Object of the contractHistorical monument or memorial construction work
Description: Contract notice: Historical monument or memorial construction work
Authority Type: Other
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: The most economic tender
CPV code: 45212314, 45212300, 45212354, 45221113, 45236250, 45240000, 45212314, 45212300, 45212354, 45221113, 45236250, 45240000
CPV Description: Historical monument or memorial construction work.
Construction work for art and cultural buildings.
Castle construction work.
Footbridge construction work.
Flatwork for parks.
Construction work for water projects.
Vallalkozasi szerződes a nadasdladanyi Nadasdy-kastely turisztikai celu fejlesztese targyu projekt megvalositasahoz szuekseges epitesi tevekenyseg ellatasara.
Nyertes ajanlattevő a 9263�
Main Site: Hungary, Fejer (Hungary) - Main site: Hungary, Mainland: Fejer county, Nadasdladany, hrsz. 242/2, 242/3, 242/5, 217 / 15.
A) The Decem- berment includes the following:
Basic amount: 1 casting surface, approx. 2400 m terueletreszelz, bolting work, foelding, foundation, concrete, reinforced concrete structure epithets, isolation of soil moisture, interior finishing and finishing works of masonry works, renovation of arches, interior decoration, construction, strongThe main tasks to be avoided by the Nadasdy casting in the 14, 000-hectare parks of the Nadasdy castles, which are identified with 14000 plants: The underlying garden of the monumental garden is an accident-free burial ground for securely breeding it is a waste of wood and woodworkand about 65, 000 m of terrestrial parcels, which is the predecessor of the predecessors. Examination system, restoration of the castration period approx. 7800 m water supply. By ensuring that the water supply is a muddled solution, the standard of the water level, the insulator of the tomeder, the firing of two furrows, the laying of the planned artifacts, the reconstruction of the waterbath and the drainage system. Rebuilding the Toertenet System.
Total Quantity 1.
- 1 rebuilding of 16.46 m base gate,
- parcel restoration work of epitomist work
Opcios quantity 2.
1 water tower refurbishment
Reconstruction and restoration of 1 discs
1 fahid epitese
Kastely epuelet ink painting inspector working
Kastely epuelet stucco correction and / or potlasa
1600 m garden teruele• The opaque quantity is the same as the period of time.
The detailed technical description is included in the documentation. The full-time experiment for the winner is covered by all the requirements set out in the Koezbeszezssi documents. task.
B) 1. Koetterterhes completeits resale time and the length of time for the basic amount:
The first full-time respite time is the last day of the 5th full day of the authorship subordinate. For the first full-term respite time, the basic amount of technical inspector must be 30% lower than the total amount of time required.
The second full daytari honap last day. For the second full-term respite time, the basic amount of technical inspector must be 70% lower than the date of the technical inspector. The winning bidder shall complete the period of time when the technician has completed the successful completion of the full-time period, he did not take it. Feel the power of time�the present participant II.2.7. the last day of the period.
2. In the case of the opiate quantities, the capability of the bucket is even more than the opiate quantities.
3. Exceptions to full-term resourcing times as in the case of full-time veggies are accepted.
C) The periodic revocation is for the basic amount Ajanlati Ar (content frame and subtotal traffic ado nelkue(with reference to the basic amount) of 3% or the total quantity of Ajanlati Arak (containing the content and subtractive turnover data for each of the opaque quantities) is 3 to 3% of the content of an oessose content frame. The content frame that is linked to the basic amount applies to works related to the basic amount(D) The following are for the design documentation, but there are no quotes available for the basic or the opaque quantities: pawnbrother, benchmark workbook II. I go to, go to parks and their utes, their artworks, the halls of the ancients of candlelight, the reconditionthe iron rail, and the Rkőkieg-1 and Rkőkieg-2 restorative roofs. This is not a time-consuming, undervalued, and can not be considered as a legitimate economic operator against whom the Kbt. All the exclusionary reasons specified in Article 62 para. (1) - (2) are excluded.
The Provider excludes from the list the timer, the subproblem or the probable verifier(s) to whom one of the reasons mentioned in this User is limited to the same.
When submitting the deadline, the Applicant must prove in advance that he / she does not belong to the European Ecolabelling Document (EEKD). Section 62 (1) and (2) of the Act. (1) (b) and (f) of Article 62Any other reason for the exclusion of any other non-profit-making business operator who has provided a timely, subtotal or reasonably-sounding reminder shall not be excluded from the procurement procedure if the Koezbeszerzesi Hatosag is a Kb. Section (4) or in the case of a divorce case, � (5) has ruled that the wrong economic operator is in the periodprior to submitting the application, has brought in a number of reasons which would justify the credibility of the reasons for the exclusion. In the case of Section 188 (4) or in the case of a divorce, � (5) states that, at the time of the given exclusion, the economic operator shall be considered as a creditor, in the past four weeks it is probable to accept it. The final decision is enforced by the economic operator at the same time as the EEKD. Section 69 para. (4) to (7) is based on the reason for expulsion for reasons of exclusion and sufficiency of evidence, (X. 30.) Korm of the Order of the Republic of Hungary must state that it does notthe only reason for the exclusion of the reasons is that the Applicant should only submit the EEKD to the Applicant in the suitably justified case. 62 of the Code of Criminal Procedure. In the case of a subcontractor who is eligible for a fair hearing, the Applicant shall comply with the provisions of the EEKD. Section 67 para. (4)• In the context of the subprojects that do not necessarily have to be properly substantiated, (4) of � 67.
In the case of exclusionary reasons, the date and the date of receipt of the declarations made by the applicant for the period of validity of the allowance shall not be higher than that of the present applicant in the TED databasewoman postponed by day.
SZ.1. The application form is based on Section 66 (1) (c) of the Kbt., and in the case of non-Hungarian economic operators, if they are involved in the registration of the sovereign country, or in the case of settlementsin the United States of America, with a license, a right or an organization or a chamber member. Verification: in advance of the date of the provider's declaration in the EEKD. The provider does not have the form IV. information provided in this manual, but the provisional statement of suitability criteria is accepted by the economic operatorsAttempt.
The Kbt. In the case of Article 69 para. (4), the licensee shall check the qualifying condition in the database referred to in Section 59 (11) of the Kbt. In such a database or in the case where the particular host can not be verified, the validation of the relevant certification is also subject to the provisions of �� 65 (7), (9) and 67 (3). Documentation�if necessary, try to contact the e-mail at
[email protected] for the name, address, phone number, contact name and e-mail address. The search for the documentary and the testimony of the date of the expiration date to the end of the deadline are in the light of this requirement. The Kbt. Subject to Section 57 (2). Dokumentacio masra at non ruhazhato.
2nd Location of the local bej�rias, date:
8145 Nadasdladany, hrsz. 242/2, 242/3, 242/5, 217/15. You are in front of the dormitory of the dwarves.
2018/01/05 10:00 am.
3. Day 2 of Section IV.2.6 is 60 days.
4. Pitch ranges according to Eritrean criteria 0-100.
5. Professionals' professional experience in the case of technical considerations is the limitation of the point-of-the-line pointsal toertenik. The worst-hit deadline for the month is 0. In the 36th week of the week, the award-giver of all the professional aspects of the professional experience of the professionals was the one that best suits him and gives him the same amount of time as the best value. The basic amount is Ajanlati Ar, the amount of opiateg for 1, 2, 3 For the case of historical features, it is touched by the specially translated gold piece.
6. Where the Kbt. or the Kb. on the basis of the constituted hearing on the basis of the legal basis of the constitution, the author of the document provides for a document to be submitted by the author of the document, if the document can not, even if it is not legally permissible, That timet Kbt. According to Section 68 para. (2) The declaration under � 66 (2) must contain the original copy.
7 .. The periodic receipt is the date on the paper on a paper basis. The offer must be submitted on a paper basis, in full and in writing, by the deadline given in the time slot, by the deadline or by post.ARTA. The contracting authority requires the same paper everything BASED electronic copies of copies (1 CD / DVD), according to the submission of documentation of reszletezettek.
8th The tender must contain Kbt.66.� (2), (4), (5), (6) [in the negative case must declare] 134.� (5) and optionally the para Kbt.65.� (7 ) declarations, instruments according to �
9th The contracting authority for thesag trial in the case of all appropriate casualty cases was more stringent than the qualitative aspects of the sixth official and chambers of the classified advisor.
10. The language of the time is Hungarian. The listener also accepts a translation service from a non-Hungarian language translator.
11. Dates by Hungarian local time12. FAKSZ
Name: Kollmann Oers Laszlo, 00273.
13. The validity reason for applying paragraph 75 (2) (e) of the Kbt. �14 is not allowed by the winner of the winner's winner of the contract of the contracting party (15). Documents pursuant to Section 13 of Order 321/2015 (X.30.), If the case is still valid for the time-consuming (trial periodall members of the team) are to be attached to the season.
16. Due to the complexity of the complexity of the epitelium of the epic, the oesszefuels of the well-known, informatical, security and epicenter systems of the well-known epithets, the beruhazas can not be divided from technical and professional point of view. The construction of a part of the berth is not economically advantageous in its contractual framework.
Internet address (URL): http://utsz.hu/projektek/projekt_6uex22/index.html
Directive: Classical Directive (2014/24/EU)