Contract notice: Heating-plant repair Tender in Poland - 38284909
Tender notice from Poland, published on 25 Nov 2019.
Executive Summary
The PGNIG TERMIKA SA has issued a Tender notice for the procurement of a Contract notice: Heating-plant repair and maintenance work in the Poland. This Tender notice was published on 25 Nov 2019 and is scheduled to close on 10 Jan 2020, with an estimated Tender value of Refer Document.
Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 38284909, while the tender notice number is 558221-2019 and Register on the platform.
Key facts
Summary
Contract notice: Heating-plant repair and maintenance work
Object of the contract Heating-plant repair and maintenance work Description: Contract notice: Heating-plant repair and maintenance work Authority Type: Utilities entity Contact Nature: Services Procedure: Open procedure Document: Contract notice Regulation: European Union, with participation by GPA countries Award criteria: Lowest price CPV code: 45259300, 45259300, 45259300 CPV Description: Heating-plant repair and maintenance work. Performing mechanical repairs of water management equipment, carburizing, biomass feeding, dust removal, electrostatic precipitators, ash removal, network refilling system in EC Siekierki and in C Kawęczyn Reference Number: 19DOZZ938 The subject of the Order is the execution by the Contractor Ordering Party's repairs of mechanical water management devices, carbohydrateia and feeding of biomass, dedusting, electrostatic precipitators, ash removal, network replenishment system at EC Siekierki as well as carburizing, ash removal, network replenishment systems at C Kawęczyn together with the supply of necessary materials, spare parts, apparatus and devices, structural elements and installations as well as preparation of preparatory documentation, technical implementation documentation Exthe subject of the contract is the contractor's mechanical repair of water management equipment at the Siekierki CHP Plant, together with the supply of necessary materials, spare parts, apparatus and equipment, structural elements and installations, as well as preparation of preparatory documentation, detailed technical and as-built documentation. subject 1 of the order is placed in model contract 19DOZZ938-1 constituting Annex 4 to the Instructions for Contractors., to confirm that there are no grounds for exclusion based onArt. 24 paragraph 5 point 1 of the Act. 1. Contractors are excluded from the proceedings who: - have not demonstrated compliance with the conditions for participation in the procedure, or have not demonstrated the absence of grounds for exclusion, - a contractor who is a natural person who has been validly convicted of an offense: a) referred to in art. 165a, art. 181 188, art. 189a, art. 218 221, art. 228 230a, art. 250a, art. 258 or art. 270 309 of the act of6.6.1997 Penal Code (Journal of Laws, item 553, as amended) or Art. 46 or art. 48 of the Act of 25.6.2010 on sport (Journal of Laws of 2016, item 176), b) of a terrorist nature, referred to in Art. 115 - 20 of the Act of 6.6.1997 Penal Code, c) tax, if the current member of his management or supervisory body, a partner in a public or partnership company, or a completea mentor in a limited partnership or limited joint-stock partnership or a commercial proxy, a convicted person has been validly convicted of an offense referred to in art. 24 paragraph 1 point 13 (excluding conviction of that person for an offense specified in Article 24 paragraph 1 point 13 letter d of the Act, Article 133 paragraph 4 of the Act), - for which a final court judgment or final administrative decision on arrears has been issued taxes, feesor social security or health insurance premiums, unless the Contractor has made the payment of taxes, fees or social security or health insurance due together with interest or fines or has entered into a binding agreement on the repayment of these amounts, which - as a result of intentional act or gross negligence misled the Employer in presenting information, that it is not subject to exclusion, meets the conditions for participation in the proceedings or objective and non-discriminatory criteria, hereinafter referred to as "selection criteria", or which has suppressed this information or is unable to provide the required documents, - which, as a result of recklessness or negligence, provided misleading information Employer, which may have a significant impact on decisions taken by Zcontracting authority in the contract award procedure, - who unlawfully influenced or attempted to influence the Employer's activities or obtain confidential information that could give him an advantage in the contract award procedure, - who participated in the preparation of the contract award procedure or whose employee, as well as a person performing work on the basis of a mandate contract, work contract, agency contractor other contract for the provision of services, participated in the preparation of such proceedings, unless the resulting distortion of competition can be eliminated in a different way than by excluding the Contractor from participation in the procedure, - which with other Contractors has concluded an agreement aimed at distorting competition between Contractors in the procurement procedure, which the Employer is in stnot to be shown by appropriate means of evidence, - being a collective entity for which the court has ruled out a ban on competing for public contracts, - for which a preventive measure has been imposed forbidding public procurement, - Contractors who belong to the same group capital submitted separate offers, offers, unless they show that existing links between themand do not lead to a distortion of competition in the procurement procedure, - in respect of which liquidation has been opened or whose bankruptcy has been announced, with the exception of the Contractor who, after declaration of bankruptcy, entered into an arrangement approved by a final court decision. Ordering Party pursuant to Art. 24aa section 1 of the Public Procurement Law may first evaluate the offers, and then examine whether the contractor, about whichthe offer has been assessed as the most favorable, it is not subject to exclusion and meets the conditions for participation in the proceedings. The offer together with all attachments is submitted in electronic form with a qualified electron signatureor a certified copy of the original by submitting a qualified electronic signature by the Contractor. All documents prepared in a foreign language must be submitted together with their translations into Polish. The offer with attachments must be signed (with an electronic signature) by the person (s) authorized to represent the Contractor. Authorization (power of attorney) to pa copy of the offer should be attached to the offer, unless it results from other documents attached by the Contractor. By submitting his bid, the Contractor accepts in full and without reservation the terms of the contract set out in the Specification of the Essential Terms of the Order (hereinafter referred to as "Terms of Reference"), together with everything attachments constituting its integral part. For preliminary confirmationthat the Contractor is not subject to exclusion and fulfills the conditions for participation in the procedure, the Contractor attaches to the offer a current statement as at the date of submission of offers in the form of a uniform document available in editable form placed on the website of the Employer. The contractor who refers to the resources of other entities in to demonstrate that there are no grounds for excluding himonce fulfilled, to the extent that their resources are referred to, the conditions for participation in the proceedings, it also submits in an original electronic form uniform documents regarding these entities, signed by the entity to which the documents relate. In the case of joint application for the contract by, the uniform document is to be submitted in electronic form by each of the contractors jointlyapplying for the order. These documents confirm the fulfillment of the conditions for participation in the procedure and the lack of grounds for exclusion to the extent in which each of the contractors demonstrates that they meet the conditions for participation in the procedure and the lack of grounds for exclusion. 29 paragraph 3a of the PPL Act requires employment by the Contractor on the basis of an employment contract of persons performing executive supervisiony over the implementation of the subject of the contract, the Contractor shall submit a Declaration contained in Annex 1 to the Instructions for Contractors. Internet address (URL): www.termika.pgnig.pl
The bid deadline for Contract notice: Heating-plant repair and maintenance work was 10 Jan 2020. Bidding is closed.
This tender has been issued by PGNIG TERMIKA SA in Poland.
The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.
This tender is Self Financed
The tender is classified under the following CPV code(s): 45259300 - Heating-plant repair and maintenance work.
The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.
The TendersOnTime reference is 38284909. The purchaser document reference is 558221-2019.