SIWZ as a task 2.1. (ZWP Pobiedziska Letnisko) -4 items, - for the task specified in point 2.7. SIWZ as a task 3.1. (ZWP w Biskupicach) -4 pcs. Within the scope of the subject of the Order, the Contractor, in accordance with the applicable law, mustwill be bound in particular to the following steps: a) develop technical documentation and obtain all necessary permits, arrangements, certificates and checks needed to start and correct of the implementation of the Subject of the Order (the documentation developed is to enable the execution of the Subject of the Order without the need for the Ordering Party to carry out any additional prdesigns, arrangements or arrangements), b) design documentation for the electrical and internet industry for the supply of boards and plate assembly, c) performance of the Subject of the Order based on the documentation, d) preparation of the as-built documentation, e) performance of the test run of the Subsystem and tables operating on the basis of the Subsystem in the presence of the Employer, Contractor and Representativesela ZTM Poznań, f) conducting training for min. 4 employees from the subscription service and subsystem support until the subsystem is tested. The ordering party does not specify the condition. Due to the lack of space in the announcement, we provide the following information on foreign entities: If the Contractor is established or resides outside the Republic of Poland instead of DOCUMEntow referred to in Section VI.3, point I Announcements: 1) mentioned in point I letter 2, 3, 4 places a document (s) issued in the country in which he has his registered office or place of residence, confirming accordingly that - a) his liquidation has not been opened or bankruptcy issued not earlier than 6 months before the deadline for submission of tenders b) he is not in arrears with taxes, fees, u-premiumssocial security or that he has entered into an agreement with the competent authority regarding the repayment of such claims together with any interest or fines, in particular he obtained the legally required exemption, postponement or installment payment of overdue installments or suspension of enforcement of the decision of the competent authority in full, issued not earlier than 3 months before the deadlineia tenders 2) referred to in point I (1), submit information from the relevant register or, in the absence of such register, another equivalent document issued by the competent judicial or administrative body of the country in which the contractor has its registered office or place of residence has a person who is concerned with information or a document within the scope defined in art. 24 sec. 1 points 13, 14 and 21PZP and in art. 24 sec. 5 points 5 and 6 PPL. Issued no earlier than 6 months before the deadline for submission of tenders If in the country in which the Contractor is established or domicile or place of residence has the person concerned, the documents referred to in point 7.4., Are replaced by a document containing the contractor's statement, indicating the personto either the persons entitled to represent it, or the statement of the person to whom the document was to be applied, submitted to a notary or before a judicial, administrative or professional self-regulatory or economic authority competent for the seat or place of residence of the contractor or place of residence of that person. registered office on the territory of the Republic of Poland, in relation to May personresiding outside the territory of the Republic of Poland, to which the document referred to in point 7.1 (g) applies, shall submit the document referred to in point 7.4 (2) to the extent specified in art. 24 sec. 1 items 14 and 21 of the PPL and art. 24 sec. 5 point 6 of the PPL. If in a country where the person whose document is to be residing is domiciled, such documents are not issued, it is replaced by a document containinghanding that person to a notary or to a judicial, administrative or professional body competent for the place of residence of that person. Issued no earlier than 6 months before the deadline for submission of tenders. The Employer does not make any specific requirements for the description of compliance with the condition of participation in the proceedings in relation to the verdict The condition regarding the Contractor's possession of an appropriate civil liability insurance will be fulfilled if the Contractor demonstrates that he has a third party liability insurance for a guarantee sum not less than: 250, 000 PLN. - The condition fulfillment criteria will be met / does not meet based on the information contained in the introductionhereof the statement of the EED, and then confirmed in the documents or statements submitted by the Contractor, whose offer will be the highest assessed. Contractor's statement constituting preliminary confirmation of fulfillment of the conditions for participation in the proceedings and no grounds for exclusion, is submitted on the single European order document form (hereinafter: EAT "), which pattern specifies RCommission Implementing Regulation (EU) 2016/7 of 5.1.2016 laying down a standard form for a single European order document (Official Journal of the EU, L series 2016, No. 3, page 16). The content of EAT has been specified in Attachment 3 to the ToR, however, due to the need to provide a significant amount of information in the content of EAT, the Ordering Party recommends using an editable version of this document.on the Ordering Party's website or at https://www.uzp.gov.pl/baza-wiedzy/jednolity-europejski-dokument-zamowienia. Documents submitted on request: information from a bank or a co-operative savings and credit union confirming the amount of financial resources held or the creditworthiness of the contractor, in a period not earlier than one month before the deadline for submission of tenders, ToDocuments confirming that the contractor is insured against civil liability in the scope of activities related to the subject of the order for a guarantee sum specified by the ordering party. If for justified reasons the contractor can not submit documents regarding the financial or economic situation required by the contracting authority, he may submit another document which in the roomwhich confirms fulfillment of the condition of participation in the procedure described by the orderer. Documents confirming the absence of grounds for exclusion submitted on the request: 1. an excerpt from the relevant register or from central records and business information, if separate regulations require an entry in the register or records, in order to confirm the lack of grounds for exclusion on the basis ofnot art. 24 sec. 5 point 1 of the PPL; 2. certificate of the competent head of the tax office confirming that the contractor is not in default of paying taxes, issued no earlier than 3 months before the deadline for submission of bids or other document confirming that the contractor has concluded an agreement with the competent tax authority regarding repayment of such receivables with possible interest or fines, in particular, obtained the legally required exemption, postponement or spreading into installments of overdue payments or suspension in full of the implementation of the decision of the competent authority; 3. certificate of the relevant ZUS or KRUS organizational unit or other document confirming that the contractor is not in arrears with paying social security or health insurance premiums, issued no earlier than�3 months before the deadline for submission of bids or other document confirming that the contractor has concluded an agreement with the competent authority regarding the repayment of these receivables with possible interest or fines, in particular obtained legally permissible exemption, deferral or installment payment for installments or suspension in full decision of the competent authority 4. informationfrom the KRK to the extent specified in art. 24 sec. 1 items 13, 14 and 21 of the PPL and, regarding a conviction for a prison sentence, to the extent specified by the ordering party under art. 24 sec. 5 points 5 and 6 of the PPL, issued not earlier than 6 months before the deadline for submission of tenders 5. the contractor's statement that he has not been the subject of a final court judgment or final administrative decisionthe payment of taxes, social security or health insurance premiums or, in the event of such a judgment or decision, documents proving payment of such claims together with any interest or fines or the conclusion of a binding agreement regarding repayment of such debts (in respect of the grounds for exclusion described in Article 24 (1) point 15 of the PZP) 6. the contractor's statement about the lack of a ruling against him as a preventive measure for the prohibition of applying for public orders 7. the contractor's statement that the final judgment of the conviction court has not been issued for violation of liberty or a fine to the extent specified by the awarding entity on the basis of art. 24 sec. 5 points 5 and 6 PZP 8. the contractor's statement about the lack of issuanceit is a final administrative decision on breach of obligations under labor law, environmental law or social security regulations to the extent specified by the awarding entity under Art. 24 sec. 5 point 7 PZP 9. Contractor's statement on not paying taxes and local fees, referred to in the Act of 12.1.1991 on taxes and taxlocal area 10. declaration of belonging or non-affiliation to the same capital group. Contractor within 3 days from the date of publishing information from the opening of offers on the website of the above The information is forwarded by a statement of belonging or non-affiliation to the same capital group as referred to in art. 24 sec. 1 point 23 PPL. Together with the submission of a statement, awca may submit documents or information confirming that connections with another contractor do not lead to distortion of competition in the procurement procedure. In the case of contractors jointly applying for the order, a declaration is submitted by each of such contractors. The offer consists of: • Offer Form, EED power of attorney (if required), commitment of the entity tlater, proof of payment of a bid bond. Other information on doc. in SIWZ. Internet address (URL): http://www.pobiedziska.pl Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Information panels was 14 Feb 2018. Bidding is closed.
This tender has been issued by GMINA POBIEDZISKA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 35261000 - Information panels, 35261100 - Changing message indicator panels, 48813100 - Electronic bulletin boards, 31523200 - Permanent message signs, 80500000 - Training services, 51612000 - Installation services of information-processing equipment, 51300000 - Installation services of communications equipment, 51000000 - Installation services (except software), 72000000 - IT services: consulting, software development, Internet and support, 45262210 - Foundation work, 45310000 - Electrical installation work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 19639255. The purchaser document reference is 006565-2018.
This tender falls under Defence and Security, Computer Hardware and Software Services, Other Services, Construction and Real Estate in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.