Object of the contractIndustrial machinery
Description: Contract notice: Industrial machinery
Authority Type: Body governed by public law
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 42000000, 45350000, 42996200, 45300000, 45351000, 71300000, 71320000, 71321000, 71323000, 42000000, 45350000, 42996200, 45300000, 45351000, 71300000, 71320000, 71321000, 71323000
CPV Description: Industrial machinery.
Mechanical installations.
Sewage presses.
Building installation work.
Mechanical engineering installation works.
Engineering services.
Engineering design services.
Engineering design services for mechanical and electrical installations for buildings.
Engineering-design services for industrial process and production.
Dostawa kompletnej instalacji pn. „Doświadczalna instalacjarealization of a composite board based on multi-material waste of the Tetra Pak type and plastics in Hryniewiczy near Białystok
Reference Number: NDZ.231.9.2020.DM
The subject of the order is the design, delivery and assembly (turnkey) of a complete PN installation "Experimental installation installation of composite slab based on multi-material waste type Tetra Pak and volartificial water in Hryniewiczy near Białystok.
Main Site: Municipal Waste Utilization Plant in Hryniewiczach, 16-061 Juchnowiec Kościelny, POLAND
1. The subject of the order is the design, delivery and assembly (in the turnkey formula) of a complete installation called "Experimental installation installation of a composite board based on multi-material waste type Tetra Pak and plasticsh in Hryniewiczy near Białystok.
2. The scope of the subject of the contract includes:
1) design and development of technical and technological documentation along with object inventory, measurements and tests, including obtaining all required formal and legal permits needed to complete and transfer the complete installation for operation and use;
2) prefabrication, delivery .execution and assembly of system components together with their connection into one functional whole in a turnkey formula;
3) technical and technological commissioning of the installation;
4) optimization of the installation`s operation and commissioning of the entire installation;
5) preparation of as-built documentation along with the update of archival documentation related to the investment at the Employer`so;
6) development of detailed operating instructions;
7) supply of spare parts during the warranty period;
8) training of the Employer`s personnel;
9) warranty service.
The Employer does not specify the abovementioned condition of participation in the proceedings.
In order for the Contractor to meet the conditions for participation in the proceedings regarding the economic or financial situation, the Contractor shall attach to the offer: current as at the date of submissionia offer statement in the form of a single European order document (EAT) by completing in section IV EAT only section α (alpha) "general statement regarding all qualification criteria".
Then, to confirm compliance with the conditions for participation in the procedure, the Contractor whose offer has been assessed as the most advantageous is obliged to submit upon requestpursuant to art. 26 section 1 of the Public Procurement Law:
i. the financial statement or part thereof, if the preparation of the report is required by the law of the country in which the Contractor has its registered office or place of residence, and if it is subject to examination by a certified auditor in accordance with accounting regulations, also with an opinion on the audited report or its part, respectively and in the case ofcontractors not required to prepare a financial statement, other documents specifying, for example, turnover and assets and liabilities for the last financial year, and if the period of business is shorter for that period;
ii. documents confirming that the Contractor is insured against civil liability in the scope of conducted activity related to the subject of the order nand the guarantee sum specified by the Employer.
1. The contracting authority will use the right resulting from art. 24 aa paragraph 1 of the Public Procurement Law
2. Within 3 days from the date of placing by the Employer on the website the information referred to in art. 86 section 5 of the Public Procurement Law, each Contractor, without a separate request, submits a declaration of belonging or non-belonging to the samecapital group, with the Contractor or Contractors who submitted offers in these proceedings (referred to in Article 24 (1) (23) of the Public Procurement Law).
3. Contractors are excluded from the proceedings in the cases specified in art. 24 paragraph 1 of the Public Procurement Law
4. The Employer provides for the exclusion of the Contractor pursuant to art. 24 paragraph 5 item 1 of the Public Procurement Law
5. List of statements or documents submitted by the Contractorin proceedings at the request of the Employer to confirm the circumstances referred to in art. 25 paragraph 1 point 3 of the Public Procurement Law (no grounds for exclusion):
1) information from the National Criminal Record in the scope specified in art. 24 paragraph 1 point 13, 14 and 21 of the Act, issued not earlier than 6 months before the deadline for submitting bids;
2) an excerpt from the relevant register or from the Central Register andInformation on Economic Activity, if separate provisions require an entry in the register or records, to confirm the absence of grounds for exclusion pursuant to art. 24 paragraph 5 point 1 of the Public Procurement Law;
3) the Contractor`s statement that he has not issued a final court judgment against him or a final administrative decision on arrears in payment of taxes, fees or social security contributionsor health or in the case of such a judgment or decision, documents confirming the payment of these debts together with any interest or fines or conclusion of a binding agreement on the repayment of these debts;
4) the Contractor`s statement that he has not been ordered to prevent him from applying for orders public.
6. On call he ordersdirected to the Contractor pursuant to art. 26 section 1 of the Public Procurement Law, the Contractor is obliged to submit the following statements and documents in order to confirm that the offered supplies meet the requirements specified by the Employer, referred to in art. 25 paragraph 1 item 2 of the Public Procurement Law (applies to the highest rated offer):
1) preliminary technological and technical design of the Installation, in accordance with the requirementsand contained in chapter IX. Conditions for the execution and receipt of the subject of the order, item 2.7 PFU (Volume III of the ToR);
2) initial material and financial schedule in accordance with the requirements of Chapter IX. Conditions for the execution and receipt of the subject of the order item 2.8 PFU (Volume III SIWZ);
3) quality management system certificate ISO 9001: 2008/9001: 2015 for the supply / production of waste processing equipmentevidence or other equivalent document, i.e. the Employer allows the submission of equivalent documents, i.e. documents issued by an entity authorized for quality control in the scope of supply / production of waste processing equipment.
7. The Contractor is obliged to lodge a deposit of PLN 100, 000.00 (in words: one hundred thousand zlotys) before the submission deadline.
8. The awarding entity requests the submissionand a security on due performance of the contract 10% of the total gross price stated in the offer in accordance with Chapter 13 of IDW (Volume I of the ToR).
9. In the procurement procedure, communication between the Employer and Contractors takes place using the miniPortal https://miniportal.uzp.gov.pl/, ePUAPu https://epuap.gov.pl/wps/portal and e-mail: (office @ lech .net.pl). For the date of forwardingoffers, applications, notifications, electronic documents, declarations or electronic copies of documents or declarations and other information, the date of their submission to ePUAP or electronic mail is assumed:
[email protected] (does not apply to submitted offers, which should be submitted in accordance with the provisions of chapter 15. Description of how to prepare the offer and chapter 18. Place, date and method ofsubmitting the IDW offer (TOM I SIWZ).
Internet address (URL): http://bip.lech.net.pl/