Contract notice: Hydrographic services Tender in Hungary - 24022440
Tender notice from Hungary, published on 08 Jun 2018.
Executive Summary
The ORSZÁGOS VÍZÜGYI F?IGAZGATÓSÁG has issued a Tender notice for the procurement of a Contract notice: Hydrographic services in the Hungary. This Tender notice was published on 08 Jun 2018 and is scheduled to close on 17 Jul 2018, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 24022440, while the tender notice number is 246184-2018 and Register on the platform.
Object of the contract Hydrographic services Description: Contract notice: Hydrographic services Authority Type: Other Contact Nature: Services Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: The most economic tender CPV code: 71354400, 71354400, 71354400 CPV Description: Hydrographic services. Vall. authors. in the frame of the karst model of Dunantul Reference Number: EKR000167682018 In the controversial framework of the authorship of the "Modeling of the Karate Flood Levels of the Dunantul-Koezephegyegy karstic level, the model of the early model of the Early Autonomous Region", KEHOP-1.1.0-15-2017-00010, forraskataster. Main Site-: In Dunantul-Koezephegy, the project for the development of karstic level elevation-induced phenomena, the prediction of early occurrences of karst phenomena in the early years, as well as the main task of the main building of the main building, is to solve the main tasks of the project: - Forrasok fel-lez-s, forraskasterter keszitese, - Vizhaztartasi mod- DKH sub-plotter, karst water level editing, - Scattered terrain curbing, - 5 localization models. Waterborne model developer, bottom-up. The Dunantuli-koezephegyseg karstvaztart-t leiro non-permanent, 3-dimensional, the regional model model is suppressed. The basic model of the model should be exhaustedthe DKH mainstay of the DKH will need to make a subtopic survey and the current karstic level ground level should be developed for the main armor. The regional models are also critical in the critical places where the largest watercourses are coming up with local models (5) that will help doenteshaze and forecasting. the results of which are based on the perverted teruele of the storyin the event of a breakdown. The execution of a forkstory card. The full expiration of the whole orbit of the main artery, or expedition of the periodic floods, is free of the use of existing literary, forensic and other terrestrial spheres. According to our present knowledge, 632 pieces of the rainforest of the main stone stall can be found, in the case of the first and foremost of the forraster revelations, they have to break down the burdened and early destruction of the terueletes, with the consent of the settlers in the interior of the settlers, where, on the other hand, epueletarok jelentektek, or they can be formed by a computerni. There is a danger to the perilous terrain, and this is where the potentially contaminating sources and the endangered infrastructure arise. The conscripts must also cover the following: Tata, Esztergom, Bodajk, Fehervarcsurgo, Varpalota-Inota, Veszprem-Gyulafirath, Tapolca and the Cockerel. -Expendable tasks and solutions. Early water levels and a-in the knowledge of the early stages of exploration and exploration of the endangered sites, infrastructures and the possible sources of contamination with water, the solutions to be solved must be developed for the elimination and prevention of the faculties (vizoriz-l-s, vizelv-nyes). Kueloenoes should be placed on the presently over-represented, local waters of watersThe project is based on the VGT, the Jenő Kvassay Plan and the Strategic Development Strategy. The project is largely excluded from the main road of the Dunantuli-koezephegyegy about 13, 000 km2, and also on the slopes of the mountain pastures. You can not find any information in this categorymaking, subcontracting, and may not be deemed to be a legitimate economic operator against whom the Kbt. (1) - (2) of Section 62 of the Constitution shall be exhausted. The timekeeper excludes the timer, the subtask or the eligible organization that is the cause of the exclusionary reasons or the exclusion of the excluded reason.olasi mod: To the timer and to the Kbt. (7) of Section 65 (7) of this Act, when the time has expired. (X.30.) Government Decree II. In accordance with the chapter, you have to prove in advance that you are not a part of the one-off European Documentation Document. Section 62 para. (1) and (2). Koezoes in time for a period of timeEach participant shall submit a written test to the participant. The person making the announcement shall be required to declare that he or she does not claim the contingency of the exclusionary reasons under - 62 (1) and (2). Section 69 (4) - (8) of the Basic Law on the grounds of exclusionary grounds and suitability for claimssagi actor at 321/2015. (X.30.) Government Decree III. It is necessary to prove that it does not fall under the preconditions of the justifications set forth in the foregoing paragraph. The exclusionary reasons are not justified by the provisions of Para 1 (1) - (5) and 7 (1) of the Cr. - 10, 12-16. The sections are also properly applied. For the exclusionary reasons, please refer to the Kbt. 64 and - 74-(1) of Regulation No 321/2015. (X.30.) Government Decree (1) (3) - (5) - Article 16 - In the case of a case file in progress, the submitter shall be obliged to attach to the application a copy of the registration note submitted to the cogbirosag and the certificate of the cegbirosag altal. THEin the absence of any alterna- tive memorandum in the case of the prospective applicant, a non-declaration of a negative statement is required. please refer to the information provided in the form as stated in the application form by submitting the supporting documents relating to the suitability test. Article 69 (4) according to a circular line. P / first (1) (a) of the Criminal Code provides for the submission of the summons of the summons of the summons of the summons to which all the members of the penitentiary party are present, with no more pronounced statement with the present probationer and expressed content,, or when it started to work if that was the casethey have all the answers: - give me a penzforgalmi szamlaszam, - if there were 30 days more than dense queens in the 24 months before the rush hour. For the period under investigation, the validity of the validated court is not succinct. CA on the Kb. 41- subsection (3). on the basis of the EDRs in the framework of the EDFs, from the statutory rules of electronic co-ordination, szolo 424/2017 (XII.19.) On. r. (hereinafter: e-Cr.) For other documents related to documents transmitted in the EDF, declarations made in electronic form to the declarations made in the EDF, and declarations made in electronic form, it applies. 2. AK does not make it possible for you to be in a hurry, given that it is awakeningthe results of the previous tasks can be explained by the doctorial points, and the completion of the indicator in the tam. The whole story is debated, and the regmodified result is that the focus shifts need to be more sharper or repeated. If the reseller is insured, the CA is the author. within the framework of the tasks to be carried outThe actor wants to coexist at the same time, which actors communicate with each other, the coordinating, information and control of the candidates, which are more general and can not be justified either from a technical or a penitentiary point of view. There is a possibility for the foundation of the project to be carried out in the project. 3. Providing your time offers you the time you wantoval, which has an unreasonable value of HUF 800 000. The timescales can be executed according to the Appraiser's choice. As per Section 54 (2). If the Issuer is to pay the Time Depositary with a Depositary, it shall be paid in cash for the 10032000-00319841-30005204 Money Order with AK Magyar Allamkincstarn. In this case, up to the amount of the depositit is easy to attach an azole certificate to a simple masseuse. Points in Dok. 4. The point of view of time is the best artifacts gold 5. The content elements of the timeslots according to the points of view also have an upper limit of 0.00 to 10.00. From the point of view of the CA, the better award period gets the higher score. The "Ajanlati ar" rating relative to the non-technical (translated oriosity), the quality of the qualitative aspects of the translation is straight. In terms of the qualitative criterion, the most favorable term is 36 months. You can find a detailed explanation of the methodology in this manual. AK - during the probationary period of time, the 60-day probationary period is specified in section IV.2.6 of the Recorder. 7- it does not hold consensuses, - - it has been subjected to the official quotation of the qualified journalists more strictly, - it does not allow the organization of the host organization / project portfolio to be deposited, - in the present person " For more information on the co-purchases published in the CXLIII TV series "Kr" in 2015, see the Order 321/2015 (X.30.), EEKD ", hereby announces the one-off European Dealership Document, - hereby initiates this procedure on the basis of Section 53 (6) of the Kbt., - apply Section 75 (2) (c). this can be done according to the provisions of the Kbt 56. There is no such thing as a local bejara 8. developeras a priority project project named in the framework, the "Fundamental model of the Early Renaissance of the Dunantul-Koezephegyegyed karstic water level", KEHOP-1.1.0-15-2017-00010, was launched to provide support for the project and its presentation. positive tamogatoi doentes received, and the bargain was announced by TamogAtasi has tried a contractor. The present koezb. as a result of the contract. the battalion is taken to the TSZ. mode. each of them will be tested for Tamogato subsection and the funds available for a one-time online subsidy. 135 - 12 - Based on . Internet address (URL): http://www.ovf.hu Directive: Classical Directive (2014/24/EU)
The bid deadline for Contract notice: Hydrographic services was 17 Jul 2018. Bidding is closed.
This tender has been issued by ORSZÁGOS VÍZÜGYI F?IGAZGATÓSÁG in Hungary.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 71354400 - Hydrographic services.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 24022440. The purchaser document reference is 246184-2018.