Procurement Summary
Country: Bulgaria
Summary: Contract notice: Heavy-duty motor vehicles
Deadline: 26 Mar 2020
Posting Date: 10 Feb 2020
Other Information
Notice Type: Tender
TOT Ref.No.: 40463708
Document Ref. No.: 063902-2020
Competition: ICB
Financier: Self Financed
Purchaser Ownership: -
Tender Value: Refer Document
CPV Classification
34140000 - Heavy-duty motor vehicles
Purchaser's Detail
Name: Login to see tender_details
Address: Login to see tender_details
Email: Login to see tender_details
Login to see detailsTender Details
Object of the contract
Heavy-duty motor vehicles
Description: Contract notice: Heavy-duty motor vehicles
Authority Type: Body governed by public law
Contact Nature: Supplies
Procedure: Open procedure
Document: Contract notice
Regulation: European Union
Award criteria: The most economic tender
CPV code: 34140000, 34140000, 34140000
CPV Description: Heavy-duty motor vehicles.
Delivery of new heavy duty vehicles. vehicles with hydraulic crane mounted on each of them and associated special tools, their. support documents. and floor repair. EDC, RU and CT
Delivery of 12 new heavy goods vehicles with hydraulic crane and related special tools, technical documents for maintenance and repairand the subdivisions of the EPC, Railway and Central Railway Station
Main Site: Energy section of the village - Sofia, 5A Stefansson Str. № 2 - 6, section "Signal. and telecom. "- Sofia, 5 Belogradchik Str. - 3 pieces
The subject of this contract is the delivery of 12 (twelve) new heavy goods vehicles with hydraulic k installed on each of them.wounds and related special instruments, technical documents for maintenance and repair for the subdivisions ERP, RU and CT in accordance with the requirements of the technical specification - Annex No. 1, integral part of the documentation for participation.
Not required.
Not required.
In the procedure may be attended by a participant who meets the conditions of Art. 10, para. 1 of the PPL. The contracting authority has no condition for creating a YuL under Art. 10, para. 2 of the PPL. The assignor shall remove a participant for whom the grounds under Art. 54, para. 1, items 1-7 of the Public Procurement Act, Art. 55, para. 1, item 1, item 4 and item 5 and art. 107 of the PPA, as well as the circumstances under Art. 3, item 8 and art. 4 of ZIFODRUPDRCLTDS and Art. 69 of the Anti-Corruption and Forfeiture of Illegal Acquisition Act. When the participant is a non-legal entityperson, a copy of the document for the creation of the merger must be submitted with a term not shorter than the deadline for execution of this public procurement.
The document must also contain the following information in connection with this public procurement:
1. the rights and obligations of the participants in the association;
2. the distribution of responsibility among the members of the association;
3. activities that
This document should clearly certify the designation of the partner representing the association for the purposes of the procurement and the fact that the persons in the association take joint responsibility for their participation, individually and separately. and order execution. For each member of the non-ULF subcontractthe grounds for removal, as well as third parties. Participant for whom there are grounds under Art. 54, para. 1, items 1-7 of the Public Procurement Act and Art. 55, para. 1, item 1, item 4 and item 5 of the Public Procurement Act, has the right to present evidence under Art. 56 of the PPL. According to Art. 67, para. 1 of the PPA, when submitting the offer, the participant declares no grounds for removal by submitting the EEOPP. When involvedIf an association is not a legal entity, the EEDOP is presented to each member of the association. A separate eEDOP is presented to both subcontractors and third parties. The documents proving the information specified in the EEOPP shall be submitted under the conditions of Art. 67, para. 5 and Art. 112, para. 1, item 2 of the Public Procurement Act. The documents are submitted by each member of the non-legal entity and by the subcontractors andfor third parties. The participants shall submit to their technical proposal: a certificate of registration of the company, which will carry out the installation of the crane system and its legalization with a commissioning act in accordance with Art. 36, para. 1 of the Product Technical Requirements Act (STIP), issued by the State Agency for Metrological and Technical Supervision (DAMTS), for subscription maintenance, repair and refurbishment of high-risk lifting equipment (SPO)
At the conclusion of the contract, the tenderer designated as a contractor shall submit a performance guarantee of 5% of the contract value excluding VAT. The performance guarantee shall be presented in one of the following forms:
a) original bank guarantee; or
(b) a monetary amount;
c) Stucka hook that secures performance by covering the contractor`s liability, in the original.
The terms and conditions for the retention and release of the performance guarantee are governed by the procurement contract.
Internet address (URL): www.rail-infra.bg
Documents
Tender Notice