The COMPANIA NA?IONAL? DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A. has issued a Tender notice for the procurement of a Contract notice: Highway maintenance work in the Romania. This Tender notice was published on 09 Apr 2018 and is scheduled to close on 14 May 2018, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 22268383, while the tender notice number is 151956-2018 and Register on the platform.

Key facts

Summary
Contract notice: Highway maintenance work
TOT Ref. No.
22268383
Document Ref. No.
151956-2018
Country
Romania
Notice type
Tender
Competition
ICB
Publication date
09 Apr 2018
Bid deadline
14 May 2018
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Highway maintenance work
Description: Contract notice: Highway maintenance work
Authority Type: Body governed by public law
Contact Nature: Works
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 45233139, 45221119, 45221248, 45233141, 45233251, 45233139, 45221119, 45221248, 45233141, 45233251
CPV Description: Execution of current maintenance works "Maintenance of bridges, passages, floors, tunnels. Maintenance of supporting walls and prevention of floods - for a period of 4 years D.R.D.P. Brasov, Lot 1 SDN Brasov, Lot 2 SDN Sibiu, Lot 3 SDN Targu Mures, Lot 4 SDN Miercurea Ciuc, Lot 5 SDN Sfantu Gheorghe, Lot 6 Highway maintenance section Sibiu "
Highway maintenance construction.-work
Tunnel linings construction work
Road maintenance works
Resurfacing works
Execution of current maintenance works "Maintenance of bridges, passages, bridges, tunnels. Maintenance of supporting walls and prevention of floods - for a period of 4 years D.R.D.P. Brasov, Lot 1 SDN Brasov, Lot 2 SDN Sibiu, Lot 3 SDN Targu Mures, Lot 4 SDN Miercurea Ciuc, Lot 5 SDN Sfantu Gheorghe, Lot 6 Section "Sibiu Highways".
Minimum and maximum estimated quantities for the duration of the framework agreements, as well as for each subsequent contract (year I, year II, year III, year IV) is in accordance with Annex 1 of the tender specifications for each lot in Part
Deadlines for submission / response to clarification requests / additional information:
1) In accordance with the provisions of Article 160 (1) din Law no. 98/2016, with the subsequent modifications and completions, the deadline by which any interested economic operator has the right to request clarifications or additional information regarding the awarding documentation is no more than 22 days before the deadline for the submission of bids; ) In accordance with Art. 160 par. (2) of the Law no. 98/2016, as amended andthe contracting authority will respond in a clear and complete way to all requests for clarification / additional information on the 10th day before the deadline set for the submission of tenders
1) Amount of the participation guarantee:
- Lot 1 SDN Brasov = 31 900 RON,
- Lot 2 SDN Sibiu = 27 600 RON,
- Lot 3 SDN Targu Mures = 26 200 RON,
- Lot 4 SDN Miercurea Ciuc = 21 000,
- Lot 5 SDN Sfantu Gheorghe = 23, 400 RON,
- Lot 6 Highway Section Sibiu = 31, 800 RON;
2) Form of establishment: The guarantee for participation is constituted according to the provisions of art. 36 par. (1) of GD no. 395/2016, ie it will be constituted by a guarantee instrument issued under the law by a bank or an insurance company, which is not in thespecial requisites for authorization or supervision, according to the law (Form 1)
The provisions of art. 35 38 of GD no. 395/2016. For the bank deposit guarantee, the C.N.A.I.R. SADDLE. are open at BCR Unirea RO82RNCB0082008094081283 RON or RO55RNCB0082008094081284 in euro; 3) The validity period of the participation guarantee will be at least equalwith the period of validity of the offer; 4) The participation guarantee must be irrevocable; 5) The participation guarantee must explicitly stipulate that the payment will be executed unconditionally, ie at the first request of the beneficiary, on the basis of its statement regarding guilty of the guarantor and is presented in scanned SEAP, by the deadline for submitting bids, signed with signature-based on a qualified certificate, issued by an accredited certification service provider.
In the case of the participation guarantee deposited in another currency, the equivalent will be made at the NBR exchange rate displayed on the date of publication of the SEAP participation notice. retain / refund the participation guarantee under the conditions of art. 37 38 of GD no. 395/2016. Additional information prthe guarantee of participation is found in point IV.4.4. How to present the offer. The tenderer declared winner will be a guarantee of good execution of a subsequent contract, in original, in the amount of 10% the price of each subsequent contract, without VAT, within 5 working days from the date of signing the subsequent contract. The guarantee of good execution is constituted by the transfer-bank or by a guarantee instrument issued under the law of a banking corporation or an insurance company, which becomes an annex to the contract, the provisions of art. 36 par. (3) (5) of GD no. 395/2016 applying accordingly. The contracting authority has the right to issue claims on the performance guarantee at any time during the fulfillment of the following contract "in limitIf the contractor fails to fulfill his obligations under the contract, the Contractor shall notify the Contractor and the issuer of the Guarantee Instrument, specifying the claim for the performance of the guarantee. the obligations that have not been respected, and the method of calculationof injury. In the case of execution of the performance guarantee, in whole or in part, the contractor has the obligation to re-enter the guarantee in relation to the remainder to be executed, according to art. 41 of GD no. 395/2016. The performance guarantee must be presented in accordance with Form no. 2 of the "Formulation" section of the awarding documentation.
The Bidder will fill out the Annexes to the Formul. nr. 2, depending on the manner of establishing the good execution guarantee.
The Authority will retain / refund the good execution guarantee under the conditions of art. 41 42 par. (4) of GD no. 395 / 2016.
State Budget and Own Incomes
To demonstrate the fulfillment of the qualification criteria / requirements:
1) For each batch:
Single Bidder / Associate / Subcontractorthe supporting party / party must prove that it does not comply with the provisions of art. 164 of Law no. 98/2016, with subsequent modifications and additions. In this respect, the sole bidder / associated bidder / subcontractor / third party will complete the DUAE - Part III "Exclusion Grounds", Section A "Reasons for Criminal Offenses", subsections:
- "Participation in an organizationimminent ",
-" Corruption ",
-" Fraud ",
" "Terrorist offenses or offenses related to terrorist activities",
"Money laundering or terrorist financing,
" Child labor and other forms of exploitation trafficking in human beings. "
Also, for each lot, the tenderer ranked first after applying the award criterion to the admissible tenders prior to the awardof the framework agreements, shall present, at the request of the contracting authority, the following editorial documents proving / confirming non-compliance with the situations stipulated in art. 164 above, both for the sole tenderer / associated bidder and for the subcontractor / third party stated in the offer:
- the criminal record of the economic operator and the members of the management body, management or supervision of the respective economic operator or of those who have the power of representation, decision or control within it, as it results from the certifying certificate issued by the ONRC / constitutive act, - other editorial documents, as the case may be; ) For each batch, the sole bidder / associated bidder / subcontractor / supporter must demonstrate thatu is subject to the provisions of art. 165 of Law no. 98/2016, as subsequently amended and supplemented.
In this respect, the sole tenderer / associated tenderer / subcontractor / third party will complete the DUAE - Part III "Exclusion Reasons", Section B "Reasons for Taxes or Contributions to Insurance Social "subsections:
-" Tax Payment ",
-" Insurance PaymentFor each batch, the tenderer ranked first after applying the award criterion to the admissible tenders prior to the award of the framework agreements will present, at the request of the contracting authority, the following editorial documents proving / confirming the non-compliance in the situations referred to in Article 165 above, both for the sole offeror(a) Romanian legal persons must submit: - a certificate of fiscal attestation regarding the fulfillment of the obligations to pay the taxes, taxes or contributions to the consolidated general budget, from which the taxpayer / the absence of overdue debts at the moment of presenting this certificate,
(b) Legal persons stshall present any editorial documents issued by the authorized institutions of the country of origin (tax attestation, criminal records, other equivalent documents, etc.) proving that he has fulfilled his obligations to pay taxes, duties or contributions to the consolidated general budget, in accordance with the national law of the country of residence-the sole vendor / associated offeror / subcontractor / third party or the country where the single bidder / associated bidder / subcontractor / third party is established. Note 1: The contracting authority shall exclude from the award procedure any economic operatorwho is aware that he has breached his obligations to pay taxes, duties, or contributions to the consolidated general budget, and this has been determined by a court or administrative decision having the character of a final and binding decision in accordance with the law of the State in which that economic operator is set up.
Note 2: The contracting authority will excludeit is from the award procedure an economic operator if it can prove by any appropriate means that the economic operator has breached its obligations regarding the payment of taxes, duties or contributions to the consolidated general budget - Note 3: The economic operator is not excluded from the award procedure if, prior to the exclusion decision, fulfills its obligations through pdue to taxes, duties or contributions to the general consolidated budget due or other means of extinguishing them, or benefit, according to the law, from their rescheduling or other facilities for their payment, including, as the case may be, any interest or penalties for delay accumulated or fines.
Note 4: The economic operator is not excluded from the procedure(a) is less than RON 4, 000, (b) it is higher than RON 4, 000 and lower 5% of the total of taxes, taxes and contributions owed by the economic operator to their most recent due date;in part,
The sole offeror / the associated offeror / the subcontractor / the supporting party must prove that they do not comply with the provisions of art. 167 of Law no. 98/2016, with subsequent modifications and additions.
In this respect, the sole offeror / associated offeror / subcontractor / third party will complete the DUAE - Part III "Exclusion reasons", Section C "Insolvency, confl"-" Violation of Obligations in the Field of Legislation of the Labor Code ",
-" Bankruptcy ", " - "" The violation of obligations in the field of social legislation ",
- "Insolventa",
"" Assets administered by the liquidator ",
" Agreements with other economic operators aimed at distortion of competition ",
Vinov- - "Involvement directly or indirectly in the preparation of this public procurement procedure",
- "Early cessation, damage to property, interests or other comparable penalties ",
-" Guilty of misinterpretation, non-disclosure of information, inability to provide documentrequired and obtain confidential information pertaining to this procedure. "
For each batch, the Sole Bidder / Associated Bidder / Subcontractor / Sustaining Third Party shall submit a statement of the conflict of interest in accordance with the provisions of Article 60 (1) letters a), d) and e) of Law 98/2016 on public procurement, with amendments and completionsthem. the Form no. 3 of the "Forms" section of the tender documentation, stamped and signed by the legal representative of the tenderer and will be submitted by the sole tenderer / associated tenderer / subcontractor / third party, together with the DUAE • For each lot,
The bidder ranked first after applying the award criterion, asprior to the award of the framework agreements, shall submit, at the request of the contracting authority, the following editorial documents: - - certificates / records / editorial documents proving / confirming non-compliance with the situations stipulated in art. 167 par. (1) both for the sole tenderer / associated bidder and for the subcontractor / third party stated in the offer, - editorial documents demonstrating that the sole bidder / associated bidder and the supporter / third party stated in the offer are in compliance with the provisions of art. 167 par. (2), art. 171 of Law no. 98/2016 on public procurement, with subsequent modifications and completions (if any),
- other editing documents, as appropriate.
Note 1: Account Authoritydoes not exclude from the award procedure an economic operator against whom the general insolvency procedure has been initiated when, on the basis of the information and / or documents submitted by the economic operator concerned, establishes that it has the capacity to execute the public acquisition contract. This assumes that the economic operator is either in the observation phase andhas adopted the necessary measures to draw up a feasible reorganization plan that allows a sustainable continuation of the current activity whether it is within the judicial reorganization phase and fully respects the implementation plan of the reorganization plan approved by the court. 2: It is considered that the contracting authority has sufficient plausible evidence to consider that-the economic operator has entered into agreements with other economic operators aimed at distorting competition within or in connection with this procedure if the offers submitted by 2 or more economic operators participating in the award procedure show significant similarities in terms of the content of non-standardized documents according to the attribution documentationNote 3: It is considered that the contracting authority has sufficient plausible evidence to consider that the economic operator has entered into agreements with other economic operators aimed at distorting competition within or in connection with this procedure if, within the governing bodies 2 or more economic operators participating in the award procedure are registeredare the same persons or persons who are spouses, relatives or cronies up to the second degree inclusive or who have common interests of a personal, financial or economic nature or of any other nature .. Note 4: The contracting authority is considered to have sufficient clues plausible to consider that the economic operator has entered into agreements with other economic operators aimed at distortingof competition within or in connection with this procedure if a bidder has submitted two or more offers, both individually and jointly with other economic operators or only in common with other economic operators. the contracting authority has sufficient plausible evidence to consider that the economic operator has concluded with other economic operatorsagreements aimed at distorting competition within or in connection with this procedure if a tenderer has submitted the individual offer / jointly with other economic operators and is nominated as a subcontractor in another tender. Note 6: The contracting authority will exclude a economic operator at any time of the award procedure in which he becomes aware as an operatorthe economic one is, in view of the actions or actions taken before or during the procedure, in one of the situations provided in art. 164, 165 and 167, to attract exclusion from the award procedure. Individuals holding decision-making positions within the contracting authority, as well as those within the contracting authority that may influence the documented contenther award and / or the award procedure are:
- Ionita Stefan - General Manager C.N.A.I.R. S.A.,
- Munteanu Radu Dumitru - Deputy General Manager General Direction of Exploitation of Road Infrastructure,
- Masala Ionut Laurentiu - Deputy General Manager General Economic and Financial Directorate,
- Pelin Alexandru Florin - Head of Art and Buildings Department,
- Belshe Bogdan Gabriel - Department of Art and Buildings - Head of Maintenance and Art Works,
- Basulescu Mihail Petea - Director of Auction, Investments and RK Maintenance, Barbulescu Ioana Silvia - Auction Directorate, Investment Support and RK, Head of Department Public Procurement State Budget for Investment and RK Objectives, Maintenance and Administration,
- Radu Ileana--- Auction Directorate, Investment Support and RK - Public Procurement Department State Budget for Investment and RK Objectives, Maintenance and Administration,
- Chivu Florina - Auction Direction, Investment Maintenance and RK - Public Procurement Department State Budget for Investment Objectives and RK, Maintenance and Administration,
- Mares Ion Lucian - Auction Direction, MenInvestment Manager and RK - Public Procurement Department State Budget for Investment and RK Objectives, Maintenance and Administration,
- Slubschi Ion - Auction Direction, Investments Maintenance and RK - Public Procurement Department State Budget for Investment and RK Objectives, Maintenance and Administration,
- Nunweiler Iohann - Auction Direction, Investment Maintenance and RK - Bythe Department of Public Procurement State Budget for Investment and RK Objectives, Maintenance and Administration, Head of Product Acquisitions and Direct Acquisitions, - - Goga Georgeta - Auction Directorate, Investment Maintenance and RK - Public Procurement Department State Budget for Investment Objectives and RK, Maintenance and Administration,
- Radutu Dragos Aurelian - Auction Direction, MenInvestment Manager and RK - Public Procurement Department State Budget for Investment and RK Objectives, Maintenance and Administration,
- Jipa Ileana Carmen - Auction Directorate, Investments Maintenance and RK - Public Procurement Department State Budget for Investment Objectives and RK, Maintenance and Administration,
- Farmazon Daniela - Auction Directorate, Investment Maintenance and RK--- Department of Public Procurement State Budget for Investment and RK Objectives, Maintenance and Administration,
- Bobcalca Anca Elena - Auction Directorate, Investment Support and RK - Public Procurement Department State Budget for Investment and RK Objectives, Maintenance and Administration, Chief Contracting Service,
- Gheorghita Oana Maria - Auction Directorate, Investments MaintenanceI and RK - Public Procurement Department State Budget for Investment and RK Objectives, Maintenance and Administration,
- Sultana BogdanAurel - Auctions, Investments Maintenance and RK - Public Procurement Department State Budget for Investment and RK Objectives, Maintenance and Administration,
- Dragan Cristian - Auctions, Investments Maintenance and RK - Publishing Department- - Ticu Alexandru Catalin - Financial Department, Head of CFP Service (assumption of attributions),
- Popa Raluca Marilena - Financial Department, CFP Service,
- Duina Neluta Veronica - Financial Department, CFP Service,
- Givan Danut Grigore - Financial Department, CFP Service,
- Otelea Georgian Victor - DirectFinancial Services, CFP Service,
- Dogaru Ioan Victor - Financial Department, CFP Service,
- Roman Aurelia Diana - Financial Direction, CFP Service,
- Filipescu Andrei - Juridical Director,
- Hlibocianu Ruxandra Mihaela - Juridical Division, Chief of Service Advice Consultancy,
- Targets Dana-Ecaterina - Legal Department - Legal Advisor,
- Cambosie Laura - Legal Department - ConsJuridica Stanescu Roxana-Mihaela - Legal Advisor - Legal Advisor, - Stan Andreea Roxana - Legal Directorate - Legal Advisor,
- Stan Mihai - Juridical Direction - Legal Advisor,
- Raluca-Maria Pals - Juridic,
- Apostol Mircea - Legal Division - Legal Advisor,
- Filip Gianina - Legal Division - Legal Advisor,
- Bua Alexandru Dan - Prevention and Protection Department - Specialist SSM,
- Ciobanu Eugen - Prevention and Protection Compartment,
- Nicula Adriana Alexandrina - Regional Director D.R.D.P. Brasov,
- Horga Liliana - Deputy Managing Director D.R.D.P. Brasov,
- Birta Voichita - Head of Technical Service, LA and CTE D.R.D.P. Brasov,
- Anca Ionut Adrian - Engineer D.R.D.P. Brasov,
- Nitescu Antoaneta - Engineer D.R.D.P. Brasov,
- Oniciuc Ciprian - Engineer D.R.D.P. Brasov,
- Zama Tudor Dan - Engineer D.R.D.P. Brasov.,
- Cotton Georgeta - President of the Board of Directors of C.N.A.I.R. S.A. - Members of the Board of Directors of C.N.A.I.R. Corina Anisoara,
- Ion Marilena,
- Dinca George Adrian,
- Mladinoiu Adrian,
- Pelmus Dragos-Vasile.
Members of the General Assembly of the ActionC.N.A.I.R. - S.A. do not have attributions / competencies regarding the awarding documentation and the implementation of the public procurement process. Note 1: It is a potentially conflicting situation situation where the individual bidder / associated offeror / candidate / subcontractor / supporter has members within the board of directors / management bodyor overseeing and / or having significant shareholders or associates, who are spouses, relatives or relatives up to the second degree, or who are in commercial relations with decision-makers within the contracting authority.
Note 2: It represents a situation potentially generating conflict of interest the situation in which the bidder nominated among the main peoplepersons designated for the execution of the Framework Agreements persons who are spouses, relatives or relatives up to the second degree inclusive or who are in commercial relations with decision-makers within the contracting authority. Note 3: In the situation where, following the clarifications requested by the bidder about a potentially conflicting situation, authoritythe contracting authority establishes that there is a conflict of interest, the contracting authority will take the necessary steps to eliminate the circumstances that generated the conflict of interest, including measures such as the replacement of the persons responsible for bid evaluation, where impartiality is affected wherever possible; removal of the bidder / candidate in the relationshipie with the decision-makers of the contracting authority. Note 4: In order to prove that they are not in one of the situations provided for in art. 164, 165 and 167 of Law no. 98/2016, with the subsequent modifications and completions, the bidder ranked first after application of the award criterion will present before the award of the framework agreements upon request-contracting authority, any editorial document in the country of origin or in the country where the tenderer is established, such as certificates, criminal records or other equivalent documents issued by the competent authorities of that country according to art. 168 par. (1) of the Law no. 98/2016, with subsequent modifications and additions.
Both for the sole offeror / associated bidder and for the third partyIf the documents mentioned above are not issued in the country of origin or in the country where the single tenderer / the associated tenderer / the subcontractor / the supporting party is established, or these documents do not refer to all the situations stipulated in art. 164, 165 and 167 of Law no. 98/2016, with subsequent modifications and additionsthe sole tenderer / affiliate / subcontractor / third party will either submit a declaration on his / her own responsibility, or if there is no legal provision in his / her own-liability statement, an authentic statement given to a notary, an authority administrative or judicial bodies or a professional association with competence in this respect-6: If there are uncertainties as to the existence or non-existence of an exclusion situation, the contracting authority has the right to request information directly from the competent foreign authorities. Economic operators submitting a tender must prove a form of registration under the law of their country of residence, that the economic operator is legal-that he is not in any of the situations of cancellation of establishment and that he has the professional capacity to carry out the activities covered by the framework agreement.
In order to demonstrate the fulfillment of the criterion of capacity to exercise the professional activity, the sole bidder / bidder associated third party / subcontractor will complete DUAE - Part IV "CSelection Ceremonies ", Section A" Ability to Meet Requirements ", subsection" Registration in the Trade Registry "for each lot.
For each lot, the bidder ranked first after applying the award criterion to the admissible tenders will prior to the award of the framework agreements, at the request of the contracting authority, the certificate consistedor issued by the Trade Register Office of the Territorial Tribunal in its entirety, from which it is clear that the main / secondary activity carried out according to the CAEN coding corresponds to the object of the framework agreements.
Also, in the certificate of attestation issued by the Trade Registry Office on next to the Territorial Court must find the following information: the identification data of the economic operator, the shareholders / associations, the management bodies, the administrators, the members of the Board of Directors, the members of the Supervisory Board, the participation quotas. the form of registration in accordance with the legal provisions of the country in which they are biddingl is established, from which the information required by the contracting authority will be displayed. Note 2: In the case of an association, documents will be presented for each member of the association. In order to meet the requirement, it is sufficient for the activity of each member to be in accordance with the part of the contract that he / she will make.
Note 3. If the bidder benefits-third-party support, or subcontracting parts of the contract, he / she will provide the Certificate of Conformity also for the third party claimants / subcontractors declared to the DUAE.
Internet address (URL): www.cnadnr.ro
Directive: Classical Directive (2004/18/EC)

Documents

Tender Notice
Login to view

Similar tenders

Romania Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Highway maintenance work was 14 May 2018. Bidding is closed.

This tender has been issued by COMPANIA NA?IONAL? DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A. in Romania.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45233139 - Highway maintenance work, 45221119 - Bridge renewal construction work, 45221248 - Tunnel linings construction work, 45233141 - Road-maintenance works, 45233251 - Resurfacing works.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 22268383. The purchaser document reference is 151956-2018.

See the Similar Tenders section on this page or browse other tenders from Romania.

This tender falls under Construction and Real Estate in Romania. Suppliers in these sectors can track similar Romania tenders using CPV-based alerts.