Expired Tender Poland ICB TOT Ref. 38284908

Contract notice: Heating-plant repair Tender in Poland - 38284908

Tender notice from Poland, published on 25 Nov 2019.

Executive Summary

The PGNIG TERMIKA SA has issued a Tender notice for the procurement of a Contract notice: Heating-plant repair and maintenance work in the Poland. This Tender notice was published on 25 Nov 2019 and is scheduled to close on 10 Jan 2020, with an estimated Tender value of Refer Document. Interested bidders can access detailed Tender information, eligibility criteria, and complete bidding documents by referencing TOT Ref No. 38284908, while the tender notice number is 558220-2019 and Register on the platform.

Key facts

Summary
Contract notice: Heating-plant repair and maintenance work
TOT Ref. No.
38284908
Document Ref. No.
558220-2019
Country
Poland
Notice type
Tender
Competition
ICB
Publication date
25 Nov 2019
Bid deadline
10 Jan 2020
EMD
Refer Document
Tender value
Refer Document
Purchaser ownership
-
Financier
Self Financed

CPV classification

Purchaser details

Purchaser contact is for registered users

Login to see details

Tender details

Object of the contract
Heating-plant repair and maintenance work
Description: Contract notice: Heating-plant repair and maintenance work
Authority Type: Utilities entity
Contact Nature: Services
Procedure: Open procedure
Document: Contract notice
Regulation: European Union, with participation by GPA countries
Award criteria: Lowest price
CPV code: 45259300, 50530000, 45259300, 50530000
CPV Description: Heating-plant repair and maintenance work.
Repair and maintenance services of machinery.
Performing the overhaul of the capitalized cooling water system, technological and heating mains at Siekierki CHP Plant cooling, technology and busheat distribution plant at the Siekierki CHP Plant together with the supply of necessary materials, spare parts, apparatus and equipment, structural elements and installations as well as preparation of preparatory documentation, technical and as-built technical documentation.technological and heating mains at the Siekierki CHP Plant together with the supply of necessary materials, spare parts, apparatus and equipment, structural elements and installations, as well as preparation of preparatory documentation, technical and as-built technical documentation.No. 4 to the Instructions for Contractors.
The Contractor shall, upon his request, submit an excerpt from the relevant register or from the central register and information on business activity, if separate provisions require an entry in the register or the register, in order to confirm the absence of grounds for exclusion pursuant to art. 24 paragraph 5 point 1 of the Act.
1. Contractors who are: - not listed are excluded from the procedureali meeting the conditions for participation in the proceedings, or have not demonstrated the absence of grounds for exclusion,
- being a natural person who has been validly convicted of an offense:
a) referred to in - Art. 165a, art. 181-188, art. 189a, art. 218-221, art. 228-230a, art. 250a, art. 258 or art. 270-309 of the Act of 6.6.1997 Penal Code (Journal of Laws, item 553, as amended) or - art. 46 or art. 48 of the Act of 25.6.2010 on disputecie (Journal of Laws of 2016, item 176),
b) of a terrorist nature referred to in art. 115 - 20 of the Act of 6.6.1997 Penal Code,
c) tax,
- if an office member of his management or supervisory body, a partner in a public or partner company or a general partner in a limited partnership or limited joint-stock partnership or a commercial proxy have been validly convicted of an offense, what timewa in art. 24 paragraph 1 point 13 (excluding conviction of that person for an offense specified in Article 24 paragraph 1 point 13 letter d of the Act, Article 133 paragraph 4 of the Act),
- for which a final court judgment or final administrative decision on arrears has been issued taxes, fees or social security or health insurance contributions, unless the contractor has paid taxes, fees orsocial security or health insurance contributions together with interest or fines, or has entered into a binding agreement on the repayment of these debts, which - as a result of intentional act or gross negligence misled the awarding entity in presenting information that it is not subject to exclusion, meets the conditions for participation in the procedure or objective and non-discriminatory criteria, called dathe "selection criteria", or which concealed this information or is unable to provide the required documents,
- which, as a result of recklessness or negligence, provided information misleading the contracting authority that could have a significant impact on the decisions taken by the contracting authority in the procurement procedure,
- who unlawfully influenced or attempted to influence the order activitiesor obtain confidential information that may give him an advantage in the procurement procedure,
who took part in the preparation of the procurement procedure or whose employee, as well as the person performing the work under the mandate contract, work contract, agency contract or other contract services, was involved in the preparation of such proceedings, unless the disturbance caused by thiscompetition can be eliminated in a different way than by excluding the contractor from participating in the proceedings,
- which with other contractors has entered into an agreement aimed at distorting competition between the contractors in the procurement procedure, which the contracting authority is able to demonstrate by means of appropriate evidence,
- being a collective entity against which the court has decided to ban applicationspublic procurement based on the Act of 28.10.2002 on liability of collective entities for offenses under pain of punishment,
- against which a preventive measure was banned from applying for public procurement,
- contractors who belong to the same capital group, within the meaning of the Act within the meaning of the Act of 16.2.2007 on competition and consumer protection, submitsli separate offers, partial offers or requests to participate in the procedure, unless they show that the existing relationships between them do not lead to distortion of competition in the contract award procedure,
- in relation to which the liquidation was opened.
They may apply for the order contractors who are in an economic or financial situation, i.e. will showfrom an average annual amount of at least PLN 4, 000, 000 for the period of the last 3 financial years, and if the period of activity is shorter then such average annual income for that period. Net income from the sale of products, goods and materials "or" Net income from the saley and compared with " revenues from this period divided by the number of corresponding yearsh this period. If the revenue is given in foreign currencies, then the Employer will convert them according to the average NBP exchange rate Table A published on the day of sending the contract notice for publication in the Official Journal of the European Union. In the absence of publication of the exchange rate of this currency by the National Bank of Poland on the day referred to above, the Employer shall apply the average exchange rate of this currencyyou last announced by the National Bank of Poland before the above-mentioned day.
Ordering party based on art. 24aa section 1 of the Public Procurement Law, may first evaluate the offers and then examine whether the contractor whose offer has been assessed as the most advantageous is not subject to exclusion and meets the conditions for participation in the procedure.
The offer, eat and attachments to the offer should be null and voidbe prepared and submitted in electronic form with a qualified electronic signature on the internet platform at https://termika.eb2b.com.pl/. All documents drawn up in a foreign language must be submitted together with their translations into Polish.
The offer and attachments must be signed by the person (s) authorized to represent the Contractor. Authorization (proxylist) to sign the offer should be attached to the offer, unless it is clear from other documents attached by the Contractor.
By submitting his tender the Contractor accepts in full and without reservation the terms of the contract as set out in the Specification of Essential Terms of the Contract (hereinafter referred to as "Terms of Reference") together with all attachments constituting its integral part.
For preliminary useconfirming that the Contractor is not subject to exclusion and meets the conditions for participation in the procedure, the Contractor attaches to the offer a current statement as at the date of submitting the offers in the form of a single document available in editable form and in the file 19DOZZ939-espd-request.xml posted on the website https: // termika.eb2b.com.pl/ in the "Attachments" tab, according to the standard form templateuala specified in the European Commission implementing regulation issued on the basis of art. 59 clause 2 Directive 20 14/24 / EU and Art. 80 clause 3 of Directive 2014/25 / EU.9.5.
The contractor who refers to the resources of other entities in order to demonstrate the absence of grounds for exclusion and compliance with them, to the extent to which their resources are referred to, the conditions for participation in the proceedings, submitsalso uniform documents regarding these entities.
In the case of joint application for the contract by the contractors, the single document shall be submitted by each of the contractors jointly applying for the contract. These documents confirm compliance with the conditions for participation in the procedure and the absence of grounds for exclusion to the extent that each of the contractors demonstrates compliance with the conditions for participation in the procedure andno grounds for exclusion. Augustowka 30. Meeting at 10:00 at the porter's lodge. Participation in the local vision is not mandatory. The Contractor by 10/12/2019 until 12:00 will be sent to the Ordering Party to the e-mail address [email protected] or [email protected] list of persons who will take part in the local vision, giving names and surnames of ID cards or passports (for foreign citizens). For organizational reasons, the Employer asks each Contractor to delegate up to 3 persons
Internet address (URL): www.termika.pgnig.pl

Documents

Tender Notice
Login to view

Similar tenders

Poland Public Procurement Intelligence

Frequently asked questions

The bid deadline for Contract notice: Heating-plant repair and maintenance work was 10 Jan 2020. Bidding is closed.

This tender has been issued by PGNIG TERMIKA SA in Poland.

The tender value is not disclosed; please refer to the tender document. EMD / bid security details are provided in the tender document.

This tender is Self Financed

The tender is classified under the following CPV code(s): 45259300 - Heating-plant repair and maintenance work, 50530000 - Repair and maintenance services of machinery.

The tender notice and related documents are listed in the Documents section above. Select a document to view or download it. Please log in or register to access the documents. If you cannot find additional documents in the Documents section, please log in to your account and Send Document Request from your account section.

The TendersOnTime reference is 38284908. The purchaser document reference is 558220-2019.

See the Similar Tenders section on this page or browse other tenders from Poland.

This tender falls under Construction and Real Estate, Defence and Security in Poland. Suppliers in these sectors can track similar Poland tenders using CPV-based alerts.